LACNIC V – 18 / 20 november 2003 - Havana, Cuba Monitoring Lame Delegations Frederico A C Neves.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Variations of the Turing Machine
Monday HW answers: p B25. (x – 15)(x – 30) 16. (t – 3)(t – 7)29. (x -2)(x – 7) 19. (y – 6)(y + 3)roots = 2 and (4 + n)(8 + n)34. (x + 7)(x.
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Processes and Operating Systems
STATISTICS HYPOTHESES TEST (I)
Early Childhood Educational Environment Codes Illinois State Board of Education and Harrisburg Project 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Technical Aspects of the Transitional Process Mexico City, 11/12 Nov 2002 Frederico A C Neves.
LACNIC IVSANTIAGO DE CHILEApril 25, 2003 ARIN Update Richard Jimmerson Director of Operations.
IPv6 allocations to closed networks LACNIC VI Mar 29 – Apr 1, 2004 Montevideo, Uruguay.
Axel Pawlik. LACNIC IV, 25 April 2003, Santiago. 1 Update from the RIPE NCC.
Reverse DNS SIG Summary Report APNIC Annual Member Meeting Bangkok, March
Operational Policies for NIRs in the APNIC Region NIR Meeting APNIC14, Kitakyushu, Japan 4 Sept 2002.
1 ASO Update APNIC 21 Friday 3 March 2006 Kenny Huang.
1 RIR Policy Development Update Policy SIG 8 Sep 2005 APNIC20, Hanoi, Vietnam Save Vocea.
Protecting Resource Records in APNIC Whois Database Database SIG APNIC-16, Seoul August 2003 Sanjaya
TWNIC RMS Update 16 th APNIC NIR SIG TWNIC Sheng Wei Kuo Aug, 2003.
Spearheading Internet technology and policy development in the African Region Resource Services Report.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
Year 6 mental test 5 second questions
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
1 Understanding Multiyear Estimates from the American Community Survey.
INTERNET PROTOCOLS Class 9 CSCI 6433 David C. Roberts Entire contents copyright 2011, David C. Roberts, all rights reserved.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
1 FY10 ACS Methods Panel Update Jennifer Guarino Tancreto Chief, ACS Data Collection Methods Staff Decennial Statistical Studies Division Presentation.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Annual Title 1 Parent Meeting
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
1 Addition of IPv6 servers to in-addr.arpa tree DNS Operations Sig APNIC 18 2 September 2004, Fiji.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
Essential Cell Biology
APNIC 15 LACNIC REPORT Raúl Echeberría LACNIC CEO APNIC 15 - Taipei, Taiwan.
PSSA Preparation.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne.
Sweeping lame DNS reverse delegations APNIC16 – DNS Operations SIG Seoul, Korea, 20 August 2003.
LAME – Next Steps Mark Kosters, CTO. Delegations tested daily until test good or removed If still lame after 30 consecutive days of testing, POCs notified.
The APNIC Whois Database Introduction and Usage. whois.apnic.net whois.ripe.netwhois.arin.net Server Unix Client ‘X’ Client Command Prompt / Web Interface.
Test cases for domain checks – a step towards a best practice Mats Dufberg,.SE Sandoche Balakrichenan, AFNIC.
11 y 12 Noviembre. México DF LACNIC III Inverse Resolution - proposal Frederico A C Neves.
Sweeping Lame DNS Delegations A Proposal DNS OPS SIG APNIC 15, Taipei, Taiwan 26 February 2003.
1 Discussion of the new DNS generation system DNS Operations SIG APNIC 18 2nd September 2004, Fiji.
Whois Domain Object Authorisation APNIC18 – DB SIG Nadi, Fiji 2 September 2004.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Open Address Policy Meeting APNIC Reverse DNS October 26th, Brisbane Bruce.
APNIC LAME NS measurements. Overview Methodology Initial outcomes from 128 days runtime How bad is the problem? LAME-ness trends Proposals for dealing.
4343 X2 – The Application Layer Tanenbaum Chapter 7.
Monitoring, analyzing and cleaning DNS configuration errors across European NRENs Slavko Gajin University of Belgrade, Serbia
Implementation of ARIN's Lame DNS Delegation Policy
Networking Applications
Presentation transcript:

LACNIC V – 18 / 20 november Havana, Cuba Monitoring Lame Delegations Frederico A C Neves

LACNIC V – 18 / 20 november Havana, Cuba Whats this ? To the inverse domain work there is a need of a direct delegation inside an special zone in-addr.arpa As any dns parent to child zone delegation when there is some types of inconsistencies the domain doesnt work This is generally called lame delegation

LACNIC V – 18 / 20 november Havana, Cuba Current Procedures Accept delegation only on correct configured servers Check (at least) –correct delegations weekly –Lame delegations every 2 days Report at Whois Report to contacts twice a month for lame delegations lasting more than a week

LACNIC V – 18 / 20 november Havana, Cuba Lame definition Executes a non-recursive SOA query at delegated servers. –NON AUTH-answers –Unknown domain name –Unknown host –ServFail –Query/Connection Refused –NOT SOA –CNAME –SOA Version On multi-zone delegations a single delegated server for one of the zones makes it as lame as the type of the prevailing error.

LACNIC V – 18 / 20 november Havana, Cuba Whois sample out-put inetnum: /19 status: allocated owner: NEWCOM AMERICAS ownerid: GT-NEAM-LACNIC responsible: Manuel Noriega address: 13 CALLE 3-40 ZONA 10, EDIFICIO ATLANTIS OFICINA 1, 1, 1 address: Guatemala - GT country: GT phone: [] owner-c: NEA2 tech-c: MAN inetrev: /23 nserver: NSGT1.NEWCOM-NS.NET nsstat: UDN nslastaa: nserver: NSSV1.NEWCOM-NS.NET nsstat: UDN nslastaa: nserver: NSHN1.NEWCOM-NS.NET nsstat: NOAA nslastaa: remarks: ADDRESSES WITHIN THIS BLOCK ARE NON-PORTABLE created: changed:

LACNIC V – 18 / 20 november Havana, Cuba Statistics % of delegated servers 03/Dec/ % (2393 in 5299) 26/Jun/ % (1947 in 5578) 19/Nov/ % (1561 in 6006) UDN18.2% UH 2.8% NOAA 1.7% CNAME 0.5% FAIL 1.1% Q/CREFUSED 1.2% ZONE_NOT_SYNC 0.5%

LACNIC V – 18 / 20 november Havana, Cuba Statistics updated daily at

LACNIC V – 18 / 20 november Havana, Cuba Next Steps Community policy enforcing the correction of lame delegations (LACNIC policy process) Check NS records correctness and glue absence. Possibly adopt or work to define a standard for lame delegation.

LACNIC V – 18 / 20 november Havana, Cuba Questions ?

LACNIC V – 18 / 20 november Havana, Cuba ERX report 22 blocks completed –76 direct allocations, 17 update. 41 blocks remain to be completed until April/2004 The so called swamp space schedule TBD Ongoing status page at –