Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Residual Value.

Slides:



Advertisements
Similar presentations
Accounting for Share-Based Payments
Advertisements

© Hyder Consulting Pty Ltd Local Government Waste Summit 2006 Total Cost Approach for Waste Management Christine Wardle 10 February 2006.
Contemporary Issues & Complying with Industry Standards 2006 Asset Accounting & Management Conference David Edgerton FCPA Queensland Audit Office.
Balance Day Adjustments. What is a Balance Day The Last day of Accounting Year Example: 31 March 20XX.
22 nd Conference Roads and Works Asphalt Trial – Outcomes so far Rod Ellis Board Member IPWEA SA.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
2013 NPMA Spring Conference Value Through Professional Asset Management Useful Life.
Innovation or Excellence in Sustainability in Pavement Stabilisation LEIGHTON CONTRACTORS AustStab Excellence Awards 2012.
Asset Valuation: Getting value on the road ahead Damien Douglas Senior Asset Management Engineer Opus International Consultants Perth, Western Australia.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Depreciation.
SUCCESSFULLY ADDRESSING ASSET AND FINANCIAL MANAGEMENT CHALLENGES John Comrie 14 May 2015.
December 4, National Capital Heavy Construction Association Committee of the Whole 2009 Draft Operating and Capital Budgets Tax Supported Programs.
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning LESSON 18-2 Calculating Depreciation Expense.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value The Practicals side of Fair Value Focus.
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Human Resource Management in Australia 2e by De Cieri, Kramar, Noe, Hollenbeck, Gerhart & Wright.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Valuation and Depreciation of Road Infrastructure.
Valuers and Asset Management Depreciation Why it’s time to think a little differently SA LGFMG Conference March 2009 David Edgerton.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
LKAS 8 Accounting Policies Changes in Accounting Estimates and Errors
15-1 Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Introductory Accounting 2r, by David Willis By Kaye Watson Chapter 15 – Depreciation, Disposal.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Financial Accounting 4e by Craig Deegan 4–1 Chapter 4 Depreciation of property, plant.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Implications of AASB’s Residual Value.
Darwin City Council’s Asset Management Journey, Learning & Future Directions LUCCIO.
Chapter 7 Probability and Samples: The Distribution of Sample Means.
5-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Financial Accounting 5e by Craig Deegan Slides prepared by Craig Deegan Chapter.
Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012.
30-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Financial Accounting 5e by Craig Deegan Slides prepared by Craig Deegan Chapter.
Solve absolute value inequalities Section 6.6 #45 The chief forms of beauty are order and symmetry and definiteness, The chief forms of beauty are order.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value 2015 LG Workshops NSW.
Copyright © 2012 McGraw-Hill Australia Pty Ltd PPTs to accompany Deegan, Australian Financial Accounting 7e 2-1 Chapter 34 Translating the financial statements.
ADB Grant No.0133-CAM/Component 1: PFMRD ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Day 1: June 07,
Estimation of Stone-loss on network condition surveys by use of multiple texture lasers Thomas Wahlman, Peter Ekdahl,
THE HOMEWORK... WHAT’S THE POINT?. GOT TO DO HOMEWORK? Because it’s assigned by the teacher, and will be corrected/graded Because quizzes/exams are kind.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
BAF3M Calculating Depreciation *There will be a note to copy at the end of the slides *
Employment Skills for Communications Technology..
. Copyright  2010 McGraw-Hill Australia Pty Ltd PPTs to accompany Deegan, Australian Financial Accounting 6e 5-1 Chapter 5 Depreciation of property, plant.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Treatments and Resets. PerformanceIndex CompositeIndex Triggers Treatments PerformanceModeling ExpressionsAndFilters Costs Resets Outputs GenerateStrategiesOptimize.
HDM-4: Pavement Deterioration Modeling and Road User Effects
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Chapter 9 Introduction to the t Statistic
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Asset Valuation and Depreciation Implications.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Accounting and Asset Management NSW LG.
Chapter 17.
Asset Depreciation Lecture No. 30 Chapter 9
SUCCESSFULLY ADDRESSING ASSET AND FINANCIAL MANAGEMENT CHALLENGES
Multi-Year Programming and Predictive Modelling
Town of Clayton 2016 Pavement Condition Survey
Presenters: Sumon Roy1 and Badrul Ahsan1
Decentralization and Performance Evaluation
Pavement condition index calculation
© 2014 Cengage Learning. All Rights Reserved.
Starter.
Chapter 17.
Gerald Dyer, Jr., MPH October 20, 2016
AMIS 310 Foundations of Accounting
SUCCESSFULLY ADDRESSING ASSET AND FINANCIAL MANAGEMENT CHALLENGES
Chapter 17.
Capital Budgeting and its Techniques
Treatment of inventories and development costs
Chapter 10 – Software Testing
Homoscedasticity/ Heteroscedasticity In Brief
Homoscedasticity/ Heteroscedasticity In Brief
Chapter 17.
LESSON 19-2 Calculating Depreciation Expense
Presentation transcript:

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Residual Value

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Concept of Residual Value Similar to a Salvage Value Concept. Most infrastructure will have residual value. Reason for applying residual and method of residuality is a function of Asset Management and Renewal Practice

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Snapshot View AASB 116 Depreciation reflects pattern of Consumption. Must only depreciate depreciable amount $60,000 2 $100,000 Cost to renew back to original = 60K Therefore Residual = 40k or 40%

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management What is the Residual? –Million $ Question Residual depends on renewal practice. When we replace the component: –Do we renew it back to original LoS? –Do we renew it to a ‘just acceptable’ threshold? –Has the new component got the same expected life as original, less life or more life?

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Computing Residual isn’t Rocket Science Let us look at some scenarios. Reezeedool Council - Pavement Component Baseline Case: Typical Structure - 300mm pavement base and 30mm Asphalt. Typical Renewal point: pavement defect rating 6 and/or crocodile cracking and ravelling at condition 5 and beyond. Optimal Treatment at this point: Mill 100mm off the top and mix. Stabilise. Roll, Compact and Resurface.

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Computing Residual isn’t Rocket Science CriteriaMost Common situation Outlier 1 – CBDOutlier 2 – Rural North TreatmentMill and Resheet Pavement Digout and Patch Extent of existing practice100mm in a typical 300mm depth mm in typical 300mm depth 200mm in typical 300mm depth ReasonTraffic management and volume High commercial vehicle % Cost to replace asset if wiped off overnight $120/sqm $80/sqm Cost to renew using existing practice $60/sqm$80/sqm$60/sqm Residual50%33%25%

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Residual Errors – Common ones Computing residuals in isolation to AM practice. Assumption that there is no residual. Assumption that we can look for a state- wide figure to apply for residual. Assumption that residual is depreciable. Assumption that residual is an accounting figure, unrelated to asset management.

Copyright © ACEAM Pty Ltd 2009 Australian Centre for Excellence in Asset Management Suggestions Understand your context. Look in the AM plan – what is our standard practice? Do I have pockets of practice that are statistically valid samples (CBD, outer rural, inner rural). If my our practice of renewal is fairly consistent, one residual figure across the lot makes sense. Do not use a sledge hammer to kill a fly !