1 RMS Training Sponsored by the RMS Center July 2006.

Slides:



Advertisements
Similar presentations
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
P2 – RMS Interface May P2 – RMS Interface P2Local RMS CRMS On demand Or scheduled Nightly.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Overview May 2010.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Reports for Dummies May 2010.
Paperless Online Payroll, Integrated HR & Report Generating System.
Spillman Sentryx 6.0.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Billing for Departmental Users
Chapter 9 Chapter 9: Managing Groups, Folders, Files, and Object Security.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Planview for Resource Managers: Create Your Project
Plex Training. 2 Course Objectives Learn how to Log on and Change Passwords in Plex Learn the Common Functions on the Control Panel Learn how to Log into.
US Army Corps of Engineers November 2007 Access Control.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
Using Task Manager to Work EDI/ERA Posting Lori Phillips CHUG at Centricity Live April 29 – May 2,2015.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
RMS Overview July 2006.
VERSION 7 What’s to Come?. Workflow – Lifecycle Definition  Ability to define custom Lifecycles NEW BEING WORKED IN REVIEW WAITING FOR APPROVAL APPROVED.
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
Introduction to our On-Line Self Service Center at
MIP Workbench: Revisions FEMA Learning Management System PROJECT ADMINISTRATION ROLE.
1 RMS Training Sponsored by the GRD - SBH January 2007.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
| See the possibilities… Job Costing & Work In Process.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Moodle (Course Management Systems). Managing Your class In this Lecture, we’ll cover course management, including understanding and using roles, arranging.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
1 RMS Training Sponsored by the RMS Center May 2010.
Student Fees A-Z. Ed Kobus This document contains confidential proprietary trade secret information of SunGard K-12 Education. This file is not to be.
Gold – Crystal Reports Introductory Course Cortex User Group Meeting New Orleans – 2011.
Contractor Mode December,  No official date for full switchover from QCS 2.38 to RMS 3.0 contractor mode  State of the RMS Support Contract 
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
07/16/2007 C&G Officer User Guide for eCAFSlide 1 C&G Officer User Guide for eCAF.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Reports for Dummies July 2006.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
“Discovering institutions that work for poor people” APPP Sharepoint training 30 July – 1 August 2008: CDD, Accra, Ghana “Discovering institutions that.
Chapter 1 Page ref. Chapter 1 Company File Setup and Maintenance 1.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Integrated ISO ILL for staff users Borrowing requests – part two Yoel Kortick 2007.
Installing RMS 3.0 Contractor Mode
Title of presentation Name(s) of author / presenter / co-authors
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Melissa Wagner & Jaime Patel
Contractor Mode Administration Tab Overview
Regional Architecture Development for Intelligent Transportation
Standard Operating Procedure
Contractor Mode Import/Export: Overview
Sponsored by the RMS Center
Students Welcome to “Students” training module..
Orders & Shipment Tracking
Contractor Mode Finances: Overview
QCS An Overview Savannah District Project Engineer 16 Nov 06
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Setting Up a New Contract
Utility Billing Balancing the Accounts Receivable
Education Admin Training.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

1 RMS Training Sponsored by the RMS Center July 2006

2 RMS Training Objectives for this session: To provide a brief overview to aid in using the current version of the RMS software.

3 RMS Training HOME (Contracts) SUMMARYOFFICE LOCAL LIBRARY DISTRICT LIBRARY SYSTEM LIBRARY RMS Main Menu Selections

4 As you are required to log into RMS using your assigned name and password, you will be able to distinguish between the contracts you have access to and those that you have been denied access to by checking the Display Contracts with Access Denied block at the lower left of the window. The first selection, HOME, presents the contracts control center and will include everything to do with the particular contract you have selected. You have the option of displaying all the contracts in an office or selected (active, future, completed contracts) contracts for the individual office, as well as any Sub-Offices that may be applicable.

5 The second selection, SUMMARY, presents the interface control center and includes everything to schedule the refresh days and times with other Corps programs as shown. In addition, the Contract Groups selection is one of the most important areas for the Manager and/or “Read Only” viewer. Custom Reports is an added feature to permit you to create summary level reports, such as the Status of Construction Report. Contractor Claims can be added and/or tracked from this level.

6 The third module, Office, tracks data pertaining to the offices and staff that will interface with RMS for all contracts. The staffing will include all local users and other support staff, such as the Contracting Officer, submittal reviewers from other offices, etc. This is also where individuals are given access and permissions to work in various areas of RMS and is where you assign staff members’ access to particular contracts or portions of contracts. Access Control is discussed in Chapter 2 of the User’s Manual.

7 The fourth module, Local Library, contains all the libraries maintained by the Local Office. In this option you have the ability to select and either add, edit or delete information contained in the Local Library. This allows you to customize the libraries to fit the requirements of your local operation and management preferences. It is important to ensure that the libraries contain all desired information to cover the myriad of management styles in your field office organization. Changes made in this Library affect all contracts assigned to your office. A good rule to consider is: “If you didn’t put it in the Library, don’t remove it!” Somebody else may have the information there for a reason.

8 The fifth module, District Library, contains all the libraries maintained by the District Office (In GRD, it is actually the Division Library). Within this option is the ability to select and add, edit or delete information contained in the District Library. This provides uniformity of field offices in areas considered appropriate to be directed or shared from District Staff, policies and procedures. It is important to ensure that the libraries contain all desired information to cover the areas listed. Changes made in the Library affect all contracts within the database that fall under the District (DIVISION) Office.

9 The sixth module, System Library, contains all the libraries maintained by the RMS Center. These libraries include HQUSACE policy-driven selections that will seldom change and are considered critical enough that uniformity throughout all USACE Offices is required. Also, there are Word Document samples, such as plans and form letters, that you will be able to copy into your Local Library and modify them as desired in your office. These documents will be updated periodically and new, or revised, items will be added as they become available. The RMS Center also maintains the Master 3-Phase Checks within this library. These checks will also be periodically updated by the Seattle District.

10 RMS Training ADMINISTRATIONFINANCESQA/QCSUBMITTALSSCHEDULESCLOSEOUTIMPORT/EXPORT RMS Contract Menu Selections

11 Administration - This area presents what we need for the normal administrative functions of a typical contract. It is where we will enter the descriptive data and status for the contract and setup the various areas for the contract to utilize RMS in a more meaningful way for the particular contract or Customer. Letters pertaining to the contract will be here under Correspondence and Request for Information. Tracking data for Prime Contractor, Subcontractors, Insurance, Payrolls and Labor Standard Interviews will be found here also.

12 Finances - Anything to do with MONEY will be found with this selection. It is the place where CEFMS data is exchanged and we “load” our Construction Working Estimate (CWE) for management purposes. Contractor Activities, Modifications and Progress Payments are made from this selection. Contractor Claims are available from this location, as well as the Summary level.

13 QA/QC – Whether you are using RMS or a paper napkin to manage contracts, pre-job planning cannot be overlooked. There are just some tasks that the Resident Office must tackle; Quality Assurance and Quality Control are two of the more important ones. RMS simply makes it orderly and consistent. Tracking and reporting tools are found here, as are the tools for setting up the three-phase inspection checklists and planned Labor Standard Interviews. Contractor control and reporting tasks are also included with this selection. The daily Quality Assurance Report (QAR), the Quality Control Report (QCR) and QC requirements are accessed through this selection.

14 Submittals - Submittal Logs and Transmittal Logs are located here. The ENG Form 4288 and ENG Form 4025 are populated from the data entered. Submittal Reviewers are entered from this area, as is the formal transfer of the submittals to the Customer at the conclusion of the contract. Submittal sections include the MasterFormat 1995 and the newer MasterFormat 2004 library versions from SpecsInTact.

15 Schedules – Anything to do with DATES will be found in this section. Dates included here include the Feature Schedule, Activity Schedule, Milestone Schedule and the Monthly Placement Schedule.

16 Closeout – Closeout activities can consume a significant amount of resources and, if not managed carefully, will be put off until the least opportune time…at the end of the job, when you are really too busy to worry about items that have already taken place. This module is updated throughout the life of the contract and will produce almost effortlessly the DD Forms 1354, 1149, and This section is a major time saver. After the contract is completed you will be making periodic Warranty Inspections. This is the place to record the results and actions of the Warranty Inspections.

17 Import/Export – Importing data from a variety of sources is another key feature of RMS. Whether you need to import from the Contractor version of RMS (QCS), a Contractor scheduling package (SDEF) or the submittal register, it is all done from this selection. RMS will also export to other programs, such as P2 and the Government stand- alone program, QAS, which is similar in principle to the Remote QCS program used by our Contractors.

18

19

20

21 RMS Training Questions?