1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.

Slides:



Advertisements
Similar presentations
ISIS Accelerator Division
Advertisements

Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
March 14-15, 2007ECloud Feedback, IUCF1 Electron-Cloud Effects in Fermilab Booster K.Y. Ng Fermilab Electron-Cloud Feedback Workshop IUCF, Indiana March.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Charge Exchange injection in BNL AGS 1972: First suggested for AGS ( by A. Maschke ) 1982: Brought into operation in AGS. D.S. Barton, L. Alhrens, E. Gill,
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
By Jeffrey Eldred Data Analysis Workshop March 13th 2013 Intro to Electron Cloud: An experimental summary.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Some Initial ECloud Measurements Bob Zwaska September 23, 2009 Electron Cloud Working Group Meeting.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
Observations of electrons in the Intense Pulse Neutron Source (IPNS) Rapid Cycling Synchrotron (RCS) J. C. Dooling, F. R. Brumwell, W. S. Czyz, K.C. Harkay,
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Beam Current Monitoring with ICT and BPM Electronics
Beam dynamics requirements after LS2
Presentation transcript:

1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007

2 The Main Injector Program (Double) Batch 1 (PBar) Batch 2 Batch 3 Batch 4 Batch 5 Batch 6 Booster Main Injector Provides high power, 120 GeV proton beam  80 kW for antiproton production  180 kW for neutrino production Takes 6 or 7 batches from the 8 GeV 15 Hz  4-5 × protons per Booster batch Total cycle time ≥ 1.4 s + batches/15 NuMI

3 Main Injector Operation 53 MHz beam H= bunches  6-10 x protons/bunch Bunch length: m Transverse size : 1-5 mm Ramps 8 – 120 GeV  0.8 s ramp period Passes through transition 3-D dampers needed for operation  Resistive wall instability  No evidence of e-p Linear growth rate scaling Operation limited by fractional loss  Losses < 10%  Maximum charge is secondary

4 Upgrade Plans at Fermilab Medium term Proton Intensity upgrades  Intended for neutrino program (at first) Proton Plan (in progress, done by ~ 2008)  Use slip stacking in Main Injector to increase proton bunch intensity NOvA-ANU (planned for ~2011)  Increase cycling rate of MI by using Recycler for stacking SNuMI (early planning)  Increase proton bunch intensity by using accumulator for stacking HINS (Proton Driver, on hold)  Increase proton bunch intensity through new 8 GeV Linac

5 Evolution of Proton Intensities Early plans were to go straight from Proton Plan to HINS  Start to get big bunch intensities, and worry about electron cloud More recently, upgrade path has lengthened  First leg, using the Recycler, does not significantly increase bunch intensity  Other legs still involve some increase Miguel Furman did initial simulations of the MI w/ Proton Driver  Instigated study program at Fermilab  More calculations from LBL (other talks)

6 First Simulation Input Simulations suggested that MI might be near a threshold for electron cloud formation  4-5 orders or magnitude increase of cloud density with a doubling of bunch intensity Leads to a program of studies:  Try to find evidence of a cloud with present MI  Expand simulations  Look at secondary emission in the MI M. Furman (LBL) FERMILAB-PUB AD

7 Dynamic Pressure Rise See fast rise over the course of a cycle (1s) The control system induces delay Occurs only at location of uncoated ceramic Ion Pump Current Ceramic beam pipes Beam Intensity

8 Dynamic Rises Around the Ring Locations of vacuum rises Rises observed at ~4% of pumps

9 50 Hz Pump Higher bandwidth pump Saw more structure  Pressure increases with injections  Increases and decreases during cycle × / bunch 0.5 × / bunch Type of pump installed at two locations

10 Electron Probe Retarding Field Analyzer  Borrowed from Argonne  Installed in drift region Have a lot of interference  Magnet bus (grounds)  RF & beam signals (RF noise) Being used as an electron counter  Not biasing retarder  Filtered output current Collector Retarder

11 Cycle Measurement DC signal seen to spike at middle of cycle  Around the time of transition Rapid increase of signal occurs into acceleration  Dip occurs at transition  Maximum occurs shortly after transition  Electron count decreases toward the end of the cycle

12 Collected results Large number of cycles sampled at maximum current Clear turn-on at higher intensities Noise is bad due to amplifier/MADC system 0.2 uA ~ 1% neutralization Expect new measurements with 11-batch structure  More high intensity bunches

13 Closer look at Transition Cloud increases rapidly as size decreases Decreases temporarily at minimum bunch length  Wasn’t expected, but repeatable

14 Another look at Transition Better filtering/amplifying allow a closer look  Introduces time delay Some cloud before transition Biggest effect after  The dip definitely occurs Bunch length dependence looks complicated  Naïve expectation was that shortest bunch length gave highest electron current Perhaps due to electron energy or beam pipe geometry (Furman)

15 Secondary Emission Measurement Measured at SLAC’s facility with actual MI beam pipe (Bob Kirby) On average, electrons produced per incident 400 eV electron on MI pipe  Difference is conditioning SEY maximum is far beyond that used in simulation  POSINST needs more like for reasonable simulation results

16 Future Measurements Improve MI detector installation  Better shielded cables and grounds  Better electronics/DAQ Real-time bunch-by-bunch tune measurement  Achieved by manipulating damper system Running sums of beam oscillations Well suited for FPGA  May see coherent shifts Plan to install new detectors in Booster & RR Enameled coatings for high resistivity electrodes  Fritz Caspers idea  Looking into getting MI pipe coated and installed

17 Summary Measurements of electron cloud formation in MI  Vacuum pressure rise & Direct electron detection Suggest few % neutralization No Instabilities from electrons Dip of electron current at transition  Perhaps due to SEY/geometry effects Simulations suggest possibility of threshold  Somewhat consistent with observed turn-on  However, disconnect on SEY  Main Injector upgrades may push us past threshold However, none of the approved upgrades do so Planning to continue measurements  Test new, higher intensity beams  New instrumentation

18 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007