River Kelvin Case Study

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Managing Flooding Hard and Soft Engineering LO: to understand the types of hard and soft engineering used to control rivers and the advantages and disadvantages.
Managing Flooding Hard and Soft Engineering. HARD ENGINEERING This uses technology, large amounts of money to try and control the river. It can prevent.
Use of a hydrodynamic model to
Importance of Land use management on the Flood Management in the Chi River Basin, Thailand Kittiwet Kuntiyawichai Bart Schultz Stefan Uhlenbrook F.X. Suryadi.
6-8 May, 2008 Toronto, Canada Developing a Flood Warning System: A Case Study Mohammad Karamouz Professor, School of Civil Engineering, University of Tehran,
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
End of Chapter 4 Movement of a Flood Wave and begin Chapter 7 Open Channel Flow, Manning’s Eqn. Overland Flow.
Modelling of the 2005 flood event in Carlisle Jeff Neal 1, Paul Bates 1, Tim Fewtrell, Matt Horritt, Nigel Wright, Ignacio Villanuaver, Sylvia Tunstall,
Kinematic Routing Model and its Parameters Definition.
Applications of Scaling to Regional Flood Analysis Brent M. Troutman U.S. Geological Survey.
4 th International Symposium on Flood Defence, 6 th – 8 th May 2008, Toronto, Canada Efficiency of distributed flood mitigation measures at watershed scale.
HEC-RAS Version 3.1 Tributary Junctions
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
1 Numerical Hydraulics Open channel flow 1 Wolfgang Kinzelbach with Marc Wolf and Cornel Beffa.
HEC-RAS.
Hydraulic Routing in Rivers
Hydraulic Routing in Rivers
A Tarpanelli 1, T. Moramarco 1, S. Barbetta 1, F. Melone 1, N. Berni 2, C. Pandolfo 2 and R. Morbidelli 3 European Geosciences Union General Assembly 2012.
Solution of the St Venant Equations / Shallow-Water equations of open channel flow Dr Andrew Sleigh School of Civil Engineering University of Leeds, UK.
1D Steady State Hydraulic Modelling Bratton Stream Case Study.
Feb 2003HEC-RAS Version 3.11 Slides adapted from HEC Unsteady Flow Course Unsteady Flow Course.
FLOOD ROUTING.
Channel Routing Simulate the movement of water through a channel
MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.
HR Wallingford Ltd 2002 Overview of the CFMPs and the MDSF Rob Cheetham HR Wallingford LTD.
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
Distributed Flow Routing Surface Water Hydrology, Spring 2005 Reading: 9.1, 9.2, 10.1, 10.2 Venkatesh Merwade, Center for Research in Water Resources.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
1 Overview of Unsteady Flow Modeling With HEC-RAS Gary W. Brunner, P.E.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
Team 10 Presentation Vol. II 18th February 2011 Sophia Antipolis, France Improvement by calibration or with geometry?
Dynamic Channel Routing Preissmann Scheme. Dynamic Channel Routing Preissmann Scheme unconditionally stable for  >=0.5 second-order accurate if 
Mathematical Background
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
ERT 349 SOIL AND WATER ENGINEERING
Hydraulic Routing in Rivers Reference: HEC-RAS Hydraulic Reference Manual, Version 4.1, Chapters 1 and 2 Reading: HEC-RAS Manual pp. 2-1 to 2-12 Applied.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Flood Plain Modelling. Flood Plain Model Options Flood Plain Model Options: 1 - D : 1 - D : - Lump River and Flood Plain as Single branch ( Limitation:
HEC-RAS Version 3.1 Overview
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.
Types of Boundary Conditions 1.Specified head (including constant head) h = f (x,y,z,t) 2.Specified flux (including no flow)  h/  l = -q l /K l 3.Head-dependent.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Modelling of the 2005 flood event in Carlisle and probabilistic flood risk estimation at confluences Jeff Neal 1, Paul Bates 1, Caroline Keef 2, Keith.
From Fread, D.L., Flood routing models and the Manning n.
DEVELOPMENT OF A CELL BASED MODEL FOR STREAM FLOW PREDICTION IN UNGAUGED BASINS USING GIS DATA P B Hunukumbura & S B Weerakoon Department of Civil Engineering,
DIRECT RUNOFF HYDROGRAPH FOR UNGAUGED BASINS USING A CELL BASED MODEL P. B. Hunukumbura & S. B. Weerakoon Department of Civil Engineering, University of.
Team  Spatially distributed deterministic models  Many hydrological phenomena vary spatially and temporally in accordance with the conservation.
What are the problems of managing a river? Socio-economic and environmental needs?
The Need for Speed in Flood Modelling November 13, 2014 Richard Connell Ben Tate Lachlan Inglis Vs.
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
Week 1.
Cristina Nelson, Term Project, CEE 6440, Fall 2007
Change in Flood Risk across Canada under Changing Climate
Hydrological Information System
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Channel Routing Simulate the movement of water through a channel
USING NUMERICAL PREDICTED RAINFALL DATA FOR A DISTRIBUTED HYDROLOGICAL MODEL TO ENHANCE FLOOD FORECAST: A CASE STUDY IN CENTRAL VIETNAM Nguyen Thanh.
Floods and Flood Routing
Preciptation.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
1988 flood in Nîmes (France)
IMPACT ~ Breach Formation (WP2)
Presentation transcript:

River Kelvin Case Study Steady Flow Analysis Theory

1D Steady Flow Modelling Geometrical data River cross-sections + distance between them. x Q h Hydraulic structures

1D Steady Flow Modelling Equation Solution Standard step method. Q 1 2 x Z + y

1D Steady Flow Modelling Boundary Conditions Upstream – constant inflow. Downstream – known water level. Q T Q h h Q T

1D Steady Flow Modelling Prediction Water level at each cross-section. x Q h Advantages Easy to predict maximum water level.

River Kelvin Case Study Steady Flow Analysis Case Study

River Kelvin Case Study The December 1994 Flood Rainfall event with a return period between 1 in 300 and 1 in 1000 years. Flood return periods Lower River Kelvin 1 in 200 years. Main tributaries - Luggie Water and Glazert Water 1 in 50 years. Flood outline 9 to 11th December 1994

River Kelvin Case Study Consequences Catastrophic flood which caused: Damage estimated at £10 million. Extensive damage to over 300 business and residential properties. The loss of two lives. Inundation in Kirkintilloch Flooding of McNair’s Factory Overtopping of flood defences at Balmore

River Kelvin Case Study Solution Options considered: Flood storage – discounted due to timing of flood peaks. Channel dredging – discounted due to environmental damage and increased flood peaks downstream in Glasgow. Solution adopted was a system of direct defences using earth embankments and retaining walls, the location of which was chosen to preserve as much of the existing flood plain as practical.

River Kelvin Case Study Solution Examples of the direct defences used of the River Kelvin flood defence scheme.

River Kelvin Case Study Steady Flow Analysis The Task

River Kelvin Case Study Model Calibration The HEC-RAS model provided has been set up with: Gauged inflows for the River Kelvin and its tributaries for the December 1994 flood, Table 1. A rating curve downstream boundary based on uniform flow. Manning’s ‘n’ values of 0.02 and 0.01 on the flood plain and main channel respectively. Calibrate the model by altering the Manning’s ‘n’ values to obtain a reasonable agreement ± between the observed results provided in Table 2 and the computed values.

River Kelvin Case Study Flood modelling Use the calibrated model to estimate flood levels for the 50, 100 and 200 year flood events, inflow data is provided in Table 3. Determine the maximum defence levels for a flood prevention scheme for Kirkintilloch.

River Kelvin Case Study Reporting The case study report should include: A map showing the location liable to flooding for a return period of 1 in 200 years. Details of required flood defence levels in the location of Kirkintilloch.