1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.

Slides:



Advertisements
Similar presentations
Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
Tagger Microscope:  Performance Features Under Test Detector Alignment  Simulations show that when fiber axis is aligned to < 3 o of the e - trajectory.
James M c Intyre University of Connecticut GlueX Collaboration Meeting JLab, Feb. 2-4, 2011.
7 Oct 2011 Fall 2011 GlueX Collaboration Meeting Jefferson Lab Newport News, VA 1 Tagger Microscope (Top View) Tagger Magnet Photon Beam e - Beam.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Performance of CRTNT for Sub-EeV Cosmoc Ray Measurement Zhen Cao IHEP, Beijing & Univ. of Utah, SLC Aspen, CO, 04/2005.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Update on the CDC GlueX Collaboration Meeting October 2006.
Calorimeter upgrade meeting – Phone Conference– May 5 th 2010 First prototyping run Upgrade of the front end electronics of the LHCb calorimeter.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
CDMS II Shielding To Installation To Construction From Design.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
SiPM Readout ASIC LAPP Contribution JM Dubois, N. Fouque, R. Hermel, G. Lamanna, F. Mehrez, J.L. Panazol, J. Prast, S. Rosier.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
SHMS Aerogel Detector Construction is complete
Commissioning of the Crystal evaluation setup
E. Noah, A. Blondel, Y. Favre, R. Tsenov 29 July 2015
Front-end electronic system for large area photomultipliers readout
SiPM Readout ASIC LAPP Contribution
BESIII EMC electronics
Tagger Microscope Detector & Electronics Status
Scintillator HCal Prototype
Presentation transcript:

1

2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics adaptation for 50 micron pixel SiPMs scintillation yield with cosmic rays GlueX Collaboration Meeting, JLab October 4-6, 2012

3 Contract Status Construction Plan  Draft – Sept  ~ 50 page document  Detailed instructions for construction  Currently revising based on feedback Copy location: Quality Assurance & Acceptance Test Plan  Draft – Sept  Currently revising based on feedback Copy location: GlueX Collaboration Meeting, JLab October 4-6, 2012

4 Construction Status Contract timeline  Tagger Microscope  t 0 - October 2012  ??? GlueX Collaboration Meeting, JLab October 4-6, 2012

5 Construction Status Contract timeline  Active Collimator GlueX Collaboration Meeting, JLab October 4-6, 2012

6 Preparations for Construction After Before GlueX Collaboration Meeting, JLab October 4-6, 2012

7 Populating the Construction Area Fiber Cutting Station GlueX Collaboration Meeting, JLab October 4-6, 2012

8 Populating the Construction Area Fiber Splicing Station GlueX Collaboration Meeting, JLab October 4-6, 2012

9 Populating the Construction Area Heat Treating Fibers GlueX Collaboration Meeting, JLab October 4-6, 2012

10 Populating the Construction Area Heat Treating Fibers GlueX Collaboration Meeting, JLab October 4-6, 2012

11 Populating the Construction Area Heat Treating Fibers GlueX Collaboration Meeting, JLab October 4-6, 2012

12 Populating the Construction Area Fiber Testing Station (inside a clean room)  Allows for testing of: Single fibers Bundled fibers Cooling unit for the electronics’ enclosure Dark Box (main frame) GlueX Collaboration Meeting, JLab October 4-6, 2012

13 Populating the Construction Area Staging Areas &Work Stations Bundling Table Heat Treating Station Fiber Testing Station (Clean Room) Work Table (Clean room) GlueX Collaboration Meeting, JLab October 4-6, 2012

14 Populating the Construction Area Ventilation Unit GlueX Collaboration Meeting, JLab October 4-6, 2012

15 Populating the Construction Area Additional Infrastructure Lighting & Outlets Bundle Storage GlueX Collaboration Meeting, JLab October 4-6, 2012

16 Tagger Microscope Electronics Experimental setup Current testing bench: Dark chamber NIM bin and modules Can be used for all aspects of quality assurance GlueX Collaboration Meeting, JLab October 4-6, 2012 Second testing bench: New dark chamber JLab FADC Computer with CODA Can be used for all aspects of quality assurance

17 Tagger Microscope Electronics Electronics changes Change from 25 µm to 50 µm SiPM: Gain ~2.7x larger with 50 µm Lowered amplifier gain to compensate Found 30% power reduction GlueX Collaboration Meeting, JLab October 4-6, 2012 Differences: Increased 3 resistors while keeping operating voltages the same Included parallel RC circuit to push low frequency gain ‘bump’ out of the operating range 50 µm 25 µm

18 Tagger Microscope Electronics Future plans Engineering update of preamplifier, backplane, and control boards Submit design for fabrication and component population Solder Eurocard connectors and SiPMs in lab Perform basic board quality tests Measure output pulse shape, gain, cross-talk Run boards for an extended period of time to burn them in GlueX Collaboration Meeting, JLab October 4-6, 2012

19 Tagger Microscope Scintillation Yield Bench Tests with Cosmic Rays (from June mtg, 25 micron pixel SiPM) GlueX Collaboration Meeting, JLab October 4-6, 2012 pedestal tail 1pe = 5 channels adc channels single fiber readout with 250MHz FADC trigger on the same channel only tail of spectrum visible from cosmic rate integral: median ~16pe 130 pe / axial electron track

Tagger Microscope Scintillation Yield Bench Tests with Cosmic Rays : update (since June mtg, 50 micron pixel SiPM) GlueX Collaboration Meeting, JLab October 4-6, 2012 trigger gain is re-balanced at 5chan/pixel cosmic yield: 30 pe (MP) 300 pe/axial electron track (specification is 220) sum column 1 sum column 3

21 Summary Quality assurance & acceptance test plan being revised Construction plan written and being reviewed Infrastructure needed for construction is ~85% complete On track for readiness review (previously estimated - 11/2012) Scintillation yield with 50-micron pixel SiPM’s meets requirements Electronics prototyping phase is completed Construction to begin as soon as contract is in place GlueX Collaboration Meeting, JLab October 4-6, 2012

22 Questions? GlueX Collaboration Meeting, JLab October 4-6, 2012