1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.

Slides:



Advertisements
Similar presentations
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Constellation Energy “The Way Energy Works” PWR Tritium Issues G. C. Jones.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Pre-Filming Method of Reducing Metal Release from Alloy 690 for SG in Primary Water of PWR 2009 ISOE Asian ALARA Symposium Aomori September 9, 2009 Sumitomo.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Objectives: Understand importance of utility and maintenance system in industry/plant.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
POWER PLANT.
ACADs (08-006) Covered Keywords BWR, main steam, piping and instrument drawing, functional operating sketch, flowpath, interrelationships, safety relief.
Nuclear Plant Systems ACADs (08-006) Covered Keywords
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
Nuclear Power What is nuclear energy? Power plants use heat to produce electricity. Nuclear energy produces electricity from heat through a process called.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.
Gas Turbine Power Plant
Can Egypt share the Construction of Power Reactors as Korea ?
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
Measures for Reduction of Radiation Exposure at Higashidori Nuclear Power Station Nuclear Power Dept. Tohoku Electric Power Co.
KINS Analysis on Occupational Exposure of Radiation Workers in Korea by KISOE 2013 ISOE International ALARA Symposium Tokyo, Japan, August, 2013.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
0 OUTLINE of OCCUPATIONAL EXPOSURE at JAPANESE NPPs in FY 2009 and the ISOE ATC Activity 2010 ISOE Asian ALARA Symposium August , 2010, Gyeongju,
0 Zinc Injection from Hot Functional Test in Tomari Unit 3 Nov MITSUBISHI HEAVY INDUSTRIES, LTD. HOKKAIDO ELECTRIC POWER CO., INC.
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
Kevin Burgee Janiqua Melton Alexander Basterash
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Nuclear Power Plant Orientation
"Congress should promote research into the next generation of nuclear plants and encourage investment in existing nuclear plants to expand a clean and.
Agenda Background Update on Fukushima Daini Update on Fukushima Dai-ichi – Summary of Events at Fukushima Dai-ichi Summary of Radiation and Reports.
Dose Rate Reduction Methods at Shimane Nuclear Power Station Tadashi Kanaoka1, Hiroyasu Kajitani1, Tsuneo Sato1, and Naoshi Usui2 1The Chugoku Electric.
Nuclear energy By Jeffrey. What is nuclear energy? It is a clean energy source. It is made when neutrons hit Uranium 235. The energy in nuclear plants.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Workshop Information IAEA Workshop City, Country XX - XX Month,
Nuclear Power Reactors
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
IAEA International Atomic Energy Agency Occupational Radiation Protection during High Exposure Operations Lecture 2-2 Lessons Learnt from Occupational.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Occupational Radiation Protection at Swedish Nuclear Power Plants: Views on Present Status and Future Challenges Ingemar Lund et al. Department of Occupational.
NUCLEAR REACTORS G. HETSRONI Emeritus Danciger Professor of Engineering Technion – Haifa – Israel.
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
Contents Regulatory Position and Utilities’ Action
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
RPM Meeting , Essen Forsmark 1 Generator output net 968 MWe Critical reactor April 23, 1980 Commercial operation December 10, 1980 Forsmark 2.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
Version 1.0, July 2015 BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies This material was prepared by the IAEA.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Generator Operation. Video of Generator synchronizing.
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
2010 ISOE Asian ALARA Symposium
OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2006
POWER PLANT THERMAL POWER STATION.
Pressurized Water Reactor
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
Comparison of Performance Indicators of Different Types of Reactors Based on the ISOE Data H. Janžekovič, M. Križman.
Occupational Exposure at Japanese Nuclear Power Plants
THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS Moustafa Aziz Nuclear and Radiological Regulatory Authority.
Presentation transcript:

1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety Organization (JNES) 2006 Asian ISOE ALARA Symposium

2 1.General Status of NPPs in Japan 2.Analysis of Exposure in FY Improvement on Inspection Way Contents

3 Nuclear Power Plants in Japan BWRPWRTotal In Operation No. of Units Output (MWe) 30,21419,36649,580 Under Construction No. of Units 112 Output (MWe) 1, ,285 On Planning No. of Units 9211 Output (MWe) 11,8693,07614,945 as of March 31, 2006

4 55 Units in Operation (PWR 23, BWR 32) as of March 31, 2006 Nuclear Power Plants in Japan

5 Trend of Capacity Factor in Japanese plants

6 Occupational Exposure in 2005 Fiscal Year (April 2005 – March 2006) PlantsUnitsPerson-Sv /Unit BWR 3244.511.39 PWR 2322.300.97 GCR 10.10 Total 5666.911.21 (LWR)

7 Individual Dose in 200 5 Fiscal Year (April 2005 – March 2006) PlantsUnitsPersons mSv /Person BWR 3244,2971.0 PWR 2321,8001.0 GCR 11,3510.1 Total 5666,3221.0

8 Trend of BWR Exposure per Unit in Japanese plants

9 Trend of PWR Exposure per Unit in Japanese plants

10 Trend of Maintenance Exposure at Japanese BWRs

11 Trend of Maintenance Exposure at Japanese PWRs

12 BWR Average Exposure per Unit by Country

13 PWR Average Exposure per Unit by Country

14 BWR Three Year Rolling Average by Plant in USA and Japan Fukushimamaiic h

15 PWR Three Year Rolling Average by Plant in USA and Japan

16 5 -year Dose Reduction Goals in USA Exposure (BWR)1.20 person-Sv (1.65) 1.20 person-Sv Exposure (PWR)0.65 person-Sv (0.76) 0.60 person-Sv Capability Factor9192 Forced Loss Rate Automatic Scram<1.0<0.5 Safety System % Unavailability 2 or 2.5 Fuel Defects00 Chemical Index Industrial Safety Accident Rate ( )2005 Quarter 3 Performance

17 Dose Rate at PLR Piping in both Japanese BWR and US BWR

18 Dose Rate at PLR Piping in both Japanese BWR and US BWR mSv/h at PLR Piping Number Median:1.55 mSv/h Median:0.89 mSv/h Japan: USA :2005.1

19 Operation Period and Maintenance Period by Country from 1994 to 2004 Operation Period (days) ◆ USA ■ Finland ▲ Korea × Japan ж Switzerland ● Belgium Maintenance Period (days) Capacity Factor 90% Capacity Factor 80%

20 Mandatory Inspection Items in Japanese BWRs System Disassembled Inspection ISI No Equipment or Components ○ 1 Category One & Three Mechanism Reactor ○ 2Main Steam Safety Valve Cooling ○ 3Main Steam Relief Safety Valve System ○ 4High Pressure Injection System Pumps & Valves ○ 5 Residual Heat Removal ( RHR) Pumps & Vaves ○ 6 Core Spray Pumps & Valves ○ 7 Low Pressure Core Spray Pumps & Valves ○ 8 High Pressure Core Spray Pumps & Valves Instrument & ○ 1 CRD Mechanism Control System ○ 2 Scram Valves of Hydraulic Control Unit Pressure ○ 1 PCV Isolation Valves Containment ○ 2 PCV Spray Pumps & Valves Vessel (PCV) ○ 3 Flammability Control System Valves Diesel Power ○ 1 Emergency Diesel Power Generator Generator ○ 2 High Pressure Core Spray DG Turbine ○ 1 * * Shall be inspected within 13months after former inspection

21 Mandatory Inspection Items in Japanese PWRs System Disassembled Inspection ISINo Equipments or Components ○ 1 Category One & Three Mechanism Reactor ○ 2 Category Three Piping in Reactor Containment Vessel Cooling ○ 3Pressurize Safety Valves System ○ 4Pressurize Relief Valves ○ 5High Pressure Injection System Pumps & Valves ○ 6Low Pressure Injection System Pumps & Valves ○ 7 Accumulator Injection System Valves ○ 8Component Cooling System Pumps ○ 9Main Steam Safety Valves ○ 10Main Steam Relief Valves ○ 11Main Steam Isolation Valves Instrument & ○ 1 Boric Acid Pumps Control System ○ ○ 1 PCV Isolation Valves PCV ○ 2 PCV Spray Pumps & Valves Diesel Power Generator ○ 1 Emergency Diesel Power Generator Turbine ○ 1

22 Improvement on Inspection Way NISA submitted the draft report “ Improvement on Inspection Way for Nuclear Facilities ” September (Utilities) Maintenance program ・ Condition-directive maintenance ・ Time-based maintenance ・ Online maintenance NISA Approval (Applied in 2008)

23 Summary Japanese plants had 1.21 person-Sv/unit in 2005 which is lower than 2004 by 0.23 person-Sv. However it is still the highest level in the world. Japanese plants do not have much source term and perform relatively more maintenance work which may increase the exposure. NISA submitted the draft report for the improvement on inspection way including maintenance program with condition-directive maintenance and online maintenance etc. It is expected that the maintenance improvement will promote to decrease the exposure in Japanese plants.

24 Thank you for your attention !!

25 Source Term Reduction Measures in Japanese BWRs Measures Applied plants Crud Reduction O 2 InjectionAll Plants Condensate Filters29/31 Improved Material (Weatherability Steel) for Condensate System 21/31 Improved Material (Low Alloy Steel) for Feed Water Heater Shells All Plants Co Reduction Improved Material ( Low Cobalt ) for Reactor Core Structures All Plants Improved Material (Low Cobalt) for Feed Water Heating System 25/31

26 Source Term Reduction Measures in Japanese PWRs Measures Applied plants Crud Reduction pH ControlAll Plants Oxidation Operation in Shutdown Stage All Plants Clean-up Feed Water Operation in Shutdown Stage All Plants Co Reduction Improved Material ( Low Cobalt ) for Reactor Core Structures 18/23 Improved Material (Low Cobalt) of Steam Generators 21/23