AMRDEC Technology As It Pertains To the Global War on Terror 39th Annual Gun & Ammunition / Missiles & Rockets Conference & Exhibition Jason Gilliam US.

Slides:



Advertisements
Similar presentations
Advanced Hypersonic Weapon Flight Test Overview to the Space & Missile Defense Conference 14 August 2012 Ms. Debra G. Wymer Director, Technical Center.
Advertisements

Large Aircraft Survivability Initiative (LASI) Programmatic Overview Briefing for the: 4 th Triennial Aircraft Fire & Cabin Safety International Research.
MILITARY AIRCRAFT SYSTEMS
A History of the M72 LAW and Current Improvement Programs
ANTI-ARMOR SYSTEMS For the next 45 minutes we will review systems and capabilities of the Mechanized Infantry and Armor Company. T: AGENDA.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
25mm Gun System for the F-35 Joint Strike Fighter (JSF) Presented by: Dave Maher Project Engineer – Joint Strike Fighter Gun System General Dynamics Armament.
Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001 Air Armament Center Lethal Strike JPO Eglin Air Force Base,
OICW System Enhancements STO III.WP Specific Goal: Design, Build and Demonstrate Prototype Micro-Electro Mechanical Systems (MEMS) based Safe &
Air Armament Symposium
Tomahawk Cruise Missile
Weapons Familiarization
Military Aircraft Systems
The 2006 Naval S&T Partnership Conference is presented by NDIA with technical support from ONR Naval EM Railgun Innovative Naval Prototype 3 August 2006.
MILITARY AIRCRAFT SYSTEMS
Moody F061 ISE Conceptual System Design “Sets the Stage” State the problem Identify the need Conduct advanced system planning & feasibility analysis.
ICBM Systems Directorate Minuteman III
WILLIAM S. CHEN Bill Chen joined United Defense on December 16, He is currently Vice President, Division Engineering, Armament Systems Division,
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Future nuclear weapon policies James M. Acton
UNCLASSIFIED March 10, 2011 Rapid Acquisition OSD CAPE Cost Assessment and Program Evaluation.
MILITARY AIRCRAFT SYSTEMS
Safety, Reliability & Performance of the Ahead (ABM) Programmable Fuze System NDIA 39th Annual Gun & Ammunition Baltimore, MD Apr , 2004 Presented.
Guns and Ammunition Conference Low Cost Solutions for Modern Munitions
Precision Strike Association Deputy Product Manager for Excalibur
JAVELIN.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
Strike Warfare MIDN 3/C Draper and MIDN 4/C Hollis.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Weapons Familiarization
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
Precision Effects v. Precision Munitions
“America’s Most Deployed
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
UNCLASSIFIED 1 DAU Acquisition Community Symposium April 15, 2008 Joint Attack Munition Systems (JAMS) Project Office improving support to the War fighter.
ADVANCED PLANNING BRIEFING TO INDUSTRY
Precision Strike Association Annual Programs Review 20 April 2005 LtGen Michael A. Hough Deputy Commandant for Aviation.
NDIA, Slide NDIA, Slide 2 Outline Current M151/M423 Performance & Deficiencies APKWS Warhead & Fuze Development Program –Technology.
Sustainability/Logistics – Transportation and Distribution Management (4b) Technology Enabled Capability Demonstration Alan Santucci
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
6/5/2016 PEO Aircraft Carriers Aerosol Can Evacuation & Compaction Unit SBIR Topic N
Projectile Kinetic Energy Reduction System (PKERS)
AMC Committed To Excellence ALACV PROGRAM ALACV Airburst Demonstration Fuze For 40mm Cannon Caliber Ammunition Fred Herr US Army ARDEC Mark Tomes Alliant.
Presented To: Precision Strike Association Annual Programs Review Presented To: Precision Strike Association Annual Programs Review Presented By: LTC Bill.
KINETIC INITIATED CORE MUNITIONS (KICM™) 0.50 Caliber
FIELD ARTILLERY WEAPONS BREIF
MIDN 4/C Coleman and MIDN 4/C Thompson-James
GP ppt 42 nd Annual NDIA Targets, UAVs and Range Operations Symposium & Exhibition 17 November, 2004 Presented by:Ken Braucksick MA-31 Program.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
Insensitive Munitions S&T Roadmap Robert Maline
S40mm APFSDS-T & HEAB-T Development 39th Gun and Ammunition Conference
39th Gun & Ammunition Symposium
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
13 May 2003 PROGRAM EXECUTIVE OFFICE, SPECIAL PROGRAMS SPECIAL OPERATIONS ACQUISITION AND LOGISTICS CENTER JOINT SERVICE SMALL ARMS PROGRAM (JSSAP) National.
Chapter 3 Conceptual System Design
Smart Bombs – Precision Guided Weapons
CJ II - Introduction to Ballistics & Handgun Nomenclature By Mr. Fletcher Criminal Justice I & II.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
GORT Planning/Guidance Session with LTG Barclay
Thermobaric (TB) ACTD Breakfast Club Approval Briefing
PF-0009a.
Name of the idea Description and Military Application Maturity
Name of the idea Description and Military Application Maturity
Force Packaging.
Agenda Overview Tactical Employment ATK 25mm Barrett HEDP System
Air Armament Center (AAC)
Lockheed Martin Canada’s SMB Mentoring Program
Air Armament Symposium
“US Army Precision Fires”
25mm Gun System for the F-35 Joint Strike Fighter (JSF)
Presentation transcript:

AMRDEC Technology As It Pertains To the Global War on Terror 39th Annual Gun & Ammunition / Missiles & Rockets Conference & Exhibition Jason Gilliam US ARMY AMRDEC Systems & Warheads

Introduction Hellfire Mod-K Program Advanced Precision Kill Weapon System (APKWS) TOW Bunker Buster Hellfire Mod-K Program Advanced Precision Kill Weapon System (APKWS) TOW Bunker Buster AMRDEC Support of Global War on Terror

HELLFIRE Mod-K Objective:Develop a Fragmentation Sleeve for Hellfire II Missile to Meet Urgent Operational Necessity Successful Fielding Resulted in Continuing Requests Development Concept –External Modification to Current Fielded Missile System –Ability to Modify Missiles and Containers in Field Locations –Minimize Logistics Impact –Ability to Ship Modified Missiles –Field in Four Months

Purpose of the Program Add An Anti-Personnel / Anti-Material Capability for Hellfire Missile System –Optimize Fragment Lethality Against Broad Range of Targets –Minimize Shaped Charge Performance Degradation –Meet Urgent Operational Necessity –Mission Capable – Limited Qualification

Elements of Design Sleeve Design –Attachment / Hinge –Fragment Size and Material –Internal Scoring –Adhesive –Missile Integration Adapt Shipping Container to Accommodate Missile Sleeve

Mod-K Fragment Sleeve Comparison of Baseline Missile & Steel Sleeve Fragmentation Baseline Hellfire II

Mod-K Fragment Sleeve Comparison of Baseline Missile & Steel Sleeve Fragmentation Baseline Hellfire II

SUV Door Penetration Multiple External Perforations Several Internal Perforations

Flight Test Results No Launch Rail Interference Aerodynamics Proven Flight Stability Proven Hit Accuracy Not Compromised

Mod-K Conclusions Significant Increase in Number of Lethal Fragments Provides Capability Against Personnel and Light Vehicle Targets Sleeve Design Has Minimal Effect on RHA Penetration Fragment Sleeve Expands the Role of HF Missile for Targets of Opportunity

Block I: Precision Guidance for 2.75” rockets Block II: Warhead & Fuze Development

Develop, flight demonstrate, and integrate onto the AH-64 APACHE a low cost, accurate 2.75 inch guided rocket that provides a standoff range surgical strike capability against specified soft point targets. Supports APKWS SDD Start Provides precision strike capability to HYDRA-70 rockets MNS APPROVED 02/96 ORD APPROVED 03/00 Hydra-70 range HELLFIRE-like accuracy Reduced fratricide Enhanced survivability Reduced cost/kill Increased stowed kills Reduced collateral damage Minimize platform mods Current logistics (1-6Km) (~1m) (accuracy) (standoff) (2x to 4x) (4x to 20x) (>2x) (screw-on kit) Requirements Summary BLOCK I OBJECTIVES

Expanded Target Set Truck MANPADS MOUT / N on -H ardened F ield S tructures IFV

TECHNICAL APPROACH Semi-Active Laser (SAL) Lock On After Launch (LOAL) Engagement of individual targets with high probability of single shot hit requires terminal or command to line-of-sight guidance. Low signature targets embedded in complex, cluttered environments can only be reliably engaged through visual acquisition & operator designation. Semi-Active Laser (SAL) Lock On After Launch (LOAL) Engagement of individual targets with high probability of single shot hit requires terminal or command to line-of-sight guidance. Low signature targets embedded in complex, cluttered environments can only be reliably engaged through visual acquisition & operator designation. M423 FuzeM151 10lb HE Warhead BASELINE HYDRA-70 ROCKET SAL Laser Seekers Inbedded in Delta Wing Guidance Section MK66 Mod IV Rocket Motor Provides precision strike capability to HYDRA-70 rockets

Proposed APKWS Block II Objectives Insensitive Munition Compliance Is Main Focus Improved Warhead and Fuze Lethality Improved MIL-STD 1316 Fuze Program Ends in FY05 with TRL 6 Prototype Designs and Supporting Test Data Low Risk Transition to APKWS Block II SDD in FY06 Insensitive Munition Compliance Is Main Focus Improved Warhead and Fuze Lethality Improved MIL-STD 1316 Fuze Program Ends in FY05 with TRL 6 Prototype Designs and Supporting Test Data Low Risk Transition to APKWS Block II SDD in FY06 Integrate Technologies to Replace the Current M151 and M423

M151 Warhead Description Point Detonating Fuze Comp B Explosive Cast Iron Current Design Designed 40 Years Ago 65% of Fragments less than 5 grains Narrow Spray of Fragments Impact Fuze Potential Improvements Improved Fragmentation More Efficient Case Shape Enhance Blast Explosives Delay Fuzing for MOUT Targets

Least Efficient Most Efficient Least Cost Most Cost Fragmentation Technology Efficient Mass/Energy Optimized Lethality, More Cost Efficient Mass/Energy Optimized Lethality, More Cost Less Wasted Mass/Energy Improved Lethality, Low Cost Less Wasted Mass/Energy Improved Lethality, Low Cost Wasted Mass/Energy Preformed Fragmentation Embossed Fragmentation Natural Fragmentation Tungsten fragments Pearson or V-Notch Scoring M151 Warhead Optimization Balances Cost and Performance

Effects of Enhanced Blast We Want to Manage the Energy Release of the Explosive in Order to Maximize the Blast Impulse and Temperature Flux Many Structures Survive High Load, Short Duration, Blast Pressures Increased Impulse (Pressure Over Time) Causes Greater Damage

Features of the APKWS Block II Fuze Integrated Development With Block II Warhead Meet Applicable Safety Standards (i.e., Dual Safe) Fuze May Include These Modes: Point Detonating Delay Detonating Proximity Function Integrated Development With Block II Warhead Meet Applicable Safety Standards (i.e., Dual Safe) Fuze May Include These Modes: Point Detonating Delay Detonating Proximity Function Lethality Drives the Fuze Requirement

Design for IM Enhanced Fragmentation Enhanced Blast Dual Safe Fuze Design for IM Enhanced Fragmentation Enhanced Blast Dual Safe Fuze APKWS Block II Warhead and Fuze Program Will Provide the Capability to Defeat the Current and Evolving Threat Next Step: APKWS Program Summary

Objective:Provide Stryker ATGM with capability to breach masonry walls and defeat bunkers until Mobile Gun System becomes available. TOW Bunker Buster 500 Missiles Delivered on Schedule and Within Budget Systems & Warheads Led Effort –12 Months R&D –3 Months Production Development Concept –Designed Warhead –Missile Integration/ Retrofit –Warhead and Missile Test –Hardware Fabrication –Developed TDP –Led Production Effort

TOW BB Warhead Conduit Cover Warhead, Explosive Filled Pad, Seal Plate, Seal (welded) Forward Skin Booster Pellet Delay Assy Aft Ring Insulator Ring Compression Pad S&A (M114) Insulator Disc Scuff Pads Crush Switch Assy

TOW Bunker Buster Thermobaric Variant Potential Opportunity Major Accomplishments Designed HE Bulk Charge Warhead Designed Fuze Delay Assembly Designed HE Bulk Charge Warhead Designed Fuze Delay Assembly Integration Resulted in Negligible Effects on Flight Performance Testing and Qualification Production Completed by May 03 Integration Resulted in Negligible Effects on Flight Performance Testing and Qualification Production Completed by May 03 2Q FY02 3Q FY02 4Q FY02 1Q FY03 2Q FY03 Arena #1 Arena #2 Arena #3 Arena #4 Preliminary Design Review Critical Design Review Final Design Final Design Flight Testing Qual Testing Initial Design Static/Flight Testing PRODUCTION

TOW Bunker Buster – Wall Engagement

TOW Bunker Buster – Building Engagement

TOW Bunker Buster Program Summary Quick Reaction Program - 12 Months R&D - 3 Months Limited Production at Army Depot Currently Fielded for Stryker Brigade Missiles Primary Mission to Support MOUT Wall Breaching

AMRDEC Support to Global War On Terror Expertise With Army Precision Guided Missiles Enables Quick Reaction Modifications to Support Unique and Urgent Mission Requirements Prototype and Limited Production Capability Working Relationship with All Missile Prime Contractors and Other Stakeholders

TOW Bunker Buster – Bunker Engagement