OData Technical Committee Kick-off July 26, 2012.

Slides:



Advertisements
Similar presentations
ASTM OFFICERS CONFERENCE SUBCOMMITTEE CHAIRMENS DUTIES AND RESPONSIBILITIES.
Advertisements

ASTM Officers Training Workshop Subcommittee Chairmens Duties And Responsibilities September 11-12, 2006 Joe KouryChristi Sierk.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012.
PbD-SE Technical Committee First Meeting December 05, 2012.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
Course Outline Process Overview for Course Convenors.
OASIS document rules Nigel Shaw Eurostep Limited.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda January 6, :00 – 10:00 AM PST.
TOSCA Technical Committee Kick-off December 12, 2011.
Proposed TOSCA TC Timeline March 1, TC Deliverables Standards Track Work Products – “…is a Work Product produced and approved by a TC in accordance.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Public Review Committee Linda Sullivan-Colglazier Assistant Attorney General July 28, 2011.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
ARIP Technical Committee Convener Call 07 April
PROMCODE Technical Committee Convener Call 14 February
Chris Albrecht Legal Counsel JGC Leadership Training
TOSCA Technical Committee Kick-off December 12, 2011.
TAB Report to Board 31 July Completed Work 2014 “Keyword Guidelines for OASIS Specifications and Standards” Systematic review of all 1 st PRs +
Revised TOSCA TC Timeline Analysis and Candidate September 20, 2012.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
OData Technical Committee Convener Call June 5, 2012.
Agenda & OASIS Procedures
Doc.: IEEE /0287r2 Submission January 2006 Adrian Stephens, Intel Corporation TGn Editor Candidate – Adrian Stephens Notice: This document has.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
Note At the 2008/03/12 TC meeting the BPEL4People TC formally adopted the SCA TC issue process for issue resolution. The following slides document v3 of.
Domain Champion Updates New Mexico Department of Health.
For TC Handbook Subcommittee Chairs and Members January 24, 2016 Suzanne LeViseur Chris Ahne Training Leader Handbook Committee Chair Heather Kennedy Handbook.
Hosting Elections for Parent Organizations Family and Community Engagement (FACE) Department Jorge Luis Arredondo, Ed.D. Assistant Superintendent of FACE.
Contents Major issue states and transitions Tools.
Company Confidential Americas Aerospace Quality Standards Committee (AAQSC) Private Web Based on SAE Standard Works September 28, 2015 The.
Legal Citation Markup TC Inaugural Meeting 12 February /12/14OASIS Presentation to LegalCiteM TC.
OASIS VIRTIO TC Inaugural Meeting 30 July /04/13 OASIS Presentation to PKCS 11 TC TC Process Overview TC Process is created by OASIS Board, carried.
OASIS Overview TC Process & Administration
SCC P2P – Collaboration Made Easy Contract Management training
eIRB Training IRB Committee Members
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
CTI STIX SC Monthly Meeting
Global Grid Forum GridForge
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda June 20, :00 – 9:30 AM PDT.
OCPP TC Inaugural Meeting 07 September 2016
Proposed TC Issues Process
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
SARIF TC Timeline Proposed, approximate.
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
TC Process Specification Flow
OSLC Domains TC Inaugural Meeting 30 September 2016
ARIP TC Inaugural Meeting 22 May 2015
OASIS Overview TC Process
CTI TC Inaugural Meeting 18 June 2015
Legal Citation Markup TC Inaugural Meeting 12 February 2014
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
IBOPS TC Inaugural Meeting 23 September 2014
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
SPE Gulf Coast Section Annual Kickoff Meeting 16th August 2019
Presentation transcript:

OData Technical Committee Kick-off July 26, 2012

Agenda TC Process Overview Recommendations for Spec Editing 07/26/2012OASIS Presentation to OData TC2

TC Process Overview TC Process is created by OASIS Board, carried out by TC Adminstration Job of TC Administration  Support activities of OASIS members  Turn TC Process guidelines into practical rules  Communicate procedures & best practices to TCs  Represent TC interests to Board  Improve tools & support for members  Recommend improvements to process itself 07/26/2012OASIS Presentation to OData TC4

Work Product Lifecycle Your work products will progress through the following stages for a Standards Track Work Product: 1. Working draft (no official standing) 2. Committee Specification Draft 3. Committee Specification Public Review Draft 4. Committee Specification 5. Candidate OASIS Standard 6. OASIS Standard 7. Approved Errata 07/26/2012OASIS Presentation to OData TC5

Work Product Lifecycle Stages for a Non-Standards Track Work Product: 1. Working draft (no official standing) 2. Committee Note Draft 3. Committee Note Non-Standards Track Work Products are non- normative and are not implemented – educational papers, marketing collateral, etc. Administrative documents (meeting minutes, etc.) must be maintained on OASIS-provided systems 07/26/2012OASIS Presentation to OData TC6

Work Product Lifecycle 07/26/2012OASIS Presentation to OData TC7

Making contributions TC members may contribute existing or new work to the TC for consideration in its work TC is under no obligation to do anything with it Contribution only gives OASIS non-exclusive right to use and republish. Full rights remain with the contributor Process is simple: Load contribution to TC’s document repository Send to the TC mailing list announcing the contribution and including a link to the uploaded file 07/26/2012OASIS Presentation to OData TC8

Contacts with TC Admin ActivityTimeframeTCA Interactions Working DraftUp to TCRequest WD template Approve Committee Spec / Note Draft Up to TCRequest CSD/CND upload (optional) Public ReviewCSD: 30 days 1 st / 15 days subsequent CND: 15 days Request public review Approve Committee Specification / Note After final public reviewRequest Special Majority ballot Upload & announce CS Approve Candidate OASIS Standard After Committee SpecificationRequest Special Majority ballot Public review60 daysAnnounce results Membership voteAfter public reviewLaunch membership ballot OASIS StandardAfter successful ballotUpload & announce OS 07/26/2012OASIS Presentation to OData TC9

TC Process Overview Some other things to keep in mind: TCs run on Roberts Rules of Order, including its requirements for quorum To vote, you must maintain meeting attendance Gain rights at first meeting or after attending two consecutive meetings Lose rights by missing two consecutive meetings unless during a leave of absence 07/26/2012OASIS Presentation to OData TC10

Starting a Working Draft Except for custom publishing systems, working drafts are done in either.doc or.odt formats First step is to request a starter document / template from TC Admin Captures all metadata TC Admin determines the file names and URLs Ensures that TC Admin can handle publishing your work expeditiously Request ticket is at open.org/resources/tc-admin-requests/work-product- registration-template-request 07/26/2012OASIS Presentation to OData TC12

Managing Your Working Draft The first draft will be labeled Working Draft 01 in the starter document and –wd01 on the filename Each revision should be incremented (e.g. 02, 03) Working drafts should be stored in the TC’s document repository If your spec contains multiple files (e.g. wsdls, schemas) all the content should be zipped into a single file and loaded into Kavi 07/26/2012OASIS Presentation to OData TC13

Managing Your Working Draft Use only alphanumeric characters, period and hyphen in filenames. Do not use underscore or any other punctuation characters Review the Naming Directives at open.org/specGuidelines/ndr/namingDirectives.html for other considerationshttp://docs.oasis- open.org/specGuidelines/ndr/namingDirectives.html Feel free to consult with TC Admin on how best to organize your specification and its components 07/26/2012OASIS Presentation to OData TC14

General Notes Do not change the styles defined in the template. Doing so can cause problems when TC Admin prepares to publish your specification Links to other components should be relative to the specification document’s location TC Admin will prepare PDF and HTML Graphics are best prepared in a separate product and linked into the draft as JPGs or PNGs If your spec will have multiple parts, consult with TC Admin on naming and organization 07/26/2012OASIS Presentation to OData TC15

Approving a Working Draft Make sure required sections are in the specification Normative & non-normative references sections Acknowledgements section Conformance section (if going to public review) Separate plain-text files for any normative computer code files included in the document Combine all components that are part of the Draft (e.g. narrative files, schemas, examples) into a ZIP file and load the file to the TC’s document repository 07/26/2012OASIS Presentation to OData TC16

Approving a Working Draft Vote can be by motion in a regular meeting or by electronic ballot If by motion, make sure the motion language and vote is recorded in the meeting minutes If by e-ballot, must run minimum 7 days Motion language must include name and version number of the work product and the link to the ZIP file After approval, enter appropriate tickets for TC Admin using the same ZIP file link 07/26/2012OASIS Presentation to OData TC17

Approving a Working Draft Approvals may not be contingent on “final edits” or other changes The file the TC approves must be the same as the file linked in the TC Admin ticket 07/26/2012OASIS Presentation to OData TC18

Managing Public Reviews Comments may only be accepted via the TC’s – mailing list. No other inputs can be accepted Chairs should subscribe to list. TC should designate someone to subscribe and manage comments All comments must be acknowledged. All comments must be tracked and a log maintained of all comments and the TC’s decisions on their resolutions 07/26/2012OASIS Presentation to OData TC19

Resources for the TC TC Administration home page - open.org/resources/tcadmin open.org/resources/tcadmin Provides links to documentation, forms and updates on TC Admin work queue TC Process interactive flow chart - open.org/sites/ open.org/sites/ Provides Gantt chart of process steps with links to documentation and forms 07/26/2012OASIS Presentation to OData TC20

Resources for the TC TC Admin support request forms - open.org/resources/tc-admin-requests open.org/resources/tc-admin-requests Used to submit requests for TC Admin actions e.g. starting a public review OASIS TC Process - process process Basic policy document on which all rules and procedures are based Naming Directives - open.org/specGuidelines/ndr/namingDirectives.html open.org/specGuidelines/ndr/namingDirectives.html Rules for constructing filenames, etc. 07/26/2012OASIS Presentation to OData TC21

Resources for the TC TC Admin How-To Guide - open.org/resources/tcadmin/tc-process-how-to-guide-introduction open.org/resources/tcadmin/tc-process-how-to-guide-introduction Instructions on how to work within the OASIS TC Process with links to additional documentation, forms, etc. TC Admin JIRA work queue - open.org/issues/secure/IssueNavigator.jspa?reset=true&pid=10010&priority=3&resolutio n=-1 open.org/issues/secure/IssueNavigator.jspa?reset=true&pid=10010&priority=3&resolutio n=-1 List of open support request tickets that TC Admin is processing 07/26/2012OASIS Presentation to OData TC22

07/26/2012OASIS Presentation to OData TC23