6. September 2004 Technological Implementation Plan (TIP)

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Technological Implementation Plan – D12.
Advertisements

Institut für Meteorologie und Klimatologie Dipl.-Met. Tahera ALI October 2003 FINAL REPORT.
Guide for Proposers Research Infrastructures Integrated Infrastructure Initiative - I3 Bernhard FABIANEK European Commission,
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
SMEs in the. SMEs in FP7 - why? SMEs are at the core of European industry and key players in the innovation system. SMEs have to respond increasingly.
The IST Programme Information Society Technologies Programme (IST ) 1 FP5: IST Programme Information Society Technologies IST Programme How it works Jacques.
DG Research and Innovation
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
Project FP7-PEOPLE-IRSES: ASK no
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7 6 - Resource Allocation and Budgeting.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
AIDA Governing Board meeting 11 Dec 2014 Final Project Reporting 1 AIDA Governing Board meeting, 11 Dec 2014.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
Creating Policies and Procedures that Build Performance Michigan Association of Conservation Districts © Copyright 2011, NorthSky Nonprofit Network All.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Lecture 2: Project Concept Document
Paul Mundy Concept notes A brief summary of your project idea.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
Legal & Financial Issues
1 Framework Programme 7 Guide for Applicants
WP5 - Mapping Indian Research Potential Sourabha Rani, ITSMA, INDIA Activities for Year 5 & 6.
Project Closure Guidelines Riga, Legal framework 2 EC Regulation 1828/2006 § 8, 9: Explanatory plaque, billboard, emblem of the EU, reference to.
IMI2 Rules and Procedures 16 September Warsaw Magali Poinot, Legal Manager.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
CARPE DIEM 3 rd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
COMPETITIVE AND SUSTAINABLE GROWTH Research DG European Commission Expressions of interest / Dedicated call mechanism.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Volvox The EC Contract Angela Pettit – Contracts Officer.
36-month meeting Nov 24 – Cape Town SIK – IMBC – IFR – CSIR – UP – UEM – UOM ENVIROPAK Project administration Annual and final report, TIP, cost.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
Information session first joint ERANID call Department of Health Eligibility Guidance for UK Researchers Policy Research Programme, Department of Health,
European Commission 1 Quick Guide to the eTIP V1.3.
Dissemination of SBS data and technical visits to MSs item 10 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg.
Operational Guidance Operational Bulletin End presentation.
2016 Annual Event ‘’H2020 NCPs Training’’ Minsk, March 2016 Project Management and Implementation IncoNet EaP is a project funded under the 7th European.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Industrial & ACC participation in NMP Stage IPs DG RTD/G-1/IA NCP Meeting - Ad Hoc group’s results Slide 1 Results of the AD HOC Group.
EuCARD-2 4th Annual Meeting Preparation Final Reporting
WP3 - Evaluation and proposal selection
Economic Outcomes Programme Local Authority Briefing Summer 2016
4th. Plenary Meeting, Edinburgh, May 2010
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
CRE8TIVE KO Meeting, Rome Italy Quality Assurance
Quick Guide to the eTIP V1.3.
Guidelines and Template for project oral presentation
Micro data linking – call for proposal item 12 of the agenda
INTELLECTUAL PROPERTY RIGHTS (IPR) IN FP7
Communication and Dissemination Obligations, Guidelines, Best Practice
Project Title: Host Institution: <Name of Host Institution> PI:
AME Programmatic Letter-of-Intent
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

6. September 2004 Technological Implementation Plan (TIP)

6.9.04EuroPa Plenary Meeting Paris2 What it is a deliverable requested by the EC at the end of the project an official statement of the results achieved by the partners a statistical document for the EC to report the success of its programs a means of communication of the project achievements (the public part of the TIP)

6.9.04EuroPa Plenary Meeting Paris3 What it contains: Project summary (original research objectives, expected deliverables, project's actual outcome, dissemination and use intentions for the expected outputs) List of partners Quantified data (e.g. number of new products, services, methods, scientific breakthroughs, EU regulations etc.) European interest achieved by the project Expected project impact (e.g. improved scientific and technological quality, improved education, employment etc.) Results overview (description, type, owners)

6.9.04EuroPa Plenary Meeting Paris4 Type of results 'Type A' results are widely available for use by others outside the project consortium (full information for publication must be provided) 'Type B' results are used exclusively by the project partners so no-one else can use them. 'Type C' results are only used where a project has failed to achieve anything, or perhaps was never intended to produce exploitable results as it had some other special purpose.

6.9.04EuroPa Plenary Meeting Paris5 Results Title and category Partners who own the results To be completed by the designated partner: Contact person Summary Subject descriptors (5 characteristic subjects out of a list) Documents Intellectual Property Rights (patents etc.) Application Sector Current stage of development Quantified data about the result (e.g. number of publications) Further collaboration, dissemination and use of the result

6.9.04EuroPa Plenary Meeting Paris6 Personal exploitation plan Confidential section to be completed by each partner with respect to the results he owns Contains: Title and brief description of result Timetable of the use and dissemination activities within the next 3 years after the end of the project Foreseen collaborations with other entities Quantified data about the result

6.9.04EuroPa Plenary Meeting Paris7 How and When? to be submitted online via a web interface (eTIP) at no later than 2 months after the end of the project funding period