13 ° COSMO General Meeting 2011 - Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.

Slides:



Advertisements
Similar presentations
Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
Advertisements

8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
System Design and Analysis
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Fundamentals of Information Systems, Second Edition
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DECISION SUPPORT SYSTEM DEVELOPMENT
Introduction to Systems Analysis and Design
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Introduction to Systems Analysis and Design Trisha Cummings.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Software Engineering Modern Approaches
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
12° COSMO General Meeting – Moscow Sept 2010 VERSUS2 Priority Project Report Adriano Raspanti.
End HomeWelcome! The Software Development Process.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
11° COSMO General Meeting – Offenbach Sept 2009 VERSUS2 Priority Project Report.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP VERSUS2 Status Report VERSUS Meeting 04/03/2010, Langen.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
IS 325 Notes for Wednesday August 28, Data is the Core of the Enterprise.
Project Cost Estimate Form PLAN IT! Todd Crosby. The Project Cost Estimate Form These are your best “educated guesses” – it is expected that data will.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
WG 6 and Support Activities Plans for the next Year.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
10° General Meeting Adriano Raspanti - WG5 – VERSUS PL.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
T Project Review Muuntaja I1 Iteration
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Software Engineering Lecture 9: Configuration Management.
The information systems lifecycle Far more boring than you ever dreamed possible!
Deutscher Wetterdienst VERSUS at DWD Ulrich Damrath & Ulrich Pflüger COSMO GM Rome, September 2011.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
Architecture Review 10/11/2004
New task within PT Support Activities “Support of COSMO licensees”
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Supporting quality devices
Overview on the Work of WG 6
5th Session of the Task Team on WIGOS Metadata
Summary of WG6 activities
CS 501: Software Engineering Fall 1999
Weather Type Dependant
Engineering Processes
CLINICAL INFORMATION SYSTEM
Introduction to Systems Analysis and Design
ESSnet on SDMX phase II Laura Vignola
Software life cycle models
David Palella, Filodea Pastorelli
Systems Construction and Implementation
Systems Construction and Implementation
Engineering Processes
Selected Priority Projects
Chapter 8 Prototyping and Rapid Application Development
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Preparing a new Model Version according to Source Code Management
Activities of WG7 Chiara Marsigli.
Presentation transcript:

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti

13 ° COSMO General Meeting Rome VERSUS2 Priority Project PHASE 3: COSMO year 2011

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 0: Help Desk, bug-fixing activities and release of a VERSUS update Main Activities –Help Desk activities for VERSUS users –Software maintenance –Test/release of package and Manuals updates to be delivered to the users – Stress test of the system (definition of benchmark) Deliverables –Package updates: COSMO year 2011 Versus Forum, Patch05, New Complete Installation package, Patch6beta (wave model), Patch6 Benchmark executed Stress of the system – under definition by Vanessa

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 1: Improvement of VERSUS security, “plug&play” installation and Web pages From the experience of several partners, improvements are needed regarding the security of the VERSUS software in a complex environment as well as installation procedures for new versions and patches and, finally, Web GUI search pages.

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 1: Improvement of VERSUS security, “plug&play” installation and Web pages Main Activities Task 1a: Collection of requirements Task 1b: Implementation of improved security of the system Task 1c: Development of a new installation and patch update procedures Task 1d: Development of back-up functionalities for the DB Task 1e: Review of Web GUI search pages for improved functionality SUCCESSFULLY COMPLETED

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 2: Final Implementation of Feedback Files in VERSUS The use of Feedback Files (FF) is important to improve upper air verification and Conditional Verification activities where large amounts of data must be manipulated. A feasibility study on how to proceed with the implementation of FF has been created by the PL team and reviewed by DWD in July 2010 and the new Database Structure for FF has been created by PL team. Software by DWD to upload FF data is under investigation at the moment. Main Activities –Task 2a: Implementation of Loader module for FF –Task 2b: Creation of new Web GUI for FF –Task 2c: Conditional Verification for data from FF (Requirements by DWD) –Task 2d: Stand-alone tool for FF creation for all partners with Documentation –Task 2e: Dedicated test phase for FF tool implementation and FF functionalities in VERSUS STOPPED completed next year

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 3: Improvement of graphical representation of scores VERSUS already provides some basic representation of statistical scores developed using the JpGraph package. Improvements and new plots can be added using “R” language. Input data coding for new plots or modification to the existing code for the creation of new plots should be based on the actual VERSUS data model for obs, fcs and statistical scores. Main Activities –Task 3a: Survey and collection of requirements for new graphics and improvements of existing graphics from the partners for both surface and upper air. Review of R package plots availability and compliance with requirements and their full description for VERSUS implementation (input data format and expected output) –Task 3b: Creation of new plots, if any, based on the requirements using “R” or JpGraph. Fulll description of data input. Test phase. –Task 3c: Implementation in VERSUS system (interface with database) SUCCESSFULLY COMPLETED PATCH06 under test right now released soon.

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 4: Implementation of Probabilistic Scores Following the Guidelines from TASK5 – Phase 2, Probabilistic Scores will be implemented, possibly using the “R” verification package. A capability of the software to handle ensemble forecasts and verifying them through the deterministic approach, has already been added in the last version of VERSUS. Main Activities –Pre-Task 4: Delivery of the reviewed EPS DocumentDelivery of the reviewed EPS Document –Task 4a: Comparison between the Guidelines and the “R” verification package documentation, including graphics –Task 4b: Full description of R code and associated graphics (from the Guidelines) –Task 4c: Implementation of “R” package in VERSUS with documentation (or other software code) –Task 4d: Creation of new Web pages for GUI Partially COMPLETED: 4c, 4d are actually ongoing

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase3 PHASE 3: COSMO year 2011 Task 5: Fuzzy Verification Toolbox and Object-oriented Verification The use of gridded observations (analysis field) is crucial to apply special verification methods for very high-resolution models, such as Fuzzy verification (through the use of Fuzzy toolbox) and object-oriented verification (MODE and SAL). Main Activities –Pre-Task 5: Completion and test of standard verification with gridded analysis –Task 5a: Test and documentation of C version of Fuzzy Toolbox developed by Romania. Creation of graphics (from High- Resolution Verification Priority Project Report) using “R”. –Task 5b: Implementation in VERSUS system –Task 5c: Feasibility study on the implementation of SAL and other methods objected oriented (from MET software e.g.). Complete description for possible implementation in VERSUS (e.g. input and output data). COMPLETED Pre-task and partially Task5a. Task 5c not activated

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Task 0: Help Desk, bug-fixing activities and release of a VERSUS update Main Activities Help Desk activities for VERSUS users Software maintenance Test/release of package and User and Technical Manuals updates to be delivered to the users through ftp Stress test of the system. Deliverables Package updates: COSMO year 2012 Estimated resources 0,5 FTEs for PL and PL team 0,2 FTEs for HNMS (Test of patches and editing/review of Manuals) 0,1 FTE’s for MCH (stress of the system) PHASE 4: COSMO year 2012 Implementation of further functionalities as from the SDA doc and consolidation of the system

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 1: Consolidation and fine tuning of the system This task it is connected with the stress tests and in general with TASK0 and it is aimed to improve the easiness in using the system, its functionalities and performances. Main Activities Task 1a: Collections of stress tests results, analysis and identification of critical functionalities Task 1b: Implementation of a standard procedure for fine tuning Task 1c: Test of tuning efficiency Task 1d: Development of connection functionalities for the DB (operational DB, test DB) Task 1e: Review of Web GUI for new facilities

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 1: Consolidation and fine tuning of the system Deliverables Task 1a: GM up to end of October – Final Document Task 1b,c,d,e: Update of VERSUS package: April 2012 Estimated resources Task1a: 0,05 FTEs for MCH Task1b,d,e: 0,25 FTE PL team Task 1c: 0,05 FTEs HNMS Start: September 2011.

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 2: Final Implementation of Feedback Files in VERSUS The use of Feedback Files (FF) is important to improve upper air verification and Conditional Verification activities where large amounts of data must be manipulated. A feasibility study on how to proceed with the implementation of FF has been created by the PL team and reviewed by DWD in July 2010 and the new Database Structure for FF has been created by PL team. Software by DWD to upload FF data is under investigation at the moment. The Task 2 from Phase 3 was stopped because of other priorities in COSMO year It will now be completed in phase 4. Main Activities Task 2a: Implementation of Loader module for FF Task 2b: Creation of new Web GUI for FF and improvement of graphics for upper air Task 2c: Conditional Verification for data from FF (Requirements by DWD) Task 2d: Stand-alone tool for FF creation for all partners with Documentation Task 2e: Dedicated test phase for FF tool implementation and FF functionalities in VERSUS

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 2: Final Implementation of Feedback Files in VERSUS Deliverables Update of VERSUS package with the new functionalities. Deadline: June 2012 Tool for FF by DWD for all partners. Deadline: March 2012 by DWD Estimated resources 0,05 FTE for PL Team: Task 2a 0,1 FTE for PL Team: Task 2b 0,15 FTE for PL Team: Task 2c 0,1 FTE for DWD: Task 2d 0,1 FTE for DWD: Task 2e Functionalities in VERSUS and test of FF tool. Start: ongoing

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 3: Implementation of new BUFR format and GRIB2 The adoption by WMO of a new template for BUFR is the main reason for this task as well as the foreseen use of GRIB2 as output of COSMO models. Main Activities Task 3a: Update the system for the upload functionality of new BUFR template and merge (in space and time) with the old format. The use of the new template will make more flexible verification of more cumulated period for precipitation. A document describing the activity will be delivered and approved in advance Task 3b: Update the system for the treatment of forecasts produce coded in GRIB2 format. A document describing the activity will be delivered and approved in advance Task 3c: Implementation of features for verification of experimental versions of the model with both GRIB1 and GRIB2 Deliverables Updates of VERSUS package with the new functionalities. Deadline: September 2012 Estimated resources Task 3b,c: PL team 0,3 FTE’s Task 3a: review of the documents 0,02 each partner Start: May 2012

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 4: Implementation of Probabilistic Scores Following the Guidelines from TASK5 – Phase 2, Probabilistic Scores will be implemented, possibly using the “R” verification package. A capability of the software to handle ensemble forecasts and verifying them through the deterministic approach, has already been added in the last version of VERSUS. Task is still ongoing from COSMO year Main Activities Pre-task: Completion of description of “R” package for EPS verification Task 4a: Implementation of “R” package in VERSUS with documentation Task 4b: Creation of new Web pages for GUI Deliverables Pre-task deadline November 2011 Task 4: Update VERSUS with new features for Probabilistic scores: Deadline: March 2012 Estimated resources 0,05 Pre-task for RHM 0,2 FTE for PL Team: Task 4a, 4b Start: Ongoing

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Phase4 Task 5: General Improvements from the USERS ??? Main Activities Pre-Task: Report from VERSUS parallel session Task 5a: VERSUS Workshop in November in Pratica di Mare Deliverables Updates of VERSUS package with the new functionalities. Deadline: September 2012 Estimated resources ??? Start: NOW!

13 ° COSMO General Meeting Rome VERSUS2 Priority Project Tentative contribution Phase4 Task Contributing scientist(s)FTE- yearStartDeliverablesDate of delivery Preceding tasks Task 0 PL team – Italy Patches and new vers. test – HNMS Stress of the system - MCH Total 0.8 0,5 0,2 0, Help Desk, bugs fixing activities and release of VERSUS update Task 1.1a.1b,d,e.1c MCH PL team - Italy HNMS Total ,05 0,25 0, Consolidation and fine tuning of the systemMay 2012Installation must be completed Task 2.2a,b,c.2d.2e PL Team DWD Total ongoingFinal Implementation of Feedback FilesJune 2012 Task 3 0,3 0,02 USAM - PL team, all members Each member Tot ,3 0,02* Implementation of new BUFR and GRIB2 formatSeptember 2012 Task 4 Pre-task 4a,b RHM USAM - PL team Total ,05 0,37 OngoingImplementation of Probabilistic ScoresMarch 2012