DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Application of Advanced Exploration Technologies for the Development of Mancos Formation Oil Reservoirs, Jicarilla Apache Indian Nation, San Juan Basin,
The Evolution of a New Mooring System for Ultra-Deep Waters By Charles N. White Strategic Offshore Solutions – Houston Fall.
“RESERVOIR ENGINEERING”
Phase Behavior Solid Organic Precipitation and Mobility Characterization Studies in Support of Enhanced Viscous Oil Recovery On Alaska North Slope
Classification: Internal Status: Draft WAG Mechanisms at macroscopic/ field level Presentation at FORCE WAG Seminar Stavanger, 18 Mar 2009 Anders Gjesdal.
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
Dr. Mohammed M. Amro Petroleum Engineering Dept. King Saud University Effect of Scale and Corrosion Inhibitors on Well Productivity in Reservoirs Containing.
Rock & Fluid Properties Dr. Eissa Mohamed Shokir
Unit 4: Primary Resources Energy from the Oceans.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
OCEN 201 Introduction to Ocean & Coastal Engineering Offshore Structures Jun Zhang
Introduction to Capillary Pressure Some slides in this section are modified from NExT PERF Short Course Notes, However, many of the slides appears.
OVERVIEW OF PETROLEUM ENGINEERING.
Solutions for Flaring & Venting CNG Marine Transportation
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Reservoir Performance Curves
TRAINING COURSE “ENGLISH-RUSSIAN OIL AND GAS TERMINOLOGY” Moscow, 2011 Petrotran.
Oil & Gas Underwriting Analyzing the Return Potential.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Chapter 1 RESERVOIR.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
OilSim Exploration OLF OILSIM Overview Purpose: Enhance your overall understanding of petroleum exploration Multidisciplinary challenge You are.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
ENGINE Leiden Combining Areal Underground and Infrastructure Data to Minimize Exploration and Economic Risks Thomas Kohl, GEOWATT AG Clément Baujard,
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Well Logging/Nuclear Kevin Kapka. Basic History The use of radiation to analyze formations appeared shortly after World War II. The initial application.
Modelling Unconventional Wells with Resolve and Reveal Juan Biörklund (Gauloise Energía) and Georg Ziegler (Wintershall Holding)
Jens Petur Bærentsen Simprentis Marcos Monteferrante OILSIM EXPLORATION Svalex 2007 Longyearbyen, Svalbard, Norway August 2007.
OilSim Faroes 2007 Facilitator Course Tórshavn, 2. Oktober, 2007.
Professor Peter Styles Keele University United Kingdom.
Gas Condensate Reservoirs: Sampling, Characterization and Optimization SPE Distinguished Lecture Series F. Brent Thomas.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Well Log Interpretation Basic Relationships
Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be offset.
FOOD ENGINEERING DESIGN AND ECONOMICS
Classification: Internal Status: Draft Design of offshore structures in a field development perspective ”From nothing to nothing with solid profit” $$
Environmental Toolbox. Technical Module Introduction.
1 SPE Distinguished Lecturer Program Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe.
Wytch Farm Field Development Project
Rock & Fluid Properties
PHASE 7 FACILITIES ENGINEERING
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Can Carbon Capture and Storage Clean up Fossil Fuels Geoffrey Thyne Enhanced Oil Recovery Institute University of Wyoming.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
1 1 Presenter / date if required Independent, integrated thinking.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
ARTIFICIAL LIFT METHODS
Petroleum.  Petroleum is a naturally occurring liquid mixture that contains mainly hydrocarbons  Petroleum also contains oxygen, nitrogen and sulphur.
 BASIC TERMS AND CONCEPTS (1) Petroleum: refers to crude oil and natural gas or simply oil and gas. (2) Crude oil: refers to hydrocarbon mixtures produced.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
GSE - Gas Storage Europe1 GSE Investment Workshop “ Physical specificities of gas storage” Brussels, 24 May 2007.
Underground Natural Gas Storage: ensuring a secure and flexible gas supply Jean-Marc Leroy GSE President Gas Coordination Group - 13 January 2010.
Introduction to Well Completions
Developing U.S. Shale Gas and Oil Resources: Problems and Prospects for the Next Decade Peter D. Blair, Executive Director NRC Division on Engineering.
Hydraulic Fracturing (Fracking)
Day 1 Session 1 Day 1Introductions Economics and accounting Building a basic project cash flow Economic and risk indicators The.
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
OFFSHORE CONSTRUCTION
Systems Model and Offshore Oil
(Additional materials)
Gas Properties & PVT Tests
Chemical additive solutions to overcome challenges and create value
INSTRUCTOR © 2017, John R. Fanchi
Presentation transcript:

Svalex 2007 August 2007 Longyearbyen, Svalbard, No

Agenda Schedule Overview of Field Development Simulation concept Learning Points CH1 Reservoir characterization CH2 Design Basis CH3 Offshore Structures CH4 Execution plan Simulation login details

Schedule Wednesday 22 August Introduction to OilSim Field Development, basics of field development Live demonstration End first part Student expectation and comments Simulation cycle 1 start, flexible deadlines Simulation cycle 2 start, flexible deadlines 18:30 Testing results, comments and suggestions Course ends

Overview Enhance your overall understanding of hydrocarbon field development Common scenario to work on Multidisciplinary challenge You are a multidisciplinary team in charge of submitting the best technical and economic proposal for a hydrocarbon field development. Your task is to find the proposals with the best net present value and the highest Knowledge points.

Simulation Concept The simulation comprises four challenges in a cycle. A cycle represents the typical steps in an offshore hydrocarbon field development CHALLENGE 1 RESERVOIR EVALUATION CHALLENGE 1 RESERVOIR EVALUATION INPUTS RESERVOIR DATA ECONOMIC DATA SITE DATA EXISTING INSTALLATIONS ETC. INPUTS RESERVOIR DATA ECONOMIC DATA SITE DATA EXISTING INSTALLATIONS ETC. CHALLENGE 2 DESIGN BASIS CHALLENGE 2 DESIGN BASIS CHALLENGE 4 PROJECT EXECUTION PLAN CHALLENGE 4 PROJECT EXECUTION PLAN CHALLENGE 3 FACILITIES AND CONCEPT SOLUTION CHALLENGE 3 FACILITIES AND CONCEPT SOLUTION RESULTS NET PRESENT VALUE KNOWLEDGE POINTS RESULTS NET PRESENT VALUE KNOWLEDGE POINTS

Simulation concept Get Challenge Analyze Surveys Submit Answers

Simulation concept CHALLENGE 1: RESERVOIR CHARACTERIZATION Study the formation and its fluids to determine production profile and drilling schedule CHALLENGE 2: DESIGN BASIS Consideration of Financial, Environment, Process and Risk Factors to set the basis for the project development CHALLENGE 3: INSTALLATION AND CONCEPT SOLUTION Evaluation of different installations and operational options to produce the hydrocarbons in place CHALLENGE 4: PROJECT EXECUTION PLAN Plan the execution of the project from drilling to start up, choosing different providers and determining the time for each milestones

Simulation concept Every time that a cycle is completed, the NPV of that proposal and the KP are calculated. Completing several cycles will allow you to consider other options and evaluate its impact. Winning team: best combination between NPV and KP

Learning points How to estimate oil in place. Surveys used for reservoir characterization. The importance of design basis. Different concept solutions and facilities used in an offshore field development, according to their technical capabilities and SHE (safety, health and environment) issues. Offshore Execution plans and providers selection.

Structure Challenge 1 ◦ Type of reservoir ◦ Porosity ◦ Permeability ◦ Pay zone ◦ Drive mechanism. Challenge 2 ◦ Site conditions ◦ Environmental conditions ◦ Financial and economics ◦ Fluid processing capacities ◦ Facilities requirements ◦ Operational strategies ◦ Recovery factor. ◦ Production Profile ◦ Drilling schedule ◦ Hydrocarbon quality ◦ Knowledge points ◦ Design constrains ◦ Knowledge points

Structure Challenge 3 ◦ Identify the concept solution ◦ Place the structures ◦ Place the sub sea systems ◦ Connect elements Challenge 4 ◦ Activities Plan ◦ Activities providers and contractors ◦ Cycle closure and technical results. ◦ Concept Solution ◦ Type of structures ◦ CAPEX investment ◦ Knowledge points ◦ Execution plan ◦ Net present value ◦ Total Knowledge points

Challenge 1 Reservoir Characterization Fill in form

Challenge 1 Reservoir Characterization Surveys Each task is explained in the glossary, to solve them you may need surveys or formulas, if any doubt arise, you should contact the facilitator and ask for extra help.

Challenge 1 Reservoir Characterization PVT ◦Pressure-Volume-Temperature (PVT) that describe the physical property and phase behaviour of a hydrocarbon mixture.  Description of phase behaviour  Identification of potential solids problems  Measurement of viscosity for fluid mobility  GOR, compressibility and shrinkage data for reservoir  Recovery estimates  Input for EOS and reservoir modelling

Challenge 1 Reservoir Characterization PVT

Challenge 1 Reservoir Characterization Porosity ◦The porosity of a rock is a measure of the storage capacity (pore volume) that is capable of holding fluids. ◦Absolute porosity ◦The effective porosity.

Challenge 1 Reservoir Characterization Porosity Porosity value Classification [%] ◦0–5 insignificant ◦5–10 poor ◦10–15 fair ◦15–20 good ◦> 20 excellent

Challenge 1 Reservoir Characterization Permeability ◦The permeability is a property that expresses the capacity of the porous medium to transmit fluids. ◦It is a dynamic variable ◦Measured in millidarcy ◦The symbol is k. ◦Greater permeability, in general, corresponds to greater porosity, but this not an absolute rule ◦Permeability is not necessarily the same in different directions. ◦In general, the horizontal permeability is greater than vertical

Challenge 1 Reservoir Characterization Permeability Permeability value Classification [mD] ◦1–10 poor ◦10–100 good ◦100–1000 excellent

Challenge 1 Reservoir Characterization Pay zone ◦The pay thickness is a portion of a reservoir that contains economically producible hydrocarbons.  To determine the height of the pay sand, well log are performed with instruments (called sondes) which are lowered down the borehole on armored electrical cable (called a wireline).  With different tools to determine several paramenters in OilSim, Gammaray and Resistivity log are the ones to be used

Challenge 1 Reservoir Characterization Pay zone

Challenge 1 Reservoir Characterization Pay zone Gamma ray log: A common and inexpensive measurement of the total natural radioactivity, measured in API units. The measurement can be made in both openhole and through casing. Shales and clays are responsible for most natural radioactivity, so the gamma ray log often is a good indicator of such rocks Resistivity log: A log of the resistivity of the formation, expressed in ohm-m. The resistivity can take a wide range of values, and, The resistivity log is fundamental in formation evaluation because hydrocarbons do not conduct electricity while all formation waters do

Challenge 1 Reservoir Characterization Drive mechanism The drive mechanism is defined as Natural forces in the reservoir that displace hydrocarbons out of the reservoir into the wellbore and up to surface. ◦Each reservoir is composed of a unique combination of geometric form, geological rock properties, fluid characteristics, and primary drive mechanism. ◦It has been observed that each drive mechanism has certain typical performance characteristics in terms of:  Ultimate recovery facto  Pressure decline rates  Gas-oil ratio  Water production

Challenge 1 Reservoir Characterization Drive mechanism

Challenge 1 Reservoir Characterization Well Completion ◦In Olsim an optimized performance analysis of the total producing system from the reservoir rock through the completion, well bore and gathering system is presented to the participants. They have the task to choose the size of the tubing to determine the most suitable well production rate.

Challenge 1 Reservoir Characterization Well Completion ◦The tubing size will affect the following among others:  Less or more production  Well intervention due to sand production  Excessive pressure drops can generate tubing failures

Challenge 1 Reservoir Characterization Secondary recovery/Injection The injection of either water or gas into the reservoir is usually referred to as secondary recovery. The aim of the secondary recovery is to balance the withdrawn fluids and in that way maintain reservoir pressure..

Challenge 1 Reservoir Characterization Secondary recovery/Injection ◦In general water flooding generates an increment in the recovery factor greater than gas injection. ◦If the formation’s permeability is low water injection rate will be low as well, so gas injection is preferred ◦If brine has to be disposed water injection will become useful to reinject it. ◦Availability and marketability of the gas have to be considered if this fluid is worth to be use in a reservoir maintenance program. ◦Gas Injector wells are usually less in quantity comparing to water injectors, but water pumping systems are cheaper than gas compression systems.

Challenge 1 Reservoir Characterization Results

Challenge 1 Reservoir Characterization Results

Challenge 1 Reservoir Characterization Results First oil: Fields are assumed to start production at the time given in the latest available execution plan. Production: fields are assumed to ramp up to plateau/peak production rapidly. First year production is calculated from when during the year the field is supposed to go on stream. Eventual later tie-backs are assumed to come on stream at the time given and to keep the plateau level until decline sets in. Plateau/peak level: Any information on plateau/peak level is used usually represent economically a % of the reserves. If no such information exists an estimate based on the production capacity of the existing production unit is made. The peak level is assumed to be constant until the decline phase sets in.

Challenge 1 Reservoir Characterization Results Decline: The decline phase sets in when prior production plus production during decline exceeds the best reserve estimate with 10 per cent. The decline is assumed to be about 20 per cent annually, and this illustrates the operators will to keep the fields at plateau levels as long as possible. Reserves : Numbers on proven plus probable reserves are used whenever the information is available. If information on oil in place is given, the most optimistic estimate of the recovery factor from the operator is used. Eventual upsides on reserves are included.

Challenge 2 Design basis

The design basis is one of the most important document in an engineer design. It will provide all necessary information to avoid misunderstanding between the technical departments involved. It will provide all the technical boundaries and capabilities for the installation design.

Challenge 2 Design basis Site conditions This data it is mainly use by process engineers to design equipments and pipelines regarding flow assurance and heat and mass transfer.

Challenge 2 Design basis Environmental conditions To define the environmental condition of the place were the development will take place, in order to choose the most suitable installation to face potential hurricane, earthquakes risk, among other factors.

Challenge 2 Design basis Environmental conditions Hurricane mapEarthquake map

Challenge 2 Design basis Environmental conditions Typhoon, after Rita hurricane After Lillie hurricana

Challenge 2 Design basis Financial and economics In this part it will be established all the premises to perform an economical evaluation of the development proposals. ◦Product for sale ◦Sales prices ◦Taxes ◦Investment incentives The surveys to be used are named Market statistics, and then you should read the newspaper from time to time to find out more data

Challenge 2 Design basis Financial and economics

Challenge 2 Design basis Financial and economics Reference sales products Brent for north sea West Texas for US Gulf The field product sales price will depend on: Market consumption API Contaminants, sulphur, asphaltene Field Location and others

Challenge 2 Design basis Fluid processing capacities and facilities Will determine the process equipment to process and conditioning the hydrocarbons. You should look at the result in ch1, and existing facilities surveys

Challenge 2 Design basis Operational strategies ◦Will determine which existing installation can be used to reduce capex (capital expenditure) ◦Will determine the country risk were the development is going to be carried out.

Challenge 3 Concept solution Choose the right installation, according to risk, and technical capabilities. Study the glossary to find hints Ask the facilitators where you can find more information about these issues

Challenge 3 Concept solution The concept solution will depend on many factors:  Environmental conditions  Operational criteria  Limited availability of construction sites.  Subjective preference of an owner/operator under certain circumstance like country risk and operational experience.

Challenge 3 Concept solution Field development options Field size, distance to existing available infrastructure or land, and seabed depth are governing factors

Challenge 3 Concept solution In a field development, the structure for use offshore are constructed as a drilling platform and will also be used as a production platform. The structure will act as a stabilizer and conditioning for the well production above the ocean floor. Flowline risers, helicopter landing pads, and mooring facilities for crew boats and supply boats are necessities that must be supported by the structure.

Challenge 3 Concept solution Fixed Platforms: ◦Sit on the sea floor. ◦They are held in place either by the total weight of the structure or by steel piles driven into the seabed and attached to the structure. ◦The group include:  jackets,  jackups,  gravity based structures,  compliant towers and its variations.

Challenge 3 Concept solution Floating systems: ◦The topsides are similar to the fix platforms, nonetheless because they are floating structures they have to be moored in place with tendons or wire ropes and chain in order to stay connected to the subsea systems below and not be drag by sea draught. ◦The group include: ◦Tension leg platforms, ◦Spar, ◦Floating production storage and off loading ships, ◦Semi submersibles platforms

Challenge 3 Concept solution m

Challenge 3 Concept solution Offshore installations capabilities

Challenge 3 Concept solution Subsea layout Example: 36 wells 9 well clusters 3 tie-back systems

Challenge 3 Concept solution Sub Sea elements

Challenge 3 Concept solution Subsea elements Export pipelines Import pipelines Hydraulic pipes Electrical and signal wires

Challenge 3 Concept solution Development option Tie Back to an existing platform: The investment is reduced using the spare capacity in the existing platform. It is a very suitable option for small developments. Offshore to beach development: In this case onshore facilities are available, multiphase production can be transported to the shore to process it. It is a good option to reduce capex when distances to shore are short. New Stand alone development: When there are no existing installation and the recoverable reserves are large or the distance to shore is too far, New stand alone development can be considered using the platform that is most suitable for the surrounding conditions.

Challenge 3 Concept solution

Process required in the platform

Challenge 3 Concept solution Process required in the platform

Challenge 3 Concept solution

Artic condition

Challenge 4 Planning the exceution Order the activities Select the right provider to accomplish your schedule Use your common sense.

Challenge 4 Planning the exceution Planning the execution You may use the common sense But.. That is the less common of the sense.

Results Is not just money you have to do the right things.