Suffolk BC forum Willis BC/DR Experience 6 th December, 2013.

Slides:



Advertisements
Similar presentations
True Business-Class Remote Online Backup 44% Of All Computer Users Have Reported At Least One Permanent Data Loss Your Business Data IS Your Business –
Advertisements

Jump to first page Business Continuity Planning The evolution of Disaster Recovery Planning.
Business Continuity Training & Awareness by Sulia Toutai (ANZ)
Business Continuity and Disaster Recovery Planning.
Case Study: Business Continuity Planning for Site- Level Disaster Kimberley A. Pyles Northrop Grumman Corporation
The Arab Academy for Banking & Finance Science Faculty of Information System & Technology Department Of Management Information Systems The Disaster Recovery.
Maximizing Uptime and Your Firm's Bottom Line: Understanding risk and budget when evaluating business continuity & disaster recovery protocols Michael.
DTCC Green DTCC’s Response to Super Storm Sandy Cecilia Humphrey Americas’ Representative, DTCC ACSDA General Assembly, April 2013 Antigua, Guatemala Special.
© Castle Care-Tech Euro MERiDIAN Automatic Remote Maintenance Software ARM ® The flexible, automated solution to your security servicing needs.
1 Business Continuity: The sixth international payment system conference MNB, Budapest 14 November, 2007.
Disaster Recovery in IT David Irakiza CSC 585-High Availability and Performance Computing 2012.
1 |© 2006 Citrix Systems, Inc.—All rights reserved. CoxCONNECT Case Study: Universal Access supported by a fully redundant infrastructure spanning multiple.
Business Continuity and DR, A Practical Implementation Mich Talebzadeh, Consultant, Deutsche Bank
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Disaster Prevention and Recovery Presented By: Sean Snodgrass and Theodore Smith.
1 Outsourcing and Offshoring Sandra Senti University of Chicago May 5, 2005.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
ISDA International Swaps and Derivatives Association, Inc. Overview of ISDA Activities Sao Paulo, Brazil August 6, 2002 Ruth Ainslie Senior Policy Director.
Banking Clouds V International Youth Banking Forum.
Auroras Now! Kirsti Kauristie 1), Anssi Mälkki 1), Anneli Ketola 1), Heikki Nevanlinna 1), Tero Raita 2), and Alberto Blanco 1) 1)Finnish Meteorological.
Embracing IP Multimedia Services for Strategic Business Advantage Rick Seeto VP & GM Enterprise Networks, Asia Pacific.
Business Continuity & Disaster Recovery Daniel Griggs Solutions Architect Ohio Valley September 30, 2008.
Care Home Forum 19 th May 2015 Sarah Chittock – Merton Civil Contingencies Officer Taryn Milton – Emergency Planning Manager – Epsom St. Helier.
Security+ All-In-One Edition Chapter 16 – Disaster Recovery and Business Continuity Brian E. Brzezicki.
SITA Presentation to Portfolio Committee on Police on SITA Services Provided to SAPS - FY2010/ October 2011 By: Acting Chairperson of Board Ms Fébé.
Business Continuity and Disaster Recovery Chapter 8 Part 2 Pages 914 to 945.
New Facilities & Disaster Recovery Solutions 0 February 20, 2007 Agency IT Resources Communications Exchange Meeting Facilities and Disaster Recovery Solutions.
GENERAL BANK MANAGEMENT Technology Management
A Case Study The Next Step Business Continuity Workshop For major Medical Center.
Presentation by Paul Vine In partnership with Version Sabre and Business Continuity Planning.
Whiteboard Development Develop whiteboard visually in this slide. Use PowerPoint drawing tools and assets copy/paste from previous slide. Duplicate as.
Philip Young One Hosting Capita One Software Update Seminars 2014.
Service Overview CA- IROD- Instant Recovery on Demand CRITICAL SERVER CONTINUITY, NON-STOP OPERATIONS, TOTAL DATA PROTECTION Turnkey solution that provides.
Co-location Sites for Business Continuity and Disaster Recovery Peter Lesser (212) Peter Lesser (212) Kraft.
FlashSystem family 2014 © 2014 IBM Corporation IBM® FlashSystem™ V840 Product Overview.
 Cloud computing is the use of computing resources (hardware and software) that are delivered as a service over a network (typically the Internet). 
Update on e-Placement at Aon Ian Summers. Aon Limited is authorised and regulated by the Financial Services Authority in respect of insurance mediation.
Campus Safety Update September Area’s of Focus – Fall 2008 Implementation of Multi-Modal Personal Mass Notification Recruitment of Emergency & Security.
Financial Services Authority New Rules for Trading Companies.
Brief Overview: Options for Licence & Support Open Source Job Scheduler Software- und Organisations-Service GmbH 
2012 Infotec Conference Leveraging the Cloud to Increase Availability and Improve Resilience Presenter Kevin Swagerty Executive Director of IT Service.
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
A Lightweight Business Continuity & Disaster Recovery Plan Motahareh Moravej Issuers’ Affairs Director at CSDI PHD. Student of Computer Engineering, UT.
Business Continuity Awareness Steve Lambert Biscon Planning Ltd.
Environmental Liability: Stuck in the Middle Presented by Justin Perry, Vice President and National Practice Leader Aon Risk Solutions, Environmental Services.
Copyright © 2007 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture. October 24 th, 2007 CORE.
OFFICE 365 APP BUILDER PROFILE: Druva
Business Continuity and Disaster Recovery
Healix Risk Rating A Verisk Analytics Business
SUNGARD AVAILABILITY SERVICES
Uptime All The Time: Doing Business In The Cloud
How to prepare for the End of License of Windows Server 2012/R2
What Do We Do? Managed IT services
Disaster Recovery Services
GENERAL BANK MANAGEMENT Technology Management
Agency IT Resources Communications Exchange Meeting
Business Contingency Planning
Dennis Reid Senior Consultant Elliot Consulting, LLC
SUNGARD AVAILABILITY SERVICES
Cloud Consulting Services and Solutions
Note to Oracle Sales Teams
SOUTH AFRICAN INSURANCE ASSOCIATION
Kovaion Consulting IT Services Portfolio Date : Apr-2015
Using the Cloud for Backup, Archiving & Disaster Recovery
University of Maryland Robert H. Smith School of Business
©2002 Prebon Energy, All Rights Reserved
Distributed Systems and Concurrency: Distributed Systems
Authority on Demand Control Authority Rights & Emergency Access
Presentation transcript:

Suffolk BC forum Willis BC/DR Experience 6 th December, 2013

1 Risk Appetite - BC Need to set own risk appetite to give clear indication on scope eg :  We plan for the loss of Ipswich office  We plan for the loss of London office  We don’t plan for the loss of both at the same time  Mumbai operation have gone from single office to : ‒ three offices in different parts of the city ‒ contracted third party recovery site ‒ improved home working capability  We don’t plan for the long term loss of all three office and recovery site at the same time

2 Risk Appetite – IT DR Critical IT systems centralised  Operational efficiencies – maintenance, support, upgrades etc  Data resilience – infrastructure, management, etc  Recovery – backup systems, data replication etc. Recovery plans  Applications have published recovery objectives  Three tier approach for recovery – High/Med/Low  increasingly seen as needing faster recovery given global nature of our business

3 Willis BC/DR experience Have well developed and tested BC/DR plans for major global offices Contracted or designated recovery sites for all offices Major offices have annual recovery site exercises Automated messaging system (SMS, voice, ) with annual testing Annual IT DR recovery site exercise Large scale remote working capability  Sized for 2000 concurrent remote users  Largest test (for London Olympics) 1009 concurrent remote users  Daily average in UK  Over 500 concurrent users on Mon 28 Oct for storm – had sent emergency message out on Sunday night to all UK Associates.

4 Willis BC/DR experience Requirement to update BIAs to reaffirm our recovery plans/capability Previous BIAs indicated hrs recovery – no financial trading systems like banks or call centres for High St insurance companies BIAs confirmed recovery sizing  No. of seats at recovery site  Remote working capacity  Reaffirmed overall recovery period  BIAs confirmed desire for faster recovery Fitted with other IT projects for data centre and upgrades  Fully fault tolerant – no SPoF systems, infrastructure, building/ environment  Resilient - system capacity, fail over, hot swap etc  Data replication to provide full recovery within hours.

We are looking to avoid this……

Business Continuity in Action?