Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Recent Result for the STF-2 Cryomodule Operation
Areal RF Station A. Vardanyan
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
Degradation and Recovery of Cavity Performance
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
XFEL Vacuum System Commissioning
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Test plan of ESS HB elliptical cavity
High Gradient Cavities: Cost and Operational Considerations
Findings in RF Power Couplers after operation on cavities in PXFEL2
ESS RF Development at Uppsala University
World Wide Fundamental Power Coupler meeting #3
XFEL cavities and cryomodules measurements at AMTF
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
CW accelerating module test progress at DESY
Performance Degradation cERL Injector Cryomodule
High gradients in TESLA nine-cell cavities
EU-XFEL summary of performance degradation
FRIB summary of performance degradation - VTA to cryomodule
First High Power Test of the ESS Double Spoke Cavity package
Cryomodule Performance in FLASH and XFEL
Novel Accelerator and Detector Systems
ERL Director’s Review Main Linac
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL, DESY

Superconducting Accelerating Cryo-Module Tests at DESY 2 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Overview Module Test Stand CMTB Module Test Procedure Module Test Results Summary

Superconducting Accelerating Cryo-Module Tests at DESY 3 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Cryo Module Test Bench

Superconducting Accelerating Cryo-Module Tests at DESY 4 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) K shield Cavity typeTESLA Number of cavities8 Cavity length1.038 m Operating frequency1.3 GHz R/Q1036 Ω Accelerating Gradient MV/m Quality factor10 10 Q ext (input coupler)3×10 6 Operating temperature2 K LHe cooling 2K / 31mbar HERA cryoplant is used 12m 4K shield input coupler 2 phase LHe pipe He gas return pipe Module / Cryogenics

Superconducting Accelerating Cryo-Module Tests at DESY 5 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) CMTB RF System

Superconducting Accelerating Cryo-Module Tests at DESY 6 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) CMTB LLRF System

Superconducting Accelerating Cryo-Module Tests at DESY 7 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Two gamma detectors are placed near the beam line on both ends of the module (by the end-caps). Gamma detector "GUN"Gamma detector "DUMP" module Module Gamma Radiation Measurement

Superconducting Accelerating Cryo-Module Tests at DESY 8 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Coupler Common pumping line Ion Getter PumpTi Sublimation Pump Beam line TSP/IGP connected in parallel and IGP used as a vacuum gauge. Module Vacuum System

Superconducting Accelerating Cryo-Module Tests at DESY 9 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) times e- (charged particles) light in coupler vacuum light in wave guide (air side) temperature cold ceramic temperature warm ceramic vacuum coupler vacuum cavity bias voltage cryogenic OK low level RF gate on klystron all thresholds are hardware set Coupler Technical Interlock

Superconducting Accelerating Cryo-Module Tests at DESY 10 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Procedure (1)

Superconducting Accelerating Cryo-Module Tests at DESY 11 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Procedure (2)

Superconducting Accelerating Cryo-Module Tests at DESY 12 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Procedure (3)

Superconducting Accelerating Cryo-Module Tests at DESY 13 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) evaluated error margins for accelerating gradients in this test are about  %. RF Power Calibration R sh /Q=1030 , Lcavity=1.035m, Qload=3  10 6, f 0 =1.3GHz, Pfor  5kW, t fill =1300  s (for calibration, 500  s for flat-top) flat-top RF power pulse Cavities gradients for the 1.3 ms rectangular pulse RF Calibration / Test

Superconducting Accelerating Cryo-Module Tests at DESY 14 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) IGP vacuum pressure IL limit set to mbar TSP saturated C1 warm part light RF Couplers Conditioning Time

Superconducting Accelerating Cryo-Module Tests at DESY 15 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Results: PXFEL1 (1)

Superconducting Accelerating Cryo-Module Tests at DESY 16 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Flat-top pulse μs operation at 10 Hz Module Test Results: PXFEL1 (2)

Superconducting Accelerating Cryo-Module Tests at DESY 17 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) measured (CMTB)XFEL specification RF power, kW K losses, W K losses, W RF power coupler dynamic losses Module Field Emission vs Accelerating Gradient Module Test Results: PXFEL1 (3)

Superconducting Accelerating Cryo-Module Tests at DESY 18 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Results: PXFEL2 (1)

Superconducting Accelerating Cryo-Module Tests at DESY 19 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Results: PXFEL2 (2)

Superconducting Accelerating Cryo-Module Tests at DESY 20 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Results: PXFEL3 (1)

Superconducting Accelerating Cryo-Module Tests at DESY 21 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Module Test Results: PXFEL3 (2)

Superconducting Accelerating Cryo-Module Tests at DESY 22 Denis Kostin, MHF-SL, DESY. International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Summary The Cryo Module Test Bench ( CMTB ) was built at DESY to test the accelerating SRF modules and cavities independently from the FLASH operation. CMTB allows the high and low power RF tests, as well as cryogenic tests to be conducted on one SRF module. 9 SRF modules ( including one 3.9 GHz module ) tested until now at CMTB. 7 superconducting accelerating modules are used now in the FLASH LINAC at DESY. 3 modules were tested at FLASH and 4 modules were tested at CMTB facility. First three XFEL prototype modules PXFEL1,2,3 were assembled in team-work with XFEL Cold Linac Partners ( IHEP / Beijing, CEA-IRFU / Saclay, IN2P3-LAL / Orsay, INFN / Milano, CIEMAT / Madrid, DESY ) and tested at module test stand CMTB at DESY. Modules tested with equal cavity RF power distribution as well as single cavities with only one cavity on resonance at time. The cavities were tested with the flat-top RF pulse with 0.5 ms rise time and 0.8 ms flat-top. The own quality factors Q 0 measurements were done using the cryogenic losses measurement on the CMTB, modules radiation measurements done as well on the both ends of the module ( gun / dump side ). In PXFEL1 cavities gradients from 27 to 36 MV/m are reached, module operation with average gradient of 30 MV/m using tailored RF power distribution is possible. PXFEL1 is used in FLASH (ACC7). Modules PXFEL2 and 3 suffered from some cavities degradation: one cavity in PXFEL2 and two in PXFEL3 did not reach 20 MV/m.