1 Michigan Merit Examination (MME) Spring 2013 MME Accommodations Briefing September 20, 2012.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Spring 2013 Florida Alternate Assessment Test Coordinator Responsibilities Lake County Schools Tonya Mass Testing Program Specialist 1.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Rowland Unified School District (Slides from ETS) CAHSEE Test Site Coordinator Information.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
GEtServices Services Training For Suppliers Requests/Proposals.
Measured Progress © OCCRA Paper Administration Training Thank you for joining us, we will begin in a few moments. Tinamarie Skillings and Monique.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1 Michigan Merit Examination (MME) Spring 2011 MME Accommodations Briefing September 29, 2010.
1 MME Accommodations: ACT-Approved or State-Allowed? Assessment and Accountability Conference 2008.
BAA Web Conference Series 2012 Michigan Merit Examination (MME): Fall Update and Upcoming Activities.
January 28, 2008 Michigan Merit Examination Spring 2008 Critical Update Office of Educational Assessment and Accountability Michigan Department of Education.
1 OEAA Web Conference Series MME Overview Martha S. Caswell MME Administration and Reporting Consultant.
1 Michigan Merit Examination (MME) Spring 2012 MME Accommodations Briefing September 22, 2011.
Presentation transcript:

1 Michigan Merit Examination (MME) Spring 2013 MME Accommodations Briefing September 20, 2012

2 Welcome and Introductions Michigan Department of Education –Jim Griffiths –Robin Wright ACT –Cassie Rochholz

3 Questions? –

4 Objective Understanding the impact of each type of accommodation on student results What accommodations require ACT approval? What accommodations are a local decision?

5 Objective How to use the MME Accommodations Summary Table – revised Spring 2013 How to obtain the appropriate accommodated test materials for eligible students

6 Reminder Does NOT replace the required MME Test Administration Training in November

7 Objective Understanding the different types of accommodations available on the MME –ACT-Approved vs State-Allowed –WorkKeys Eligible –National Career Readiness Certificate (NCRC) eligible –Standard vs Nonstandard

8 Michigan Department of Education Robin Wright MME Project Manager

9 MME Assessment Design Day 1 – ACT Plus Writing Day 1 – ACT Plus Writing Day 2 – WorkKeys Day 2 – WorkKeys –Reading for Information –Applied Mathematics –Locating Information

10 MME Assessment Design Day 3 – Michigan component Day 3 – Michigan component –Mathematics –Science –Social Studies

11 MME Accommodations Test Window Day 1 – ACT Plus Writing Day 1 – ACT Plus Writing March 5 – 19, 2013 Day 2 – WorkKeys Day 2 – WorkKeys March 6 – 20, 2013 Day 3 – Michigan component Day 3 – Michigan component March 7 – 21, 2013

12 MME Accommodations Test Window Test Sequence Test Sequence Each student must take each Each student must take each test in sequence test in sequence –All of Day 1 in sequence –before all of Day 2 in sequence –before all of Day 3 in sequence

13 Questions? –

14 ACT Cassie Rochholz Director of State Testing

15 Accommodation Type ACT-Approved or State-Allowed –Applies to Day 1 Testing only –ACT Plus Writing

16 Day 1 Webcast Day 1 Information ACT Webcast Introduction Available at:

17 TAC Establishment/Renewal Packets TAC Profile Form –Due to ACT October 5 –All Schools – online New Combined Accommodations Brochure –Procedures document –TAC Header –ACT-Approved Accommodation Application

18 Checklist of Dates Application for ACT-Approved Accommodations –Due to ACT November 30, 2012 Request (online) for State-Allowed Accommodated materials –Due to ACT February 13, 2013 –

19 New – No Cassettes No longer request cassettes as a test format for any Test Day –Day 1 – AA and SA –Day 2 – Workkeys –Day 3 Michigan Component DVD Reader Script

20 ACT Accommodations Special Situations Transfer Accommodations New Student or newly classified as grade 11 Newly Identified Disability Medical Emergency or Late Onset Condition State-Allowed Materials Order Deadline February 13

21 ACT Accommodations Special Situations Transfer Accommodations New Student or newly classified as grade 11 Newly Identified Disability Medical Emergency or Late Onset Condition State-Allowed Materials Order Deadline February 13

22 MME Accommodations Summary Table Primary resource in determining Day 1 accommodations application process Available on the MME web page

23 MME Accommodations Summary Table Eligible for ACT-Approved? State-Allowed only? Local Decision?

24 Day 2 and Day 3 Accommodations WorkKeys and Michigan component WorkKeys and Michigan component Local decision Local decision –Based on students IEP, 504 Plan, or ELL instruction –Accommodation student receives during regular instruction

25 Day 2 and Day 3 continued… You must order Day 2 and Day 3 accommodations materials Requesting Day 1 materials has nothing to do with obtaining Day 2 and Day 3 materials You must use the BAA Secure Site for this process

26 Day 2 and Day 3 continued… No paperwork to submit Order accommodated materials on the BAA Secure Site: December 3 – January

27 Day 2 WorkKeys Accommodations WorkKeys Supervisors Manual State Special Testing Admin Codes on Day 2 Answer Document Day 2 Answer Document Supplement –Box 26 on Day 2 Answer Document

28 WorkKeys-Ineligible Accommodations WorkKeys scores will not be issued for students using accommodations considered WorkKeys-Ineligible –The use of an unapproved testing aid –Translation of test items –Interpretation of test items –Admin Codes

29 NCRC Eligibility WorkKeys scores obtained using accommodations marked Yes may be eligible for the NCRC provided the necessary criteria to earn one of the four levels of Certificate are achieved. WorkKeys tests administered using accommodations marked No are ineligible for the NCRC.

30 MME Accommodations Summary Table – Day 3 Standard accommodation (S) Standard accommodation (S) –Does NOT change the construct of the test –Counts toward: Valid MME scores School accountability –If supported by the students IEP, 504 Plan, or ELL instruction

31 Accommodations Materials ACT ships Day 1 and Day 2 accommodations materials to TAC –Day 1 in kits AA based on students approved SA based on quantity ordered –Day 2 not in kits Based on quantity ordered

32 Questions? –

33 Michigan Department of Education Robin Wright MME Project Manager

34 Accommodations Materials Day 3 accommodations materials One secure shipment to Test Supervisor –Standard time One secure shipment to Test Accommodations Coordinator One secure shipment to Test Accommodations Coordinator –Accommodated materials

35 TAC Responsibilities After Testing Day 1 Answer Document Supplement Day 2 Answer Document Supplement Day 3 Test Administration Manual

36 Accommodated Return Shipments Day 1 Return Envelopes and Cartons Day 2 Plastic Polymailer Bag process Both return to ACT in Iowa City, IA

37 Accommodated Return Shipments TACs will prepare the Day 3 accommodated materials for return shipment to Measurement, Inc. in Durham, NC

38 Additional Information Required Test Administration Training One half-day sessionOne half-day session Week of November 12Week of November 12 MME web page

39 Questions? –

40 Michigan Department of Education Jim Griffiths Manager Assessment Administration And Reporting

41 Questions?

42 ACT Contact Information For ACT or WorkKeys specific questions: ACT State Special Testing (Accommodations) ACT State Special Testing (Accommodations) ext ext

43 MME Contact Information

44 Michigan Merit Examination (MME) Spring 2013 MME Accommodations Briefing September 20, 2012