1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Module N° 4 – ICAO SSP framework
Course Material Overview of Process Safety Compliance with Standards
Radiopharmaceutical Production
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
INPO Update CMBG Meeting June 2013
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
1 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Configuration Management Activities, Including Margin Management David Hembree INPO June.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Financial Controls Task Force Report Joint Financial-HRMS Unit Liaison Meeting March 17, 2004 Mike Kalasinski Norel Tullier Cheryl Soper.
What is Program Management?
AMR Proprietary and Confidential FAA Compliance Training.
Quality Assurance/Quality Control Policy
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
ISO 9000 Certification ISO 9001 and ISO
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
RoadTek Business Systems Ownership Briefing Session July 2003.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
Nuclear Industry Assessment Committee Overview ASQ Energy & Environmental Conference August 28, 2006 Ed Stankiewicz Joseph Oat Corporation NIAC Chairman.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Operational Experience Metrics Task Team August 7, 2009.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
25 August UCA International Users Group Testing Quality Assurance Program Funding Issues 25 August 2010/ Updated 12 October 2010 Jack Robinson,
Obsolescence Impact on Configuration Management
QUALITY MANAGEMENT STATEMENT
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
What GPOs are Doing to Promote Ethical Compliance Megan Barry VP, Ethics and Compliance Premier, Inc.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
CM Tools Data Management Trends Wednesday, June 4, 2008 Laurent Perkins Enterprise Informatics.
TOTAL QUALITY MANAGEMENT
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Prepared for GAMES Spring 2014 Attendees By Mary Nicholas, MHA President / CEO HQAA, Inc.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
2016 PROPOSED BUDGET: FINANCE DEPARTMENT OCTOBER 20, 2015 DEAN ROHLA FINANCE DIRECTOR.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Standard Design Process Overview
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Certifying Data in Controlled Databases for Direct Use ERIC PACE CM GROUP SUPERVISOR 1.
Department of Public Works FY 2015 Operating Budget May 19, 2014.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Allen Independent School District November 7, 2016
ISO/IEC
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
Flooding Walkdown Guidance
Enterprise Content Management Owners Representative Contract Approval
Accreditation Update Regional Municipality of Durham March 15, 2018.
Using CM to Maintain the Design Basis
Timothy Hackman, Paula Greenwell, James Spring, and Hilary Thompson
Chapter 7 Maintenance and Engineering Organization
Document Update Benchmark results
IMPACT OF EASA ON MAINTENANCE ORGANISATIONS IN CANADA J Hall
Margin Management Configuration Management Benchmarking Group
PSEG Nuclear, Engineering Services – Configuration Management
EQUIPMENT RELIABILITY AT KOEBERG
Vendor Technical Information
PSEG Nuclear, Engineering Services – Configuration Management
DOE Review of the LCLS Project October 2006
Radiopharmaceutical Production
Presentation transcript:

1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering Services – Configuration Management

2 CMBG 2009 PSEG Nuclear Salem Unit 1 PWR 1,228 MWe Salem Unit 2 PWR 1,216 MWe Hope Creek BWR 1,268 MWe

3 CMBG 2009 Background As a result of the Feb 1983 Salem Anticipated Transient Without Scram (ATWS) event, PSEG Nuclear was committed, via response to NRC Generic Letter and Salem/Hope Creek UFSARs, to the maintenance of Vendor Technical Documents (VTDs) associated with certain key safety-related equipment. The PSEG Nuclear VTD Program consists of two elements: Recontact program and “Daily” program. –The Recontact program maintains the requirements of GL (periodically contact vendors of key safety related equipment and a program with Nuclear Steam Supply System (NSSS) vendor to cover all safety-related components within the NSSS scope of supply). –The Daily program maintains the safety related documents not required in GL and non safety- related documents (everything else).

4 CMBG 2009 History Feb 22, 1983 – Salem ATWS event July 8, 1983 – Generic Letter Mar 20, 1990 – Generic Letter May 14, 1990 – Generic Letter Supplement 1 Oct 7, 1992 – Generic Letter Supplement 1 Mar 1996 – PSEG formed a Vendor Engineering Group Nov 2005 – Elimination of Vendor Engineering Group IAW the Exelon OEM Aug 2008 – Nuclear Oversight (NOS) audits program – finds three areas of concern

5 CMBG 2009 What Happened As a result of the implementation of the Exelon model, starting in 2005, the Vendor Engineering Group was eliminated and its functions were not turned over to Vendor Document Coordinators (VDCs), SMEs, and System Managers. NOS identified the VTD Program as an Area Requiring Management Attention (ARMA) based on the aggregate of three issues.

6 CMBG 2009 Issues 1.Vendor recontact documents have not been updated in a timely manner when Subject Matter Expert (SME) reviews are required. 2.Several vendor recontact documents were closed in SAP with “no action required” when they actually required SME reviews to satisfy procedural requirements and GL requirements. 3.The Engineering Services Director has not assessed Vendor Information Services (VIS), the vendor that performs the recontact program activities, every two years to ensure program compliance in accordance with VTD procedure.

7 CMBG 2009 Upon Further Investigation… 1.The Salem FSAR still stated we would interface with vendors for EVERY safety-related component. 2.Review (again) of key-safety related documents showed not all documents are required to be in the program. 3.The Vendor Engineering Group had been updating “Daily” VTDs with parts lists, Bills of Material, catalog information, Certificates of Conformance, and other material not related to vendor instructions. 4.One vendor publication may be part of multiple VTDs. For example, pub XYZ is part of multiple VTDs and therefore, every pub revision would require multiple VTD revisions.

8 CMBG 2009 Fixes Revised Procedure Created “Desk Guides” on how to administer and evaluate documents in the VTD Program Updated the Salem UFSAR to state Key vs. All Station Management ownership Eliminated unnecessary document updates Reviewed all documents in the Recontact program and eliminated documents that are not required Created department PIs Audited recontact vendor Changed vendor audit frequency from two to three years (to align with contract) Added VTD Program to Corporate Self Assessment schedule

9 CMBG 2009 Benchmarking October 2008, a VTD benchmarking questionnaire was sent to the CMBG contacts database list While the questionnaire was geared towards staffing, basic VTD “demographics” was asked 17 Utilities, 21 sites responded 7 sites had 1 FTE administering the program, 5 sites had a VTD group The number of documents in recontact program varied between 35 and 4,400 (average of 538)

10 CMBG 2009 Cost Savings Do a Self Assessment of your program –Prevents any findings from INPO, NRC or your QA Department Review document updates for unnecessary updates –PSEG Nuclear eliminated 65% of the items sent to the document coordinator Review documents in your recontact program –PSEG Nuclear eliminated ~ 15,000 documents from the program in This resulted in a $375,000 annual savings. –PSEG Nuclear eliminated an additional 10 documents from the program in This resulted in a $850 savings. If possible, maintain only one publication in one Vendor Document –Reduces updated time and administrative processing and time

11 CMBG 2009 Cost Savings (continued) Compare your program to the generic letter and your companies response to the NRC. –PSEG Nuclear was just removing any document from vendors that went out of business or were unresponsive – now have to review 145 documents that were removed. Utilize a vendor to do your recontacting. –Vendors charge a flat fee (between $85-$100 per document) and supply a comparison report. –Vendors have all of the equipment manufactures contact information –Vendors know who bought who –Vendors have a rapport with equipment manufactures Update your recontact documents in a timely manner –If you use a vendor to do your recontacting, they may recontact the same document if not updated within three years.

12 CMBG 2009 OE As a result of numerous company buyouts and mergers, it is now recommended to re-re-contact vendors of documents whose policies may have changed. Specifically, those vendors who stated that their publications: –are not subject to revision and should be used for the life of equipment OR –may be revised but revision provided with equipment at time of purchase should be used for the life of equipment

13 CMBG 2009

14 CMBG 2009 Advertisement CM Café 1 Vendor Technical Information Library Room 13:00-16:30 (1:00-4:30)

15 CMBG 2009 Questions Questions? Paul Davis PSEG Nuclear