AIP-2 Kickoff Workshop Energy SBA Session Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff.

Slides:



Advertisements
Similar presentations
GEO Task AR AIP-2 Kickoff Workshop NCAR Mesa Laboratory September 2008.
Advertisements

AIP-2 Demo Capture Workshop 4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy.
GEOSS AIP-2 Development Interim Design Review Portals & Application Clients Transverse WG Nadine Alameh
AIP-2 Kickoff Workshop [Your Topic] Session Overview [Session co-lead names] GEOSS AIP-2 Kickoff September 2008.
Guidelines for Basic Geographic Data DA AIP Phase 2 Kickoff Workshop September 25-26, 2008 Boulder, Colorado, USA Yoshikazu FUKUSHIMA Secretariat.
AIP-2 Kickoff Workshop Energy SBA Session Report Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2.
GEO Task AR AIP-2 Kickoff Workshop Mid-term plenary NCAR Mesa Laboratory September 2008.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot Products, Sensors, Models Access Services WG WG Points of Contact:
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
GEO Task AR Architecture Implementation Pilot, Phase 2 (AIP-2) Kickoff Workshop NCAR Mesa Laboratory September 2008.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.
AIP-2 Kickoff Workshop Energy SBA Scenario Description Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff September 2008.
GEOSS Task IN-05 Architecture Implementation Pilot AIP-5 Point of Contact: George Percivall Open Geospatial Consortium (OGC) March 2012.
GEO Task AR AIP-2 Kickoff Workshop Closing Plenary NCAR Mesa Laboratory September 2008.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Energy Task Ellsworth LeDrew, Point of Contact, GEOSS Energy, Thierry Ranchin, Co-chair, Renewable Energy Community of Practice, Marion Schroedter-Homscheidt,
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
Core Task Status, AR Doug Nebert September 21, 2008.
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
IGOS-P 15 and GEO Achievements planning meeting in May 2008 at UNESCO, Paris Report to 4 th C4, 17&
GEOSS Common Infrastructure (GCI)
Earth Observation Envelope Programme Earthnet / Third Party Missions EarthWatch programme ERS & ENVISAT Missions The Living Planet Programme Meteo missions.
CEOS WORKING GROUP ON CAPACITY BUILDING AND DATA DEMOCRACY Background and 5 Year Plan.
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
Comparative Emergency Management Damon Coppola June 10, 2010.
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Energy Session KO Summary Lionel Ménard - Session Lead - MINES ParisTech Kick-off Meeting May.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
GEO Work Plan Symposium 2015 Energy: new initiatives Thierry Ranchin.
WGISS CNES SIT-30 Agenda Item 10 CEOS Action / Work Plan Reference 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015.
The Group on Earth Observations (GEO): An Introduction.
Earth Sciences Sector Canada Centre for Remote Sensing By John Lyon and Co-Chairs, UIC Introduction to the UIC: A User Requirements Approach Gary J. Foley,
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Task IN-05 GEO Work Plan Symposium 2014 IIB AIP-7 (May 1 st ) Reporting: Bart De Lathouwer (OGC)
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ESA/FAO Contribution STATUS & PLANS ADC Full Committee Geneva 1 March 2007.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Disasters Management Session- Hervé Caumont - Session Lead - OGC IP Team AIP-5 Kick-off Meeting,
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
© GEO Secretariat 10 th UIC Outcomes User Interface Committee Sofia Antipolis, February 2009 UIC co-leads / GEO Secretariat Geneva, Switzerland.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Core Task Status, AR Doug Nebert September 22, 2008.
DA Task Report Report by Rick Lawford and Toshio Koike ADC Meeting September 2008 Boulder.
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) Ingo Simonis Open Geospatial Consortium (OGC) ADC 17, Salzburg September 2011.
Report Breakout session Energy and Mineral Resources Management.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot Access Services: Products, Sensors, Models WG Access Services Co-Chairs:
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEO Task AR-09-01B AIP-3 Kickoff Workshop Closing Plenary ESA-ESRIN Frascati, Italy March 2010.
George Percivall, Open Geospatial Consortium
NOAA Data User Workshop: Access Tools
Steve Peedell Joint Research Centre
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
GEO Architecture Implementation Pilot
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
Closing Plenary.
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Session 4: Finalize Project Working Arrangements
Presentation transcript:

AIP-2 Kickoff Workshop Energy SBA Session Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff September 2008

Session Agenda Introduction By Ellsworth LeDrew (5 minutes) Self introductions of persons in the session (10 min) Description of the scenario and objectives (5 min) Presentations by: –Michael J. Brewer (NOAA NCDC): The US Drought Portal: Contributing to Energy Security and Sustainability (on-line demo) –Thierry Ranchin (Mines ParisTech): Answers for the "Mines ParisTech team and Partners Open Discussion (20 min) Develop a work plan for the topic: dates and actions (10 min)

Energy Session Community objectives (from Annex B) linked with Task EN-07-03: –Renewable energy sources (RES) for electricity production – The exploitation of these energies requires accurate knowledge of the resources and of their availability (in space and time) as well as accurate forecasts in the different phases of an energy system life cycle.

Scenario objectives Support the SBA Energy by developing services providing irradiance data among other parameters Simulating the case of the sitting of a solar power plant.

?

List of responses Data providers: –Mines ParisTech (Primary Participant) –NOAA NCDC NIDIS (Primary Participant) –ACRF, CIESIN, NASA World Wind, NOAA NCDC GOSIC, NOAA SNAAP (Contributing Participants) Portal, ClearingHouse and Workflow support: –Compusult, ESA, ESRI –Testing facilities – USGS Enterprise Modelling: –INCOSE

AIP-2 Master Schedule Milestone Due Date CFP Issued 26 June 2008 Clarification Teleconference 18 July 2008, 1300 UTC Kickoff Response Due Date* 1 September 2008 Kickoff Workshop at NCAR, Boulder, CO, USA September 2008 Status and Interim results to GEO Plenary November 2008 Final results of Phase 2 AIP 1st Quarter 2009