43.35” (LENGTH OF INNER LIQUID HE RESERVIOR)  CONNECTION CHAMBER: FF 4.75”  FF: FLANGE-TO-FLANGE DISTANCE 10.45” TO 12.45” 6.35” TO 8.35” (JACK -2” TO.

Slides:



Advertisements
Similar presentations
CRIMPING Introduction
Advertisements

Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Mechanical Engineering Design Review BL ARPES Endstation Derek Yegian, Jonathan Denlinger, Keith Franck 4/18/2008.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
TrailerBot is a robot that moves trailer as using connecting device on the back of a truck with only driving space. Learn about standard that divides vehicle’s.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
Measuring tools Modern engines use thinner casting and require more precise measuring Selectively fit engines All parts are measured and marked according.
Unit 4 Extension Lines And Dimension Lines
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
Preparing … First of all, recycle monitor power using AC power switch. Connect serial cable between your PC and monitor. (RS-232 Connector). Refer to Appendix.
Volume.
Volume.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
Drilling String Design
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Designing a Circularly Polarized Antenna for EagleSat Dadija Bliudzius Embry-Riddle Aeronautical University NASA Space Grant.
Shankar Sehgal UIET, Panjab University, Chandigarh
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Chapter Three Drawing Representation:
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
ABSOLUTE MOTION ANALYSIS Today’s Objective: Students will be able to: 1.Determine the velocity and acceleration of a rigid body undergoing general plane.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
EC_ASIC drawing (1) ASIC BASIC FASIC D 68 pi ns ASIC A 68 pi ns ASIC C ASIC E 120 pins ABCDEF 68 pi ns 68 pi ns 68 pi ns 68 pi ns.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
BullBot is bull robot that can have bull fight with techniques of butting or lifting. Learn how bull fight, Korean traditional game, had started and kinds.
Refraction of light through a Convex Lens. Lens diagram a cross section through the centre plane.
Strategy Using Strategy1. Scan Path / Strategy It is important to visualize the scan path you want for a feature before you begin taking points on your.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
The HCAL barrel absorber structure
Prisms & Cylinders Development with a cut surface 1 J. Byrne 2014.
Learning Objective: I can calculate the circumference of a circle (Level 6) Green Questions 1. Measure the radius and diameter of the below circles r =
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Conduit fittings.
INFN- Legnaro National Lab. Activity on ESS DTL Diagnostics: BPM & BCM
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
Lesson 2 1 J. Byrne String & Pins String & Pins Take half the Major axis and strike an arc on the X line to give you a Focal Point. F1 Repeat for.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
ABSOLUTE MOTION ANALYSIS Today’s Objective: Students will be able to: 1.Determine the velocity and acceleration of a rigid body undergoing general plane.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
Update of MVD services and requests
Group Members: M. Khayam Shahzad M. Murtaza Farrukh Aneel Abbasi.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Christian Veelken last updated 11/09/06
HPS Motherboard Electronic Design
Week 2 Experimentation TS Term 2.
ABSOLUTE MOTION ANALYSIS
First of all we will remind some numbers:
HCAL HV splice box.
Comparison of heat loss with a wetsuit vs. without
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
A # Gasket spacing between flanges are not included in dimensions.
Observed CE/RE Failures in the Display Product CE(Conducted Emission )
Volume.
Single Detector Design
Presentation transcript:

43.35” (LENGTH OF INNER LIQUID HE RESERVIOR)  CONNECTION CHAMBER: FF 4.75”  FF: FLANGE-TO-FLANGE DISTANCE 10.45” TO 12.45” 6.35” TO 8.35” (JACK -2” TO 0) (BOTTOM OF HE COLD FINGER TO A-A FOCAL POINT) COARSE-Z JACK + RNN FF 5.7” TO 7.7” NIPPLE 3.56” 2.47” 50.4” (BETWEEN BOTTOM OF CAGE AND MIDDLE OF CONNECTION CHAMBER) = 42.55” + (7.85” BASED ON SCANNING POSITION AT -0.5”)  PROBE/SCANNER HEIGHT 1.42” (36MM SPECIFIED BY INTEMATIX)  BOTTOM PLATE THICKNESS 0.25” ~ 3.33” TO 5.33”  SCANNING POSITION:  Z-STAGE (ATTOCUBE – FULL RANGE 15MM) EXTENSION ~ 0.43” (11MM)  JACK AT -0.5” (THIS DIMENSION DETERMINES HEIGHT OF SPM CAGE – POSSIBLE RANGE -0.2” TO -0.8”)  TRANSFER POSITION:  Z-STAGE ~ 0 =>  JACK NEEDS TO GO DOWN ~1” -1.5”) 10-PIN FEEDTHROUGH FOR SIGNALS (2 FOR TUNNELING CURRENT) HV CABLES (PZT) GO UP THROUGH THE CONNECTION CHAMBER 3.86” LIQUID N 2 CRYO-SHIELD/ANCHOR  COARSE-Z JACK: FF 4.27” TO 6.27” (-2” TO 0)  RNN: DIFFERENTIALLY PUMPED ROTARY PLATFORM – POLAR ROTATION ~ 7.33 TO 8.19” 0.84” FEMALE SMA CONNECTOR  LENGTH OF RF CABLE: 53.9” (FROM BOTTOM OF PROBE CAGE TO FACE OF MALE SMA CONNECTOR) 50.4” + ~0.5” (BENT SECTION IN MIDDLE OF CONNECTION CHAMBER) + 3” (STRAIGHT SECTION BEYOND BENT TO FACE OF MALE CONNECTOR)  A U-SHAPED SECTION NEEDS TO BE ADDED TO EACH OF THE RF CABLES BELOW THE CAGE TO CONNECT TO THE PROBE THE “U’ SECTIONS NEED TO FIT WITHIN A CYLINDER OF HEIGHT 2” BY ID 2.37”  LENGTH OF RF CABLE: 53.9” (FROM BOTTOM OF PROBE CAGE TO FACE OF MALE SMA CONNECTOR) 50.4” + ~0.5” (BENT SECTION IN MIDDLE OF CONNECTION CHAMBER) + 3” (STRAIGHT SECTION BEYOND BENT TO FACE OF MALE CONNECTOR)  A U-SHAPED SECTION NEEDS TO BE ADDED TO EACH OF THE RF CABLES BELOW THE CAGE TO CONNECT TO THE PROBE THE “U’ SECTIONS NEED TO FIT WITHIN A CYLINDER OF HEIGHT 2” BY ID 2.37” FEMALE SMA CONNECTOR RF CABLE 2.47”

43.35” (LENGTH OF INNER LIQUID HE RESERVIOR)  CONNECTION CHAMBER: FF 4.75”  FF: FLANGE-TO-FLANGE DISTANCE 10.45” TO 12.45” 6.35” TO 8.35” (JACK -2” TO 0) (BOTTOM OF HE COLD FINGER TO A-A FOCAL POINT) COARSE-Z JACK + RNN FF 5.7” TO 7.7” NIPPLE 3.56” 2.47”  PROBE/SCANNER HEIGHT 1.42” (36MM SPECIFIED BY INTEMATIX)  BOTTOM PLATE THICKNESS 0.4” ~ 3.33” TO 5.33”  SCANNING POSITION:  Z-STAGE (ATTOCUBE – FULL RANGE 15MM) EXTENSION ~ 0.39” (10MM)  JACK AT -0.5” (THIS DIMENSION DETERMINES HEIGHT OF SPM CAGE – POSSIBLE RANGE -0.2” TO -0.8”)  TRANSFER POSITION:  Z-STAGE ~ 0 =>  JACK NEEDS TO GO DOWN ~1” -1.5”) 10-PIN FEEDTHROUGH FOR SIGNALS (2 FOR TUNNELING CURRENT) HV CABLES (PZT) GO UP THROUGH THE CONNECTION CHAMBER 3.86” LIQUID N 2 CRYO-SHIELD/ANCHOR  COARSE-Z JACK: FF 4.27” TO 6.27” (-2” TO 0)  RNN: DIFFERENTIALLY PUMPED ROTARY PLATFORM – POLAR ROTATION ~ 7.33 TO 8.19” 0.84” FEMALE SMA CONNECTOR  LENGTH OF RF CABLE: 53.9” (FROM BOTTOM OF PROBE CAGE TO FACE OF MALE SMA CONNECTOR) 50.4” + ~0.5” (BENT SECTION IN MIDDLE OF CONNECTION CHAMBER) + 3” (STRAIGHT SECTION BEYOND BENT TO FACE OF MALE CONNECTOR)  A U-SHAPED SECTION NEEDS TO BE ADDED TO EACH OF THE RF CABLES BELOW THE CAGE TO CONNECT TO THE PROBE THE “U’ SECTIONS NEED TO FIT WITHIN A CYLINDER OF HEIGHT 2” BY ID 2.37”  LENGTH OF RF CABLE: 53.9” (FROM BOTTOM OF PROBE CAGE TO FACE OF MALE SMA CONNECTOR) 50.4” + ~0.5” (BENT SECTION IN MIDDLE OF CONNECTION CHAMBER) + 3” (STRAIGHT SECTION BEYOND BENT TO FACE OF MALE CONNECTOR)  A U-SHAPED SECTION NEEDS TO BE ADDED TO EACH OF THE RF CABLES BELOW THE CAGE TO CONNECT TO THE PROBE THE “U’ SECTIONS NEED TO FIT WITHIN A CYLINDER OF HEIGHT 2” BY ID 2.37” FEMALE SMA CONNECTOR RF CABLE Updated version 8/23/ ” = (50.55” +2.47” ”) 50.55” (BASED ON SCANNING POSITION AT -0.5”) 5.65” 39.25” ~ 17” TO THE TABLE