New Configuration Public Hearing May 15, 2008 Superintendent Terry E. Shoemaker.

Slides:



Advertisements
Similar presentations
Critical Condition Triaging School Enrollment Growth School Board Work Study November 13, 2013.
Advertisements

February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Comparative Analysis Two Potential Sites for a New High School.
Merger Study Grade Level Configurations Options and Rationale.
 Board of Trustees - Reviewed and prioritized the needs from previous MISD facility assessment and programmatic changes in curricular and extracurricular.
Legislative Committee on Education Capital Funding Needs July 15, 2014.
Oak Creek-Franklin Joint School District. Adequate and appropriate performance venue for school concerts and musical or theater productions Sufficient.
1 Building Use Study Plattsburgh City School District Presentation to the Board January 9, 2014 Castallo and Silky- Education Consultants Bill Silky and.
CMSD Master Planning. KEY POINTS  No schools to close for several years  All funding is tied to enrollment counts  The Master Plan will be reviewed.
Interim Facilities Report Quincy Public School District #172 September 25, 2013.
PROPOSED ADDITION Auditorium/Music & Art Rooms BELMONT HIGH SCHOOL Presented by: Shaker Regional School Board February 8th & 9th, 2006.
Porter Ranch Community School Addition Project
The Context of Education in North Carolina. Today We’ll Look At… Just the numbers (i.e., schools, students, employees) The changing face of our students.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
2011 – 2012 High School Attendance Area Committee.
BOND PROPOSAL August 26, Proposed Bond Projects Two middle schools One school would be located on the west side of Stoddard Road, across from Bear.
Annual Report of Progress The Public Schools of Jersey City Dr. Charles T. Epps, Jr. State District Superintendent of Schools January 4, 2006.
International Charter School Options in the event of closure.
David G. Title August 26,  May, 2006 referendum included renovating 3 elementary schools at a total cost of $30 million  Under the original.
Review the administrative team findings in regard to the recommendation with our two smaller schools at Lincoln Park and West Wyomissing. Review and explain.
K+12 IN PHILIPPINES SY: W HAT IS K The K-12 model is an educational system for basic and secondary education patterned after the United.
Proposed Budget May 21, 2013 Stan Rounds Superintendent of Schools.
This Year in the Meridian Joint School Distict. Student Enrollment increases by ,221 students will attend one of 28 elementary schools – 759 more.
Discussion Points Update on Assessment Phase (J2 & DLR) Enrollment Model (RSP) – Sophisticated Forecast Model – Catchments (Planning Areas) – Components.
LEADERSHIP BILLINGS STATE OF THE DISTRICT JACK COPPS, SUPERINTENDENT Billings Public Schools January 7, 2009.
1. 2 A look at Katy ISD in square miles –three counties –two cities 47,800+ students 6,300+ employees 44 campuses 12 support facilities.
Preliminary Budget Update February 9, 2009.
LOCKPORT CITY SCHOOL DISTRICT Washington Hunt Elementary School Michelle T. Bradley Superintendent of Schools Deborah Coder Assistant Superintendent for.
Building for the Future of Johnston Schools Forum for Public Feedback on September 11, 2012 Bond Referendum Monday, October 29, :00 PM Summit Middle.
GPISD Steering Committee Recommendation We are recommending to the Board of Trustees that the Board call for a $117 million bond election to be placed.
How can overcrowding at Rangeview High School be reduced? Rangeview High School Project Citizen May 12 th 2006.
MIDDLE SCHOOL CONCEPT FOR THE RUTHERFORD SCHOOL DISTRICT.
Development Committee School Usage and Building Recommendations Big Walnut School District Board of Education Meeting June 9, 2008.
Welcome! Forest Lake Area Schools Community Meetings November 4, 2003 Levy Election.
PROPOSED PARTIAL CONSOLIDATION OF COOLIDGE/FLORENCE SCHOOL DISTRICTS Vote November 3 rd Mail In Ballot Only.
UPDATING 5-YEAR/10-YEAR FACILITY PLAN PLANNING FOR SUCCESS.
2015 School Impact Fees April 29, Changes since March o Updated number of square feet per elementary student to 120 sq ft / pupil o Updated the.
May 11, 2015 DEMOGRAPHIC STUDY FOR THE WARREN TOWNSHIP SCHOOLS.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
UPDATING 5-YEAR/10-YEAR FACILITY PLAN PLANNING FOR SUCCESS.
COLLEGE STATION ISD 2015 Bond Information Election Date: November 3, 2015.
Public Budget Hearing May 3, 2007 Proposed Budget $77,516,449.
MAINTAINING EXCELLENCE IN COLUMBIA PUBLIC SCHOOLS.
Parent Action Conference 2015 Leonie Haimson, Class Size Matters November 7, 2015 CRISIS IN SCHOOL OVERCROWDING : WHAT SHOULD BE DONE? INCLUDING CITYWIDE.
Bond Proposal Student Enrollment Bond Accomplishments Voting Information District Achievements.
Proposed Budget and Superintendent’s Message FY Presented to the Board of Education April 14,
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Wahoo Public School District Facility Planning Update April 18, 2016.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Proposed 2013 Bond A Smart Plan For Continued Excellence In The.
Oconee County Schools Five Year Facility Study April 27, 2011.
Windsor C-1 School District Planning 2017
Prior Conversations with Board as We Explore Land Acquisition
Consolidated Central Office Building
UPDATE: 8/8/2011 Batavia City School District
Capital Construction Bond Program
Sinking Fund Millage Proposal
Class Size Capacity Impact BOARD OF EDUCATION WORK SESSION
OSPI Capital Budget School Facilities & Organization
Pillager Public School District Community Survey Results
Understanding Grade Level Reconfiguration
Chimacum District Facility & Program Plan
Chief Tarhe Elementary Board Presentation Tuesday, May 24, 2012
Crisis in school OVERCRowding : what should be done
D15: large classes, overcrowding, and what can be done
Leonie Haimson, Class Size Matters February 29, 2016
Houston K-8 School Enrollment Information Report
Houston K-8 School Enrollment Information Report
Presentation transcript:

New Configuration Public Hearing May 15, 2008 Superintendent Terry E. Shoemaker

Presentation Purposes Why the need for a configuration change? Why the need for a configuration change? What are some proposed solutions? What are some proposed solutions? What are the benefits of the proposed change? What are the benefits of the proposed change? How much will the proposed configuration changes cost? How much will the proposed configuration changes cost? Which building will house grades 7/8 and which building will house grades 5/6? Which building will house grades 7/8 and which building will house grades 5/6? When will the configuration plan be operational? When will the configuration plan be operational?

What is prompting this need for a change in configuration?

Explosive Enrollment Growth Wasatch continues to be one of the fastest growing school districts in the state Wasatch continues to be one of the fastest growing school districts in the state Takes approximately 10 years for a class to grow 100 students Takes approximately 10 years for a class to grow 100 students Our senior class this year has 304 students, our Kindergarten class has 409 students Our senior class this year has 304 students, our Kindergarten class has 409 students We project a 3% enrollment growth each year We project a 3% enrollment growth each year High school enrollment has declined by nearly 50 students since 2001 High school enrollment has declined by nearly 50 students since 2001

Enrollment History

YearEnrollment Growth Growth % Increase % % % % % % % % % % % % % % % % Average912.41%

Enrollment Projections Without a configuration change SchoolCapacityEnrollment Heber Valley Elementary *626*701 Midway Elementary *627*702 J.R. Smith Elementary *603*675 Old Mill Elementary *676*757 Rocky Mountain Middle *783*876 Wasatch Mountain Jr. High *799*895 Wasatch High School920*1003*1123 Wasatch Alternative *3% per year growth rate increase

Three Possible Solutions Move our elementary and middle school to year-round productivity models. Move our elementary and middle school to year-round productivity models. Bond to replace the Junior High School and build a new elementary school Bond to replace the Junior High School and build a new elementary school Change the configuration and move students where we have additional capacity Change the configuration and move students where we have additional capacity

Year-Round Schools 4 Track Year-round schedule for elementary and possibly the middle school 4 Track Year-round schedule for elementary and possibly the middle school Would need to begin such model for Midway, J.R. Smith, and Heber Valley in the school year Would need to begin such model for Midway, J.R. Smith, and Heber Valley in the school year Rocky Mountain Middle would have to move to year-round schedule around school year Rocky Mountain Middle would have to move to year-round schedule around school year

Bond for a New Elementary School Old Mill Elementary cost $8 million to build; land costs were donated, but the school district built the roads and infrastructure; around $105 per square foot Old Mill Elementary cost $8 million to build; land costs were donated, but the school district built the roads and infrastructure; around $105 per square foot Today, the same structure would cost around $13,000,000 at up to $200 per square foot, plus at least $2 million for ground Today, the same structure would cost around $13,000,000 at up to $200 per square foot, plus at least $2 million for ground Two years from now: estimated $14+ million for the structure and over $2.5+ million for the ground Two years from now: estimated $14+ million for the structure and over $2.5+ million for the ground Total costs for a new elementary school + ground and infrastructure could approach $18 million Total costs for a new elementary school + ground and infrastructure could approach $18 million

Bond for a replacement Jr. High A New Jr. High today (150,000 square feet) will cost $30 million at up to $200 per square foot A New Jr. High today (150,000 square feet) will cost $30 million at up to $200 per square foot Two years from now the same structure could cost $36 million + infrastructure costs Two years from now the same structure could cost $36 million + infrastructure costs

Costs of the Bonds Up to $18 million for the new elementary Up to $18 million for the new elementary Up to $31-36 million for the replacement Jr. High Up to $31-36 million for the replacement Jr. High Costs could approach $49-54 million to complete these two projects Costs could approach $49-54 million to complete these two projects Debt service required of the public approaches what was needed for the new high school Debt service required of the public approaches what was needed for the new high school

Proposed New Configuration K-4 Elementary schools K-4 Elementary schools Grades 5&6 Intermediate Elementary School Grades 5&6 Intermediate Elementary School Grades 7&8 Junior High School Grades 7&8 Junior High School Grades 9-12 High School Grades 9-12 High School

Shifting the School Population Rocky Mountain Middle currently has 36 teaching areas Rocky Mountain Middle currently has 36 teaching areas Wasatch Mountain Jr. has 39 teaching areas Wasatch Mountain Jr. has 39 teaching areas The new Wasatch High School has 75 teaching areas The new Wasatch High School has 75 teaching areas There is classroom capacity available for use in all three of these schools There is classroom capacity available for use in all three of these schools

Classroom Expansion We have 9 double portable classrooms We have 9 double portable classrooms Rocky Mountain Middle and the new high school were designed to be expanded Rocky Mountain Middle and the new high school were designed to be expanded

Configuration Change Enrollment Projections Heber Valley Elementary (K-4)574*481*568*653 Midway (K-4)575*501*591*680 J.R. Smith (K-4)553*461*544*626 Old Mill (K-4)620*526*621*714 Intermediate (Gr. 5,6)718*749*883*1015 Jr. High (Gr. 7,8)733*765*903*1038 Wasatch High School (Gr. 9-12)920*1322*1560*1794 *3% growth rate per year

What Supports the Configuration Change? Explosive enrollment growth Explosive enrollment growth Accelerating commercial construction costs Accelerating commercial construction costs Bond raters are concerned with our mounting debt Bond raters are concerned with our mounting debt Pay off most of our existing debt Pay off most of our existing debt Maximizes the use of existing classroom space Maximizes the use of existing classroom space

Curriculum needs match better with a 5/6 school vs. 6/7 school Curriculum needs match better with a 5/6 school vs. 6/7 school Curriculum and activity needs match better with a 7/8 school vs. 8/9 school Curriculum and activity needs match better with a 7/8 school vs. 8/9 school More efficient use of personnel resources More efficient use of personnel resources Allows greater opportunity for performing arts programs to be initiated and sustained Allows greater opportunity for performing arts programs to be initiated and sustained

Which building will house grades 5/6 and which building will house grades 7/8?

Further study is still needed to make the determination about which building will best fit the needs of either grades 5/6 or 7/8. That decision will be made before January 1, 2009.

Costs to change the configuration Finish the four classrooms, little theater, and auxiliary gym at the new high school (around $750,000.) Finish the four classrooms, little theater, and auxiliary gym at the new high school (around $750,000.) Brighten and repair the hallways in the current Jr. High. (around $67,500.) Brighten and repair the hallways in the current Jr. High. (around $67,500.) Add playground space and equipment (around $130,000) for elementary age students Add playground space and equipment (around $130,000) for elementary age students Transportation costs: Minimal if 5/6 is on secondary schedule; around $200,000 for additional bus drivers if 5/6 is on elementary schedule Transportation costs: Minimal if 5/6 is on secondary schedule; around $200,000 for additional bus drivers if 5/6 is on elementary schedule

When will the configuration change be implemented? The configuration change would become operational in the school year. This is the same year that the new high school is slated to open.

Thank you for your attendance. We appreciate your interest in what we are trying to accomplish.