11/17/001 Southern Energy’s Investment in CEMIG Matt Michaud Judd Murphy Tory Noto Matt Palasek.

Slides:



Advertisements
Similar presentations
1 CAPITAL BUDGETING ISSUES IN FAST- GROWING ECONOMIES.
Advertisements

THE COST OF CAPITAL FOR FOREIGN INVESTMENTS
Valuing an Acquisition
Globalization of Mexican Businesses By Arun Kottolli.
Pricing Risk Chapter 10.
The Brazilian Energy Market ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005 ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005.
 3M is expected to pay paid dividends of $1.92 per share in the coming year.  You expect the stock price to be $85 per share at the end of the year.
Maximizing the Value of an Exit Strategy March 1, 2001 Fabian Barros Marcelo Bermudez Christopher Rowell Marimuthu Subburathinam Alexandre Wolynec.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
Common Stocks: Analysis and Strategy
Chapter 12 Risk, Return, and Capital Budgeting. Review Item  Yahoo is considering building a cafeteria for its employees.  At a high discount rate appropriate.
Other topics: Adjusted Present Value & Preferred Stock MF 807: Corporate Finance Professor Thomas Chemmanur.
1 Multinational Corporation (MNC)Foreign Exchange MarketsProduct MarketsSubsidiaries International Financial Markets Dividend Remittance & Financing Exporting.
 AEP is one of the largest investor-owned electric public utility holding companies in the United States.  AEP’s primary business segment is utility.
“Real Estate Principles for the New Economy”: Norman G. Miller and David M. Geltner Chapter 11 Introduction to Investment Concepts.
Stacie Stuart November 22, 2011 APD. Sector – Basic Materials Industry – Chemicals Established in 1940 Largest supplier of hydrogen and helium Serve.
El Faro Project: Valuing an LNG Plant in Honduras
Industrials Sector Jason Kraynak and Wade Guzdanski.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
© 2016 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 International Investments I)Factors affecting Risk and Return II) Size of Global Equity Markets III) Global market Correlations Correlation over time.
Green & Gold Fund Recommendation: HOLD Xylem, Inc.
Multinational Financial Management: An Overview 1 1 Chapter South-Western/Thomson Learning © 2003.
April 28, 2010 Team Sam Allin, Prakash Hari, Georgina Javor, Federico Ochoa, Gordon Zheng.
Recommendation: BUY United Parcel Service (UPS); Sell NG, JOYG, BHP.
Prudential Financial, Inc. Covering Analyst: Christian Meunier
INTERNATIONAL FINANCE Lecture 4. Overview Common methods to conduct international business. International trade Licensing, Franchising, Joint ventures,
The Southern Cone of South America Experiences and Recent evolution Juan Luchilo – CAMMESA APEx Conference October 2004 Leipzig - Germany.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
NARUC Joint Session, Committees on Electricity and Gas Ellen Lapson, CFA February 19, 2008.
Goal of the Lecture: Understand how to properly value a stock or bond.
EMBRATEL Emerging Markets Finance Lorena Navarro Jaime Arriagada Luis De Zabala Fernando Diaz February 26, 1999.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Chapter 10 Questions and Answers Q1. Pennsylvania Clean Coal Company (“PCCC”) generates electricity for both industrial customers as well as consumer households.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Paul J. Evanson President Florida Power & Light Company Gabelli Asset Management Company 18 th Annual Conference May 17, 2003.
1 FIN 408 International Investment Factors affecting Risk and Return Size and Number of International Open-end Funds Global market Correlations Correlation.
11/1/20151 Key Concepts In Finance Dr. Richard Michelfelder Clinical Assoc. Professor of Finance September 12, 2015 PMBA Program Boot Camp.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
Peter Clowes and Andrew Corwin
C H A P T E R 28: The Stock Market and the Economy © 2004 Prentice Hall Business PublishingPrinciples of Economics, 7/eKarl Case, Ray Fair 1 of 41 The.
Presentation to Select Committee on Economic Development
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
Financial Systems in Latin America: Where are they going? Where do we want them to go? Liliana Rojas-Suarez Washington, October 2002.
DEREGULATION OF THE ELECTRIC POWER INDUSTRY Teruaki Masumoto Executive Vice President Tokyo Electric Power Company.
Castellanza, 14 th December, 2011 Corporate Finance Lesson 11 THE MERGERS AND ACQUISITION MARKET INTRODUCTION TO COMPANY’S VALUE AND VALUATION TECHNIQUES.
Caisse Desjardins de Lévis Head Office Maxwell Reilly Sheng Kong Etienne Ricard IceAir Airlines January 26 st,
FIA Technical Workshop March 2015 Prepared by Yih Pin Tang.
 Methods in Valuation Part II. Valuation Methods  Comparable Companies Analysis  Discounted Cash Flow  Leveraged Buyout  Risk Adjusted (NPV)
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
1) The council of your town considers the renovation of an old sports center which does not generate any form of income. In its current state, the center.
© OECD/IEA Do we have the technology to secure energy supply and CO 2 neutrality? Insights from Energy Technology Perspectives 2010 Copenhagen,
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Role of Financial Markets and Institutions
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Does it exist? Is it justified?
GEORGIAN ELECTRICITY MARKET OPERATOR
Ian Alexander Wednesday, August 13th 2003 SAFIR MYT Workshop, Delhi
International Financial Management
Homework Ch 12 Electricity Regulation
Utilities Stock Presentation
Presentation transcript:

11/17/001 Southern Energy’s Investment in CEMIG Matt Michaud Judd Murphy Tory Noto Matt Palasek

Outline Project Description Southern Energy Brazil CEMIG Project Overview Solution

Project Description Partnership to purchase 33% of CEMIG voting stock from Minas Gerais –AES (65%) –Southern Energy (25%) –Opportunity Fund (10%)

Southern Energy The unregulated subsidiary of The Southern Company Southern Energy is a major Independent Power Producer (IPP) in Asia, Europe, and South America Seeking large returns in international investments

Southern Energy SEI has assumed both minority and majority positions and has gained valuable operating experience Invests in both developed and emerging markets Southern takes a long-term view of investments in emerging markets In emerging markets Southern looks to gain first-mover advantage

Brazil

10 th largest economy in the world Annual inflation reached peak of over 2500% in 1993, now down at 7.3% Foreign direct investment increased from $25 billion in 1994 to $52 billion in 1996

Brazil

Brazil is widely regarded as the best nation in Latin American for utility investments By 2007, Brazil will need an additional 30,000 MW of generating capacity, requiring an investment of $20 billion Now on cusp of full sector privatization Electricity demand growing at 5% per year 10% guaranteed return to utilities ended in 1995

Brazil Generating capacity: about 62,000 MW. Electric generation components: –Hydro: 91.02% –Fossil Fuels: 4.92% –Nuclear: 0.99% –Other: 3.07% Total Production 317 billion kWh Total Consumption 336 billion kWh Total Imports (Paraguay) 42 billion kWh

Brazil

CEMIG State-owned utility of Minas Gerais –Federal government has large minority investnment Fully integrated – generation, transmission, and distribution Has exclusive rights to sell to 96% of Minas Gerais Generally considered best utility investment in Brazil

CEMIG

Project Overview Southern’s share would cost $276 million –$126M in cash –$150M in dollar-denominated debt Thus exposing SEI to currency risk

Project Overview

Consortium would be given –Veto power on expenditures > 1 million real –4 of 11 seats on the board –3 ‘key’ executive positions –Ability to pass through costs Southern brought in partnership for industry expertise

Real options Delayed investment: wait to see how regulatory situation develops, then expand capacity accordingly Invest in gas-fired-plants: hedge against hydro power, Bolivian pipeline makes this possible Delayed bid: given that they are the only bidder, they could delay their initial bid until the regulatory situation is clear –But, the ship may sail without them

Solution – Discount Rate Base case cost of equity was 24.8% Adjustments –Assumed beta of.4 for average utility investment –Adjusted up/down for idiosyncratic risks Extreme reliance on hydro (Up) Uncertain regulatory framework (Up) Weak judicial system and unsettled political climate (Up) Cemig is fully integrated (Down) Privatization trend (Down) Improved operating margins after investment (Down) Adjusted cost of equity is 18.9%

Solution – NPV Analysis Free cash flows to common equity: Used consensus analyst cash flow estimates and adjusted to reflect operating efficiencies Assumed minimum purchase price as initial investment Accounted for optionality of delayed investment NPV without option: ($14.7M) NPV with option: $44.7M Assumptions for delayed investment option: 50% chance of deregulation (at least of wholesale market) 1,500 MW capacity investment Return (cash flow) per MW in-line with projections

Solution - Comparables Comparable Acquisition: Implied price of $34.72 –Light SA purchase by AES in 1996, Light is a distributor –Bovespa index has improved 40% since that time P/E Multiples: Average Brazil utility implies $43.79 Weighted average implies $51.92 –Weighted more heavily on fully integrated peer

What Happened? Acquisition went through at $56.15/share (minimum) Economic crisis hits Brazil in 1998 –Abandoned peg to USD –Caused by Asian currency crisis, Russian default –Since beginning of 2001 the real has depreciated by more than 20% Random –1998 – New governor of Minas Gerais sued to remove partnership’s control through local courts –2000 – Partnership wins in court –2001 – CEMIG upgraded to ADRs on NYSE

What Happened? – Energy crisis in Brazil –Drought led to lack of hydro-generation –Consumers asked to cut consumption by 20% –Inadequate transmission system means electricity cannot get to underserved markets –Government ordered 50 thermoelectric plants to be built, but lack of guarantee led to dearth of investors –Thus far 36 plants are in process of being built (14,200 MW) and Brazil entered into a power contract of 2,800 MW from Paraguay and Argentina.