WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
ECFA LC2013 ECFA LC13 SRF Technology Summary Wolf-Dietrich Möller Rongli Geng Hitoshi Hayano ECFA LC13 SRF Technology Summary Hamburg, Mai 31 st 2013.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
ILC-BAW1 Interim Summary and Further Plan Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 9, ,
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ILC-BAW1 Summary and Recommendations Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 10, ,
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
WG3 : Superconducting Linac Session H. Hayano, C. Pagani Geneva,Oct.2010 summary.
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
SCRF Monthly WebEx Meeting Agenda 1.Report from PMs 2.Report from Group Leaders 3.Topics 1.Cavity Gradient and Yield re-evaluation 2.Update of.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
S1G Experiment Schedule Plan
SCRF Monthly WebEx Meeting May 6, 2010
ILC10 Beijing Global Design Effort
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
ERL2015 WG4: RF & superconducting RF for ERL
TTC meeting, Milano Global Design Effort
Presentation transcript:

WG3: Main Linac H. Hayano, C. Nantista, C. Pagani

Main Linac session (blue part) : Time chart

March 27, Saturday Tunnel Layout (Joint with CFS) HLRF (Joint with CFS) Main Linac Integration (Joint with Beam Dynamics) CFS Tunnel StatusT. Lackowski Klystron Cluster EquipmentC. Nantista DRFS EquipmentS. Fukuda General Installation EquipmentI. Ruehl DRFS DevelopmentShigeki Fukuda Power supply for DRFSMitsuo Akemoto LLRF consideration for DRFSShinichiro Michizono KCS DevelopmentChris Natista HOM's and Gradient SpreadChris Adolphsen discussion w/ CFS(V. Kuchler) Flash overviewNicholas Walker Analysis of FLASH Beam on Gradient Stability DataShilun Pei 9mA FLASH Workshop SummaryShinichiro Michizono Update of RTML, FNAL BPM and Split SC QuadNikolay Solyak Split SC QuadNikolay Solyak Lorents Force Detuning Studies at STFYasuchika Yamamoto Linac Beam Dynamics UpdateKiyoshi Kubo ( DRFS, Klystron cluster ) ( Flash, others )

March 28, Sunday Cavity Cavity Integration Summary of understanding of quench limit in 9-cell cavities using T- mapping and optical inspection Yasuchika Yamamoto, Sebastian Aderhold Latest 9-cell cavity testing results from FNALJoe Ozelis Recent cavity test results from KEKEiji Kako New results on field emission suppressionRongli Geng Comparison EP procesing parameters at KEK and JLABTakayuki Saeki IHEP high gradient efforts on 1.3 GHz 9-cell cavity for ILCJie Gao Efforts on the R&D of SRF cavity at Peking UniversityKe-Xin Liu Replica-method and local grinding repairKen watanabe Review of plans for upcoming cavity processing and testingCamille Ginsburg Review on ACD topics (new shape, large-grain cavity,vertical EP etc)Zack Convey, Fumio Furuta Update on global cavity database and yield evaluationYasuchika Yamamoto, Camille Ginsburg Status report of DESY activitiesEckhard Elsen discussion Operational Gradient re-evaluation discussions ILC Gradient R&D status and challengesRongli Geng Gradient strategy proposalA. Yamamoto discussion Test facility status, tuner&coupler plug-compatibility discussions Status of NMLBob Kephart Status of STFHitoshi Hayano R&D status in INFN Pisa Carmine Elvezio Pagliarone discussion Plug-compatibility documentH. Hayano Joint with BDS for 10Hz operation (HLRF, Cryo people) ( Operational gradient re-evalution, Test facilities)

March 29, Monday Cryomodule, Cryogenics Industrialization S1-G Cryomodule assembly statusNorihito Ohuchi S1-G Cavity assembly statusEiji Kako S1-G RF preparationShigeki Fukuda Proposal of experiment schedule of S1-G cryomodule Hitoshi Hayano Cavity test planEiji Kako RF test planShinichiro Michizono Cryomodule thermal test planNorihito Ohuchi Preparation of Industrialization, R&D plan FNAL industrialization study statusBob Kephart India industrialization study statusShekhar Mishra KEK industrialization study statusH. Hayano Status of XFEL module assembly facility at Saclay Olivier Napoly For IPAC indutrialization sessionJim Kerby ( S1-Global experiment )

2 nd floor, room 202: Main Linac session