Joint 23 rd North America - Europe Data Exchange / 11 th Asia Pacific Satellite Data Exchange and Utilization Meetings Boulder, Colorado, 2 – 5 May 2011.

Slides:



Advertisements
Similar presentations
EUMETSAT Data Collection System
Advertisements

RARS Implementation Group – Sixth meeting Exeter RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.
RARS Implementation Group – Sixth meeting Exeter RARS Implementation Group – Sixth Meeting Exeter – 2012 Status of EARS Slide: 1.
NPP/C1/C2 Antenna Deployment Schedule (COPC ) and Reducing Product Delivery Latency and COPC ) Jim Vermeulen And Selina Nauman.
A new Network Concept for transporting and storing digital video…………
EUM/OPS/VWG/11/0498 Issue GEONETCast EUMETSAT EO Portal Product Life Cycle Slide: 1.
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
COPC Meeting at NCEP, October 2009 NOAA/NESDIS support of ESA’s ADM/Aeolus mission Lars Peter Riishojgaard Joint Center for Satellite Data Assimilation.
1 EUMETSAT SAF NETWORK Lothar Schüller, EUMETSAT SAF Network Manager.
WMO Space Programme, CBS Technical Conference1 Integrated Global Data Dissemination Service (IGDDS)
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
Slide: 15th COPS Wokshop, Stuttgart, 26 – 28 March 2007 EUMETSAT Contributions to COPS Volker Gärtner Marianne König
OSVW-VC Update Co-leads: Paul Chang (NOAA), Julia Figa-Saldaña (EUMETSAT), BS Gohil (ISRO) CEOS SIT-29 Meeting CNES, Toulouse, France 9 th -10 th April.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
ASCAT - Metop A developments, Metop B preparations & EPS-SG
1 CEOS-CGMS Working Group Climate), 5-7 March 2014, Darmstadt, Germany EUMETSAT AGENCY REPORT Jörg Schulz.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Monitoring weather and climate from space
North America - Europe Data Exchange Group May 2004 Current Status of the Eumetsat Operational and Future Satellite Systems Ken Holmlund Meteorological.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
1 EUMETSAT SAF NETWORK Lothar Schüller, EUMETSAT SAF Network Manager.
Lessons on Satellite Meteorology Part VII: Metop Introduction to Metop Instruments The sounders with focus on IASI The GRAS instrument The ASCAT scatterometer.
Slide: 1EUM/MET/VWG/09/135 5 th World Water Forum, Istanbul, Turkey, 21 March 2009 EUMETSAT Monitoring weather and climate from space Dr. Dieter Klaes,
WMO Space Programme Expert Team on WIS & GTS, Tokyo, April Integrated Global Data Dissemination Service (IGDDS)
The Satellite Meteorology Centre  The Satellite Meteorology Centre (Centre de Météorologie “Spatiale” : CMS) is established at Lannion in the Côtes d'Armor.
Slide: 1 Quality indicators in an operational precipitation product IPWG meeting 4 Beijing, October 2008 Presented by: Thomas Heinemann Meteorological.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
Slide: 1 Status of EUMETSAT services, GODAE IGST meeting, 7-9 August 2007 GODAE IGST meeting, 7-9 August 2007 Status of EUMETSAT services in respect to.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
POLAR MULTI-SENSOR AEROSOL PROPERTIES OVER LAND Michael Grzegorski, Rosemary Munro, Gabriele Poli, Andriy Holdak and Ruediger Lang.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Slide 1 Second GPS/RO Users Workshop, August , The EUMETSAT Polar System GRAS SAF and Data Products Martin B. Sorensen GRAS SAF Project Atmosphere.
EUMETSAT Geostationary Programmes
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
North-America-Europe Data Exchange, 3-5 May WMO Space Programme and IGDDS Jérôme Lafeuille WMO Space Programme World Meteorological Organization.
GRAS SAF User Workshop June GRAS Level 1 Processing and Products Juha-Pekka Luntama and Julian Wilson EUMETSAT Am Kavalleriesand 31, D
GEO Visit to EUMETSAT, 2 July MONITORING WEATHER AND CLIMATE FROM SPACE Overview of Current Satellite Operations GEO Visit – 2 July 2015.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint.
Slide: 1 xxx xxx, 23 October 2008 xxx EUMETSAT Data Access.
MSC Satellite Reception Network slides from:David Bradley additions by:Ron Goodson.
US-Europe Data Exchange Meeting May Page 1 EUMETSAT Status Report Simon Elliott EUMETSAT Operations Department
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
Interactions: atmosphere EG2234 Earth Observation.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
NOAA/NESDIS support of ESA’s ADM/Aeolus mission Lars Peter Riishojgaard Joint Center for Satellite Data Assimilation.
ECMWF Slide 1RMDCN Steering Group, 4-6 June 2008, Vienna RMDCN Requirements Tony Bakker Network and Security Section ECMWF.
CGMS 44: EUM-WP-16.ppt (May 2016) Coordination Group for Meteorological Satellites - CGMS Action closure: MTG FCI and IRS Format Presented to CGMS-44 Working.
9th June 2008 GHRSST-9, Perros-Guirec SST framework at European level Medspiration, Marine Core Services & SAF O&SI Status and products Jean-François Piollé.
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
OVERVIEW EUMETSAT Background WAN links
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
EUMETSAT’s Launch plans and Future service enhancements
SNPP Regional Retransmission Service: Plans and Status of Implementation Presented to CGMS-43 Working Group 1 session, agenda item 6.
OSVW-VC Update Co-leads: Julia Figa Saldaña - EUMETSAT
Key Updates on Existing Space Assets or Upcoming Launches - EUMETSAT
Monitoring weather and climate from space
Status of Operational AMV products at EUMETSAT
Recent update on EUMETSAT
Presentation transcript:

Joint 23 rd North America - Europe Data Exchange / 11 th Asia Pacific Satellite Data Exchange and Utilization Meetings Boulder, Colorado, 2 – 5 May 2011 EUMETSAT Operational Status Simon Elliott Meteorological Operations Division

Slide: 2 MET-9 (launched 21 Dec 2005) and located at 0°. It supports the Meteosat Prime mission. No significant anomalies to report. Mass release events expected (following Met-8 experience!) from Sept 2010, but not observed yet.   . MET-8 (launched 28 Aug 2002) and located at 9.5°E. It is a backup for Met-9 and supports RSS. No significant in-orbit anomalies to report. Last NS inclination manœver successfully performed in October MET-7 (launched 2 Sept 1997) and located at 57.5°E. It supports the full IODC service. No new in-orbit anomalies to report. It will be used in the next eclipse season as if Met-6 was no longer available. MET-6 (launched 20 Nov 1993) and located at 67.5°E. It was re-orbited in April Geostationary Spacecraft Operations

Slide: 3 During MSG-1 commissioning it was discovered that the raw images from two SEVIRI channels, although of far better quality than specified, could be further improved by changing the S/C operations and IMPF processing. A testing campaign of about three weeks was performed in Nov/Dec 2010 involving external users. The campaign was fully successful from a S/C, CF and IMPF operational perspective. The impact of the change on Image and Met Products quality is under evaluation both internally and externally by the involved NMS. STG Operations Working Group (March 2011) decided to try it first with the rapid scanning mission and then later for the full earth scanning mission. SEVIRI Water Vapour channels’ improvement

Slide: 4 Meteosat satellites’ usage in the next years

Slide: 5 MSG-3/4 (Meteosat-10/11) Ground Segment upgrade close to completion. The final activities (inclusion in the system of the 3 rd Primary Ground Station Antenna, the new release of the Central Facility and 2 nd generation Meteorological Product Extraction Facility) was completed by end of Feb Final testing campaign from until This includes a joint “Multi-Mission Elements” load test which is to be executed in coordination with the Metop-B/C (Metop-1/3) project. Final review and handover to MSG-3 Operations Preparation on MSG-3 S/C Operations Preparation started (procedures and database). 1 st MSG-3 Commissioning meeting held on MSG-3/4 Project Status

Slide: 6 Kick-off meeting of the MSG-3 LEOP on : ESOC M&C under procurement and MSG-3 mission analysis started. Kick-off meeting of the MSG-3 launch service on : The MSG-3 launch configuration includes some shock damping devices; Arianne Espace seem able to optimize the shock damping configuration to reduce its mass and increase the range of potential co-passengers. MSG-3 S/C de-storage notification given on : MSG-3 S/C preparation in two parts: Part 1 from until and Part 2 from Sept 2011 until launch. MSG-3 Launch period agreed with Arianne Espace from until MSG-3 Operations Preparation

Slide: 7 Heavy Ion Risk Assessment – Steady State Flux (NOAA) Map of radiation Steady State Flux (NOAA): Blue zone : low risk, Red zone : high risk Yellow shape : South Atlantic Anomaly

Slide: 8 Extended AHRPTswitch-ON zone: descending part of the orbit

Slide: 9 Extended AHRPTswitch-ON zone: ascending part of the orbit

Slide: Metop-A status and planning a. In orbit status incl. extension of HRPT zone

Slide: 11 EPS Routine Ground Segment Operations Operations generally running well. EUMETCast outages occurred in December 2010 (approx 3 hours) and January (25 mins) Svalbard CDA_1 over-running in Azimuth: Investigations led to cancellation of some NOAA blind-orbit support. Potential root cause and fix now identified / implemented and under observation. Hardware and operating system upgrades about to complete Quality Control Facility: upgrade nearing completion PSR and BUCC completed. Metop-B validation and ADA verification on-going

Slide: 12 EPS Product Operations Status and Planning Product (Metop-A)Current StatusFuture Status All Level 1 ProductsOperational GOME-2 v5.0Operational since 01/2011 ATOVS Level 2Operational IASI Level 2 (twt, clp, ozo)Operational IASI Level 2 (trg)Operational for CO, N 2 O IASI Level 2 (ems)Pre-operational AVHRR L2 NDVIOperational AVHRR L2 Polar WindsOperational since 01/2011 ASCAT Soil MoistureOperational IASI L1 Compressed (PC scores)Operational since 01/2011 IASI L2P SSTDemonstration 03/2011 All Level 1 NOAA- 19 products operational. ATOVS L2 products from NOAA-19 operational

Slide: 13 EPS Operations Planning 2011: –Validation of combined Metop-A/B operations (now until September) –Antarctic Data Acquisition Demonstration Service from 1 st May (9 out of 14 orbits) –Metop-B System Rehearsals after SIVVR 2012: –Metop-B Rehearsals involving external partners –Metop-B launch, commissioning and routine ops start. 2014: –ADA Operational Service Start (all orbits, one satellite).

Slide: 14 Metop-B Planning SIVVRR in Q confirmed good state of preparations for GS-2 validation start – leading to SIVVR in September Preparations starting with external partners for the SIOV. Also for the EUMETSAT Ground Segment to satellite testing (SSVTs)

Slide: 15 Antarctic Data Acquisition (ADA) Status and Planning Metop-A systematic dumping over McMurdo since December 2010 Communications at 20Mbps from McMurdo into EUMETSAT verified in January. System Verification in EUMETSAT on-going Results to date extremely promising

Slide: 16 ADA Status and Planning Losses (about 1%) being experienced in data acquisition in McMurdo Rf interference from microwave link detected, but mostly filtered out. Main problem in antenna movement and autotrack EUMETSAT system can cope with the losses, but would cause some product degradation. Impact on introduction of the ADA service is being assessed (Demonstration Service planned to go operational in May, with limited user trials from GS1 started in March).

Slide: 17 ADA System Concept McMurdo MG1 station at 77.8°S 9-10 orbits/day average in ADA Demonstration Phase (Q2 2011) All orbits expected in ADA Operational Phase (Q1 2014)

Slide: 18 ADA Performance from System Verification 65 Minutes worst case timeliness achieved for L1 data Processing of Svalbard ascending orbit dump Processing of McMurdo descending orbit dump Processing of Svalbard full orbit dump Processing of McMurdo descending orbit dump Recovery time only about one orbit after missing McMurdo dump Best case timeliness per orbit from McMurdo better than Svalbard due to fast data transfer from McMurdo

Slide: 19 NPP data availability for European users NPP and JPSS1 global and regional data to be provided Regional data will be an evolution of existing EARS/RARS service Global data will be acquired at EUMETSAT, tailored and redistributed to European users via EUMETCast and globally via the GTS (until NOAA does this) Global data required from NDE will include: o ATMS SDRs, all channels, all fields of view o CrIS SDRs, all channels, all fields of view o VIIRS cloud EDRs VIIRS cloud EDRs will be merged with CrIS SDRs in the common BUFR template until NDE can deliver these directly Details of telecoms currently being addressed

Slide: 20 Oceansat-2 user requirements (target/threshold) Data on EUMETCast: L2a ( σ grid) L2b ( grid) Data to NOAA: L1b ( σ resolution) L2a (σ grid) L2b ( grid) Timeliness : Overall: 180min / 240 min EUMETSAT part: 60min / 120min Availability : 98% / 85%

Slide: 21 Oceansat-2 contribution - DRAPSO Based on the user requirements and the constraints, a dataflow scheme was developed in co-operation with ISRO and NOAA. The Data Routing and Alternative Processing System for Oceansat-2 (DRAPSO) represents the EUMETSAT contribution to this Oceansat-2 NRT system

Slide: 22 DRAPSO processing modes Nominal mode – Raw data are transferred from Svalbard to Shadnagar, India – Processing to L1 and L2 in Shadnagar – Transfer of products via Svalbard to EUMETSAT, Darmstadt – Dissemination via EUMETCast and to NOAA Alternative mode – Raw data are transferred from Svalbard to EUMETSAT – Processing to L1 and L2 in Darmstadt – Dissemination via EUMETCast and to NOAA Switch between modes is done on the basis of data availability at Svalbard and controlled by ISRO. The processing mode is transparent for the users.

Slide: 23 L1b 418 SVB Firewall SVB Firewall L2a 84 L2b 1.6 ISRO DEG NOAA EXGATE EUM Proc. EUM Proc. EUM Rout. EUM Rout. EUMETC AST raw 240~ 90 OSI-SAF L2a &1b & L2b L2a & L2b & L1b or raw ISRO /SAN Processing KSAT/SVB reception ISRO archiving Raw data Darmstadt L2a & L2b Products Compressed Product tar–file 220MB auxiliary

Slide: 24 Status: Data Routing ISRO ISRO/K-SAT: NRSC (Shadnagar) processing system ready (Oct 2010). Data Exchange Gateway (DEG) Svalbard active (Dec 2010). Link Svalbard-Shadnagar in place (01/01/2011). Reception of orbits SVB/TRO scheduled regularly (15/1/2011). Stabilisation of data transfer to EUMETSAT solving problems on data format, file naming, and timeliness (15/2/2011)

Slide: 25 Status: Data Routing EUMETSAT EUMETSAT: Hardware for routing/processing server available (Nov 2010). Tunnel on GEANT link (SVB-EUM) and connection to ISRO-DEG ready (Dec 2010). Installation of EFTS, GEMS, seg. software on server (Dec 2010). Enabling workaround for ftp incompatibility (Feb 2011) Start of EUMETCast test dissemination to ISRO, KNMI, ECMWF (3/3/2011) Preliminary ftp-dissemination to NOAA (14/3/2011)

Slide: 26 Coverage and Timeliness, early and late February Timeliness < 180 min Timeliness > 180 min and < 240 min Timeliness > 240 min 11/2/201115/2/2011

Slide: 27 Development of timeliness during Feb. 2011

Slide: 28 Data verification Data Availability: orbits received per day since 15/2/2011 (outage 10-14/3/2011) Data timeliness: For 9-14 orbits per day (~85% of data) ~135 minutes, for the playback orbits (received at Shadnagar) considerably worse. Data contents: All data sets readable since 10/2/2011, except during recovery from outage (14/3/2011), geo-location consistent, data values plausible Quality monitoring of L2a and L2b to be done by OSI-SAF Validation/monitoring of L1b to be done by NOAA

Slide: 29 OSCAT winds from ISRO L2b product, 15/02/ Wind speed [m/s]

Slide: 30 Wind speed [m/s] ASCAT winds from OSI-SAF product, 15/02/2011

Slide: 31 End-to-end timeliness of L2a segments, March 2011

Slide: 32 Status: Alternative Processing Raw data from Svalbard were received for several days (Jan 2011) Auxiliary data are received regularly from Svalbard (Jan 2011) Hardware, including the implementation of a mandatory workstation was prepared for the processing system (Jan 2010). Pilot installation of ISRO processing software packages took place on development environment and DRAPSO server (11/2/2011). Data processing, raw → L0 (ADP software) and L0 → L1 → L2 (DP software) works, patch for automated triggering received (10/3/2011), clarification on forecast frequency pending.

Slide: 33 Measured timeliness routing/processing mode Routing modeProcessing mode Orbit:100 minutes Raw data transfer SVB → SAN:1 minute Raw data transfer SVB → EUM:3 minutes Processing SAN raw → L2:25 minutes Processing EUM raw → L2:10 minutes Product transfer SAN → SVB:2 minutes Product transfer SVB → EUM:6 minutes Product segmentation/routing:2 minutes Dissemination (EUMETCast):7 minutes Total:143 minutes122 minutes

Slide: 34 Open issues ftp application level incompatibility (currently workaround in place) Clarification on required forecast data for processing user information process product versioning:  Technical update process  Version numbering in data  User information  Test/parallel data delivery Finalising monitoring and reporting Enable alternative processing system (requires additional testing, especially for ADP software and forecast handling) Documentation of ADP software (requirements for monitoring under preparation) Validation report by OSI/NWP-SAF Start trial dissemination Agree Joint Operations Rules and Procedures (JORP/OICD)

Slide: 35 EUMETSAT Conditions to declare product operational Product fulfils user requirements on availability, timeliness and quality: Monitoring and verification report by EUMETSAT Product verification and validation reports by users (ISRO, SAFs, NOAA...) Joint Procedures co-signed and available to all parties All interface documents available (data and operations) Processing chain has operational standard: Redundancy of all processing and monitoring components All procedures in place (including failover and change procedures) All components and procedures tested Training of controllers and on-call support took place

Slide: 36 North American source (eg RARS) Simplified North America / Europe data flow MeteoFrance internet NOAA link direct reception internet mid-term EARS network GTS link NESDIS link chaos

Slide: 37 North American source (eg RARS) Data grooming European users (NMHS) European users (research) European user (xxx) EXGATE EUMETCast GTS/RMDCN Potential North America to Europe data flow order