1 Part of the OECM joint pilot program for Project Management Lessons Learned Mike Reitz, NA-54 May 5, 2010 Status/DEMO of the Project Management Lessons.

Slides:



Advertisements
Similar presentations
EU Presidency Conference Effective policies for the development of competencies of youth in Europe Warsaw, November 2011 Improving basic skills in.
Advertisements

FIS Enterprise Solutions EPK/EPM Implementation
Management System Owner Briefing for Terry Tyborowski (acting EM-60)
Briefing for New Functional Area Owners
Requirements Engineering Processes – 2
1. XP 2 * The Web is a collection of files that reside on computers, called Web servers. * Web servers are connected to each other through the Internet.
How Will it Help Me Do My Job?
Take another look Alison Hayman Search Solutions Unit Dissemination Divison February 2011 Statistics Canada site search.
Project Management Lessons Learned (PMLLs) Status & Developments Michael Reitz Office of Enterprise Project Management, NA-APM-20 9/13/2011.
Defense Nuclear Security Lessons Learned Center
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
March 2007 Mi Kyung Lee National Assembly Library of Korea.
2-1-1 Disaster Data Management System AIRS Conference – New Orleans 2 nd Session May 23, 2012.
Data Architecture at CIA Dave Roberts Chief Technical Officer Application Services, CIO CIA
1 Any views expressed related to procedural or explanatory material are those of the author and not necessarily those of the U.S. Census Bureau.
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
1 Targeted Case Management (TCM) Changes Iowa Medicaid Enterprise October 14, 2008.
Michigan Electronic Grants System Plus
Making the System Operational
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
1. Bryan Dreiling Main Contact for Three Year Plans
Gaining Senior Leadership Support for Continuity of Operations
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Microsoft Office 2010 Basics and the Internet
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Configuration management
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Contract Management Planning
Information Systems Today: Managing in the Digital World
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Campaign Overview Mailers Mailing Lists
Fostering Ad-Hoc Collaboration Between Marketing and R&D Departments
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Microsoft Office Illustrated Fundamentals Unit C: Getting Started with Unit C: Getting Started with Microsoft Office 2010 Microsoft Office 2010.
Building repositories Iryna Kuchma, eIFL Open Access program manager, eIFL.net Presented at “Open Access: Maximising Research Impact” workshop, May 25.
Checking & Corrective Action
IS-700.A: National Incident Management System, An Introduction
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
Michelle Mizumori Director of Reliability Coordination
1 Attributing the costs of health & social care Research & Development – Understanding AcoRD Trudi Simmons Senior Manager – Research Finance & Programmes.
Functional Areas & Positions
A Virtual Research Environment for the Study of Documents and Manuscripts 1 1 Research administration Resource discovery Data creation, use and analysis.
1 FL EDI R3 Test Requirements Rule 69L , F.A.C.
Macromedia Dreamweaver MX 2004 – Design Professional Dreamweaver GETTING STARTED WITH.
Pasewark & Pasewark Microsoft Office XP: Introductory Course 1 INTRODUCTORY MICROSOFT WORD Lesson 8 – Increasing Efficiency Using Word.
25 seconds left…...
XP New Perspectives on Browser and Basics Tutorial 1 1 Browser and Basics Tutorial 1.
® Microsoft Office 2010 Browser and Basics.
1 EM Recovery Act Lessons Learned Presenter John Lee EM Recovery Act Program Presented to: DOE Corporate Operating Experience Committee.
Chapter 10: The Traditional Approach to Design
Systems Analysis and Design in a Changing World, Fifth Edition
We will resume in: 25 Minutes.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
- 1 - Defense Security Service Background: During the Fall of 2012 Defense Security Service will be integrating ISFD with the Identity Management (IdM)
1 Literacy PERKS Standard 1: Aligned Curriculum. 2 PERKS Essential Elements Academic Performance 1. Aligned Curriculum 2. Multiple Assessments 3. Instruction.
Contract Audit Follow-Up (CAFU) 3.5 Pre-Defined & Ad hoc Reports November 2009 ITCSO Training Academy.
1 7/24/09 National Nuclear Security Administration Office of Defense Nuclear Security (DNS) DNS Security Lessons Learned Program Ted Wyka Director, Security.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
DOE Nuclear Safety Research and Development Program
Presentation transcript:

1 Part of the OECM joint pilot program for Project Management Lessons Learned Mike Reitz, NA-54 May 5, 2010 Status/DEMO of the Project Management Lessons Learned Subsystem within the DOE Corporate Lessons Learned System

3 Background of DOE PMLL – Why? Requirements: DOE O 413.3A mandates that Lessons Learned (good or bad) from the execution of projects be collected, analyzed and disseminated among the DOE project management community. Learn the good practices and avoid the repeats of bad practices. The OECM 2008 Root Cause Analysis Report and the associated Corrective Action Plan call for the development of a Lessons Learned System within the DOE Project Management Community to share information on good and bad experiences in project management. Overall: We dont share information effectively. BOTTOM LINE: We need to be a learning organization that communicates and shares information well and timely. If pilot project results are deemed suitable for full implementation, OECM intends to implement DOE-wide.

4 Background – PMLL Efforts Last year, a joint OECM-NNSA pilot was initiated. Examined three systems (ProjNet, DOE Corporate LL System (DOE CLLS), and ePegasus). Developed a data structure for project management lessons learned input and retrieval to meet our needs. Tested ProjNet and DOE CLLS and identified strengthens and weaknesses of both systems. Worked with DOE HS to develop a tailored version of the DOE CLLS for project management attributes. This year, OECM added EM to the pilot and both systems (ProjNet and the Modified DOE CLLS) are being tested in a production environment.

5 Objectives of the PMLL Subsystem pilot / demonstration: To demonstrate that a modification/upgrade to the DOE Corporate Lesson Learned System can create a simple, user-friendly, and functional Project Management Lessons Learned application meeting the primary needs for a DOE project management lessons learned system (collect, retrieve, disseminate and UTILIZE LLs) while satisfying the requirements of DOE Order 413.3A and DOE Order 210.2: DOE Corporate Operating Experience Program: –Operating experience lessons learned must be collected, stored, and retrieved through a central clearinghouse that allows ready access to and communication about collected information on a timely, unimpeded basis by all DOE elements. If the Project Management LL system (such as ProjNet) was separate from DOE Corporate LL System (CLLS) then data would need to be migrated to the DOE CLLS and be retrievable there. Data migration and data format consistency issues were identified as a potential challenge to any PMLL system separate from the DOE CLLS.

6 DOE Corporate PMLL Subsystem (Ss) Pilot Team OECM, the PMLL Pilot project sponsor and lead. NNSA, NA-54, the Pilot project administrator in FY09. In FY 2010, performing demonstration of the Pilot PMLL Subsystem (Ss) DOE HS-32 manages the DOE Corporate Operating Experience Program, including the DOE Corporate Lessons Learned Database, and is a full partner in the PMLL Ss pilot. The HSS IT support group is also actively engaged. An NNSA CIO / IT representative The Integrated Project Team includes representatives from Pantex and Y-12 DOE Operating Experience Committee (OEC) network. Others: SRS Pit Disassembly & Conversion (ProjNet - UCNI data for design reviews).

7 PMLL Subsystem Pilot Status NNSA issued guidance to our Federal Project Directors (FPDs) to submit PMLLs at Quarterly Project Reviews (QPRs). (Expect projects to submit a PMLL every other quarter.) –Identified Operating Experience Committee (OEC) LL Coordinators at the NNSA Site Offices as coordination POCs. –Encouraged the Acquisition Executives to address PMLL in QPRs. Initial Alpha roll-out of PMLL Ss in mid-October Demonstration of system shell to OECM in late October. Announced the Pilot PMLL Ss at the December OEC and the January NNSA Federal Project Directors Monthly Conference Calls. –Distributed a fill-able PMLL submission template to orient users to the new format. Template is easy to distribute and users do not have to go to the DOE Corporate LL website. –DNFSB requested a briefing; good news story, Feb 15…..March 30 th ! The DOE Corporate Project Management Lesson Learned module went activate in full Production mode on March 22, 2010 (one week behind schedule). Lessons learned from the NNSA QPRs are being placed in this new system. Smaller NNSA sites (NTS and SRS) and pilot sites (Y-12 and Pantex) are further ahead as it was easier to integrate the Project Management and the Operating LL communities.

8 Work Function Technical DisciplinesCritical DecisionFacility Type Budget/FinanceArchitecturalPre-CD-0Administrative CommunicationBiologicalCD-0Infrastructure Construction Chemistry/ChemicalCD-1D&D - Nuclear Crosscutting/MultipleCivil/ StructuralCD-2D&D - NonNuclear Design/EngineeringElectrical CD-3Production-Nuclear EnvironmentalEnergyCD-4Production-NonNuclear Human ResourcesEnergy ConservationNon-CDR&D - Nuclear Infrastructure/Site/UtilitiesEnvironmental R&D - NonNuclear Integrated Project TeamGeological Security/Safeguards LegalHealth/medical Site-Wide Management/AdministrativeInformation Technology Storage - Nuclear Operations and MaintenanceMechanical Storage - NonNuclear Procurement / ContractingNuclear - Non Safety Waste - Nuclear Program Mgmt (above Project level)Real Estate Waste - NonNuclear Proj. Controls/Parameters (Cost,Schedule,Scope)Safety - Nuclear Other Quality Assurance (Training)Safety - NonNuclear Regulatory/Oversight (DNFSB, NRC, etc.)Science Reviews (Technical, EIR, IPR, ICE, etc.)Technology Risk ManagementTransportation Safety Security / Emergency Management Other / N.A.

9 After users log in to the DOE Corporate Lessons Learned System, this screen is displayed. Popular choices from the left main menu are: Submit Lesson Search Database

10 Submit Lesson After the user clicks on the main left menu Submit Lesson, this screen is displayed. The user can then select the type of LL to submit which will take the user to the appropriate type of submittal form.

11 Project Management Lessons Learned online submittal form

12 Project Management Lessons Learned online submittal form (page 2 of 4):

13 Project Management Lessons Learned online submittal form (page 3 of 4):

14 Project Management Lessons Learned online submittal form (page 4 of 4):

15 To search the Lessons Learned database, the user clicks on Search Database from the left main menu. Users can restrict search to one database or all databases. Search Database

16 Search results Search was restricted to Project Management Lessons Learned (no other criteria identified)

17 This is one of the search results (#4) from the previous screen Search results, contd

18 Search Results (contd)

19 PMLL submittal form our users will be using to route their draft LL among reviewers prior to formal submission online Page 1 of 5

20 PMLL submittal form for routing draft LLs (contd) Page 2 of 5

21 PMLL submittal form for routing draft LLs (contd) Page 3 of 5

22 PMLL submittal form for routing draft LLs (contd) Page 4 of 5

23 PMLL submittal form for routing draft LLs (contd) Page 5 of 5

24 Next Steps The PMLL system went into production mode on March 22, In the near future, the distribution/List Server for the Project Management/FPD community will be established. Working to arrange training via Live Meeting or equivalent system. (Using train- the-trainer approach). Continuing to develop connectivity between OEC Lessons Learned community and Project Management LL community in the development, review, submission and utilization of PMLLs. NNSA needs to develop better guidance for the process. OECM is working to develop a Memorandum of Agreement (MOA) between OECM and HS on a PMLL partnership. Tracking the submissions of NNSA PMLLs through the QPR process. Reworking some of the CD-4 summary level LL /lists into the proper DOE Corporate LL System format and content. Working with HS to enhance the Search capabilities on DOE Corporate LL System and related PMLL Subsystem.

25 Future Ideas/Options Similar to the Defense Nuclear Security Lessons Learned Center, accessible through the DOE CLLS, exploring the creation of a PMLL homepage as a resource center related to PMLLs. Exploring the utilization of Subject Matter Experts (SMEs) in conjunction with Project Management Lessons Learned by networking with the NNSA Service Centers Talent Database of experts in the Technical Qualification Program (TQP). – Talent database is limited to Service Center personnel but could be expanded to M&O sites using TQP categories to classify resumes. SC could still be the interface. Further explore Autonomy (data mining, search engine) for DOE complex-wide document searching and linking with the M&O LL databases.

26 Conclusion Now that a tool / product appears to be established - We need to complete the process of submitting, retrieving, disseminating and utilizing PMLLs. We are further engaging the NNSA FPDs, their IPT members, and the OEC LL community to fully test, demonstrate and deploy the PMLL Subsystem and the related processes. Again, we need for NNSA to be an enterprise-wide learning organization that communicates and shares information in real time across the complex.