GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.

Slides:



Advertisements
Similar presentations
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Advertisements

Test plans. Test Plans A test plan states: What the items to be tested are At what level they will be tested What sequence they are to be tested in How.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
THE NEW FSA Florida Standards Assessment Dr. Karen Schafer Brevard Public Schools July, 2014.
Process, Communication, and Certification Padma Venkata
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
CS & ECE Senior Design Project Winter 2008 Karen Davis Chia Han Altan Ferendeci.
1 CMPT 275 Software Engineering Requirements Analysis Process Janice Regan,
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
The BIM Project Execution Planning Procedure
GROSSMONT-CUYAMACA COMMUNITY COLLEGE DISTRICT PROGRAM MANAGEMENT REPORT August 20, 2013 FIRST 80 DAYS.
Introduction to Interactive Media 02. The Interactive Media Development Process.
S/W Project Management
Software Configuration Management
Preparing Written Reports Effective Communication in Chemical Engineering Freshman Design.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Software System Engineering: A tutorial
Planning and Writing Your Documents Chapter 6. Start of the Project Start the project by knowing the software you will write about, but you should try.
Introduction to Interactive Media The Interactive Media Development Process.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
TOOL SELECTION ACTIVITY POSTED ON D2L FOR STUDENTS PM 440 – Project A Mayowa Teriba Anusha Ravulapati Aileen Laughlin.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
3/17/2008AMATS: Anchorage Metropolitan Transportation Solutions AMATS Air Quality Advisory Committee Informational Update March18, 2008.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
August 2005 TMCOps TMC Operator Requirements and Position Descriptions Phase 2 Interactive Tool Project Presentation.
M ONITOR & C ONTROL Focus is on Integrated Change Control 1.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Microsoft Project Reporting with Reporting Services.
MSE Presentation 1 Lakshmikanth Ganti
Task 2.1: Software Specifications Markus Kissler-Patig.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Advancing Government through Collaboration, Education and Action Website Release Plan Presented to: Website Advisory Committee September 10, 2014.
Requirements Management Overview NIGMS Software Development.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Middle Fork Project Relicensing Process Plan April 25, 2006.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Overview of the Web Development Process.  Website Strategic Plan (Planning)  Content and Site Architecture (Planning)  Website Strawman (Planning)
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Scale and Scope of Highway Safety Manual Implementation in the Project Development Process For the Federal Highway Administration (FHWA) By Science Applications.
NAVSEA Liaison Scott Huseth Faculty Advisor Dr. Jiang Guo Team Members Areg Abcarians David Ballardo Niteen Borge Daniel Flores Constance Jiang June 3,
Systems Development Process and Methodologies Dr. T. Ravichandran.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Software Project Configuration Management
Systems Analysis and Design in a Changing World, 4th Edition
Testing Process Roman Yagodka ISS Test Leader.
CMGT 410 NEW Become Exceptional/ newtonhelp.com. CMGT 410 All Assignments (New Syllabus) For more course tutorials visit CMGT 410 Assignment.
New Alma Customer Onboarding Preparation and Best Practices
Introduction to Projects
Enterprise Program Management Office
Presentation to Project Certification Committee, DoIT August 24, 2008
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Validation procedure Nat. Secretariat and MSG
Presentation transcript:

GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J. Folds

GTRInewFormat.ppt-2 Electronic Systems Laboratory Disclaimer Georgia Tech is not yet under contract to UMTRI for this task Remaining issues are administrative – we expect them to be resolved quickly Some planned kickoff meeting items will be provided after the contract is in place Draft project fact sheet Project management data

GTRInewFormat.ppt-3 Electronic Systems Laboratory Overall Technical Approach Conduct intensive review of Phase 1 material Determine what Phase 1 material to include in software tool Identify gaps in Phase 1 material, and develop material necessary for tool support Define functional requirements for interactive tool Software capabilities User interface features

GTRInewFormat.ppt-4 Electronic Systems Laboratory Overall Technical Approach Determine software architecture and requirements Platform requirements Software standards Configuration management Software design, development, and testing Develop preliminary tool design and prototypes Finalize design Develop software Perform software testing

GTRInewFormat.ppt-5 Electronic Systems Laboratory Overall Technical Approach Usability testing of tool Develop a usability test plan Perform usability testing Develop usability test report with recommendations for modifications Finalize interactive tool Documentation Outreach material Technical support

GTRInewFormat.ppt-6 Electronic Systems Laboratory Project Schedule Phase 1 review – Day 45 Functional Requirements Document – Day 75 Software Architecture and Software Requirements Documents – Day 120 Usability Test Plan – Day 120 Preliminary design and prototypes – Day 150

GTRInewFormat.ppt-7 Electronic Systems Laboratory Project Schedule Software Test Plan – Day 180 Detailed Design Document – Day 210 User Quick Reference Guide – Day 250 Ready for testing software – Day 280 Phase 1 revision material – Day 320

GTRInewFormat.ppt-8 Electronic Systems Laboratory Project Schedule Summary project report – Day 340 Usability Test Report – Day 360 Final tool – Day 400 Detailed plan available in Microsoft Project

GTRInewFormat.ppt-9 Electronic Systems Laboratory Staffing Plan Dr. Dennis J. Folds – Task Order Lead Dana Stocks – Software Development Lead Jerry B. Ray, Jr. – User Interface Design Lead; will also develop prototype tool Tonya M. Whaley – Usability Testing Coordinator Above personnel were all involved in the TMC simulator project and the ErgoTMC website

GTRInewFormat.ppt-10 Electronic Systems Laboratory Plan for Tracking Comments Use of change tracking in Microsoft Word Will provide electronic versions of revised deliverables so that reviewer can see revisions Will provide summary documentation of responses to comments in table format in the transmittal letter for the revised deliverable

GTRInewFormat.ppt-11 Electronic Systems Laboratory Plan for Stakeholder Involvement Expect project advisory board to consist of TMC managers (will also participate in usability testing task) Contractor personnel experienced in TMC operations Individuals directly involved with development of Phase 1 material Other individuals named by FHWA

GTRInewFormat.ppt-12 Electronic Systems Laboratory Plan for Project Outreach Project presentation Issues/challenges in current practice Purpose of project Outcome and findings Products developed Intended audiences Project fact sheet (draft to be provided)

GTRInewFormat.ppt-13 Electronic Systems Laboratory Mechanisms for Technical Interchange Teleconference Calls (monthly?) Net Meetings (quarterly?) VTC (?) if all parties have access One major TIM at TFHRC