CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001

Slides:



Advertisements
Similar presentations
International Grid Communities Dr. Carl Kesselman Information Sciences Institute University of Southern California.
Advertisements

University of Illinois at Chicago Annual Update Thomas A. DeFanti Principal Investigator, STAR TAP Director, Electronic Visualization Laboratory.
Enabling Grids for E-science and industry in Europe Fabrizio Gagliardi EGEE Proposal Coordinator
EU DataGrid progress Fabrizio Gagliardi EDG Project Leader
An open source approach for grids Bob Jones CERN EU DataGrid Project Deputy Project Leader EU EGEE Designated Technical Director
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Research Infrastructures for e-Science
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
GridPP Presentation to PPARC e-Science Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
From CESSDA to European Research Infrastructure Developments in cross-European data sharing.
SWITCH Visit to NeSC Malcolm Atkinson Director 5 th October 2004.
05/07/00LHCb Computing Model Meeting (CERN) LHCb(UK) Computing Status Glenn Patrick Prototype (Tier 1) UK national computing centre Bid to Joint.
Jürgen Knobloch Grid Computing for LHC Jürgen Knobloch.
INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
CERN Krakow 2001 F. Gagliardi - CERN/IT 1 RTD efforts in Europe by Kyriakos Baxevanidis Foster cohesion, interoperability, cross- fertilization of knowledge,
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
Welcome to CERN Research Technology Training Collaborating.
1 Developing Countries Access to Scientific Knowledge Ian Willers CERN, Switzerland.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
European Life Sciences Infrastructure for Biological Information ELIXIR
Resources and Financial Plan Sue Foffano WLCG Resource Manager C-RRB Meeting, 12 th October 2010.
CERN TERENA Lisbon The Grid Project Fabrizio Gagliardi CERN Information Technology Division May, 2000
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
13-May-03D.P.Kelsey, WP8 CA and VO organistion1 CA’s and Experiment (VO) Organisation WP8 Meeting EDG Barcelona, 13 May 2003 David Kelsey CCLRC/RAL, UK.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
User views from outside of Western Europe MarkoBonac, Arnes, Slovenia.
Rackspace Analyst Event Tim Bell
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
Data Grid projects in HENP R. Pordes, Fermilab Many HENP projects are working on the infrastructure for global distributed simulated data production, data.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
GriPhyN EAC Meeting (Jan. 7, 2002)Carl Kesselman1 University of Southern California GriPhyN External Advisory Committee Meeting Gainesville,
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
The European DataGrid Project Fabrizio Gagliardi EU DataGrid Project Leader CERN
…building the next IT revolution From Web to Grid…
The LHC Computing Grid – February 2008 The Challenges of LHC Computing Dr Ian Bird LCG Project Leader 6 th October 2009 Telecom 2009 Youth Forum.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
Last update: 08/12/ :00 DataGrid Overview & Status CNAP Meeting 13th October 2000 R.P.Middleton (DataGrid UK Manager)
119 May 2003HEPiX/HEPNT National Institute for Nuclear Physics and High Energy Physics Coordinates all (experimental) subatomic physics research in The.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
1CHEP2000 February 2000F. Gagliardi EU HEP GRID Project Fabrizio Gagliardi
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
CERN The GridSTART EU accompany measure Fabrizio Gagliardi CERN
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
The Mission of CERN  Push back  Push back the frontiers of knowledge E.g. the secrets of the Big Bang …what was the matter like within the first moments.
25-September-2005 Manjit Dosanjh Welcome to CERN International Workshop on African Research & Education Networking September ITU, UNU and CERN.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
10-Feb-00 CERN HepCCC Grid Initiative ATLAS meeting – 16 February 2000 Les Robertson CERN/IT.
Bob Jones EGEE Technical Director
General Project Manager
Grid related projects CERN openlab LCG EDG F.Fluckiger
Russian Regional Center for LHC Data Analysis
From the WEB to the GRID Industrial potential of the technology Fabrizio GAGLIARDI CERN Geneva-Switzerland EU-DataGrid Project Leader October 2001.
The CERN openlab and the European DataGrid Project
Gridifying the LHCb Monte Carlo production system
LHC Computing Grid Project
LHCb thinking on Regional Centres and Related activities (GRIDs)
LHC Computing Grid Project
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 2 The LHC Detectors CMS ATLAS LHCb ~6-8 PetaBytes / year ~10 8 events/year

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 3 Funding Requirements growing faster than Moores law Requirements growing faster than Moores law CERNs overall budget is fixed CERNs overall budget is fixed R&D testbed Physics WAN Systems administration Mass Storage disks processors Estimated cost of facility at CERN ~ 30% of offline requirements* Budget level in 2000 for all physics data handling *assumes physics in July 2005, rapid ramp-up of luminosity

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 4 CMS:1800 physicists 150 institutes 32 countries World Wide Collaboration distributed computing & storage capacity

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 5 LHC Computing Model CERN Tier2 Lab a Uni a Lab c Uni n Lab m Lab b Uni b Uni y Uni x Physics Department Desktop Tier 1 USA FermiLab UK France Italy NL Germany USA Brookhaven ……….

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 6 The Data Grid Project Project supported by the EU Fifth Framework programme Project supported by the EU Fifth Framework programme Principal goal: collaborate with and complement other European and US projects Principal goal: collaborate with and complement other European and US projects Project objectives: Project objectives: Middleware for fabric & Grid management Large scale testbed Production quality demonstrations Three year phased developments & demos Three year phased developments & demos Open source and communication – Open source and communication – Global GRID Forum Industry and Research Forum

The DataGrid Project More info on

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 8 Participants Main partners: CERN, INFN(I), CNRS(F), PPARC(UK), NIKHEF(NL), ESA-Earth Observation Main partners: CERN, INFN(I), CNRS(F), PPARC(UK), NIKHEF(NL), ESA-Earth Observation Other sciences: KNMI(NL), Biology, Medicine Other sciences: KNMI(NL), Biology, Medicine Industrial participation: CS SI/F, DataMat/I, IBM/UK Industrial participation: CS SI/F, DataMat/I, IBM/UK Associated partners: Czech Republic, Finland, Germany, Hungary, Spain, Sweden (mostly computer scientists) Associated partners: Czech Republic, Finland, Germany, Hungary, Spain, Sweden (mostly computer scientists) Industry and Research Project Forum with representatives from: Industry and Research Project Forum with representatives from: Denmark, Greece, Israel, Japan, Norway, Poland, Portugal, Russia, Switzerland Collaboration with US similar GRID initiatives Collaboration with US similar GRID initiatives

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 9 Programme of work Middleware Grid Workload Management (F. Prelz/INFN) Grid Workload Management (F. Prelz/INFN) Grid Data Management (B. Segal/CERN) Grid Data Management (B. Segal/CERN) Grid Monitoring services (R. Middleton/RAL) Grid Monitoring services (R. Middleton/RAL) Fabric Management (O. Barring/CERN) Fabric Management (O. Barring/CERN) Mass Storage Management (J. Gordon/RAL) Mass Storage Management (J. Gordon/RAL)Testbed Testbed Integration (F. Etienne/CNRS) Testbed Integration (F. Etienne/CNRS) Network Services (P. Primet/CNRS) Network Services (P. Primet/CNRS) Scientific Applications HEP Applications (F. Carminati/CERN) HEP Applications (F. Carminati/CERN) Earth Observation Applications(L. Fusco/ESA-ESRIN) Earth Observation Applications(L. Fusco/ESA-ESRIN) Biology Applications (C. Michau/CNRS) Biology Applications (C. Michau/CNRS)

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 10 Programme of work Dissemination Dissemination (M. Lancia/CNR) Dissemination (M. Lancia/CNR) Management and administration General Project Management(F. Gagliardi/CERN) General Project Management(F. Gagliardi/CERN)

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 11 Status of the project Contract signed on December 29 th, 2000 Contract signed on December 29 th, 2000 Funding: 9.8 M Euros over 3 years (mostly FTEs) Funding: 9.8 M Euros over 3 years (mostly FTEs) Project started on 1/1/2001 Project started on 1/1/2001 International test bed infrastructure being deployed International test bed infrastructure being deployed Architecture Task Force defined a first Architecture document. Presented and discussed in Amsterdam. Architecture Task Force defined a first Architecture document. Presented and discussed in Amsterdam. Project Technical Board discussed on April 19 th on a delivery plan against the Architecture Project Technical Board discussed on April 19 th on a delivery plan against the Architecture First (internal milestone) at PM9 First (internal milestone) at PM9

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 12 Other European Grid Projects EuroGrid: uniform access to HPC centres, portals for industrial applications EuroGrid: uniform access to HPC centres, portals for industrial applications DAMIEN: tools for Metacomputing DAMIEN: tools for Metacomputing EU IST CPA9 call for Grid projects being evaluated now EU IST CPA9 call for Grid projects being evaluated now Synergy expected and encouraged by funding agencies among EU supported Grid projects Synergy expected and encouraged by funding agencies among EU supported Grid projects GGF3 in Italy in the fall will be a good check point GGF3 in Italy in the fall will be a good check point EuroGlobus in 10 days EuroGlobus in 10 days

CERN STAR TAP June 2001 F. Gagliardi - CERN/IT 13 Conclusions Data Grids becoming the very promising distributed computing technology for data intensive sciences and large virtual distributed communities Data Grids becoming the very promising distributed computing technology for data intensive sciences and large virtual distributed communities This builds on continuous improvement of international high performance networking, QoS and cost reduction This builds on continuous improvement of international high performance networking, QoS and cost reduction Importance of transatlantic test beds and large dedicated bandwidth Importance of transatlantic test beds and large dedicated bandwidth EU DataGrid seeking for additional funding to connect to the USA (and Star Tap) EU DataGrid seeking for additional funding to connect to the USA (and Star Tap) More info on: More info on: