1 “Lessons Learned - Construction of the National Enrichment Facility” Stephen Cowne Director, Quality & Regulatory Affairs Louisiana Energy Services (LES)

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
HEAT TRACING SPECIALIST
© 2013 Cairn India Limited MEASURES TO BE TAKEN AT DESIGN STAGE FOR IMPROVING QUALITY GATED PROCESS Anirban Ghosh Senior Manager- Quality Assurance CAIRN.
Slide 1 HEADQUARTERS: 1108 Ohio River Boulevard, Suite 805 Sewickley, PA , USA (412) Chicago Office: 2135 CityGate Lane, Suite 300 Naperville,
Enrichment Processes. Nuclear Fuel Cycle Diagram * Figure from The Nuclear Fuel of Pressurized Water Reactors and Fast Reactors, ed. H. Bailly, D. Menessier,
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Brief History of Nuclear Regulation 1946 Atomic Energy Commission (AEC) by Congress. Strict control of nuclear materials used or produced in a reactor.
1 Anatomy of a Successful LNG Project Gastech 2008 Original Conceptual Photo of EG LNG Train 1.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
BEHAVIORIAL SAFETY STORY Why we must change the way we implement our programs?
1 Material Control and Accounting (MC&A) Licensing and Planned Rulemaking Activities at NRC Tom Pham – NRC NMMSS Users Annual Training Meeting Denver,
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
New Reactor Construction Inspection
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
U.S. Department of the Interior U.S. Geological Survey Continuous Records Processing.
Slide 1 HEADQUARTERS: 1108 Ohio River Boulevard, Suite 805 Sewickley, PA , USA (412) Chicago Office: 2135 CityGate Lane, Suite 300 Naperville,
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
JORDAN ATOMIC ENERGY COMMISSION (JAEC) Building of National Safeguards Capabilities in Jordan IAEA’s Technical Meeting/Workshop on National Infrastructure.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Evaluating Configuration Management
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
11th Turkish Accountancy Forum June 2016 Stephen Heathcote Executive Director - Markets.
International Safety Rating System
General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department 1WASHINGTON DC, USTDA , September.
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Lessons Learned in Vendor Oversight
János Krutzler Hungarian Atomic Energy Authority
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Learning Opportunity Reviews
Plant Vogtle Units 3 and 4 Alex Thirkell.
Vogtle 3&4 Configuration Management
Safety Assessment Efficiency Group 2 - Exercise 1
Legal and Regulatory Framework for Nuclear Installations in IRAN
Anna Bradford, Deputy Director Division of New Reactor Licensing
Partners In Excellence
Karen Fili, UUSA President & CEO
Presentation transcript:

1 “Lessons Learned - Construction of the National Enrichment Facility” Stephen Cowne Director, Quality & Regulatory Affairs Louisiana Energy Services (LES) Knoxville, August 26, 2009

2 Bio – Stephen Cowne With LES for 2 ½ years – Responsible for QA/QC, Licensing and Performance Improvement With United States Enrichment Corporation (USEC) for 10 years at Paducah Gaseous Diffusion Plant Worked 12 years with Constellation Energy (commercial nuclear power) in engineering, QA, licensing and project management Former nuclear naval officer with engineering degrees from Virginia Tech and George Washington University

3 Who Is LES? Louisiana Energy Services LLP (LES) formed in 1990 The name LES is memorialized in the Treaty of Washington LES is 100% owned subsidiary of Urenco Limited

4 Americanization of European Technology Proven to be the world’s most advanced, energy efficient, and cost effective technology for enriching uranium Successfully operated in Europe for over 30 years Technology implemented in three enrichment plants in Europe

5 National Enrichment Facility near Eunice, New Mexico “Energy Independence for America”

6 Construction Operating License Received in June of 2006 Received first COL in the United States Chose “greenfield” site near Eunice, NM Built from scratch: organization, programs and procedures to function under a COL Housing and resource challenges

7 Aerial View of National Enrichment Facility Safety and quality are our overriding priorities More than 5.6 million construction man-hours worked without a single lost time accident Construction rework rate at per 10,000 man-hours Site self ID rate is greater than 80% for all groups

8 Key Lessons Learned COL - constructing under an operating license – real time evaluation between drawings and as-builts Any deviations from the design require a prompt “operability” assessment against your design basis Be clear in license what applies during construction vs. operations First NQA1 concrete placement at the National Enrichment Facility

9 Key Lessons Learned (continued) Management programs and procedures in place before you start designing Design oversight and reviews at various stages of completion Understand your engineering specs Design complete before start of construction

10 Key Lessons Learned (continued) Planning, planning & planning to keep construction on critical path Perform constructability reviews Heavy “owner” observation in the field – keep expensive mistakes from happening

11 Key Lessons Learned (continued) Emphasize safety and quality over schedule and cost Recognize the need for a strong nuclear culture in the work force Establish and enforce clear and consistent site standards for verbatim compliance

12 Key Lessons Learned (continued) Procurement requires commercial grade dedication for most NQA-1 equipment Qualify offsite vendors early Don’t under estimate QA/QC staff size Use work plans for all levels of quality Involve the end user in oversight

13 Key Lessons Learned (continued) One CR program for all contractors and departments for the entire site One NCR program for all contractors and departments for the entire site Ensure actions are tracked and closed properly before turnover

14 Key Lessons Learned (continued) Procedures must be detailed enough for all workers Get as many “silverbacks/graybeards” as possible Implement your change process immediately and train staff (70.72/USQ/50.59)

15 Next Steps for the Project Began centrifuge testing with UF6 in March Start installation of centrifuges in August Plant testing and commissioning followed by NRC ORR Ready for operations late this year

16 Conclusions The COL process has clear advantages, but constructing under a COL brings new and complex challenges Key lessons learned to successfully constructing under a COL revolve around –Completeness and flexibility of design –Presence of a strong nuclear culture –Planning, planning & planning to keep construction on critical path –Extensive owner involvement in the field –Must have a technically competent, talented QA/QC organization that is very involved in construction activities –Have your programs and procedures in place before starting