Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
NERC New Approved Standards
Presented to PGDTF February 11, 2015
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
and Trend for Smart Grid
Xanthus Consulting International Smart Grid Cyber Security: Support from Power System SCADA and EMS Frances Cleveland
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Project 1.4 Operational Strategies and Storage Technologies to Address Barriers for Very High Penetration of DG Units in Intelligent.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Brett Wangen, Director of Engineering James O’Brien, Senior Engineer Peak Reliability CIP Guideline and Study Verification Service.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
WECC and NERC Protection Criteria and Standards
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Chapter 7 SYSTEM PROTECTION
Interconnect Protection of Dispersed Generators
Homeland Security Conference Symposium on Homeland Security & Defense Christopher Newport University May 18,
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
SafeZone® patent pending 1 Detect. Inform. Prevent. NERC Physical Security Standards and Guidelines SafeZone® Detect. Inform. Prevent.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Overcurrent Protection and Voltage Sag Coordination in Systems with Distributed Generation J. Carlos Gomez 1 M. M. Morcos 2 1 Rio Cuarto National University,
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
1 Smart Grid Cyber Security Annabelle Lee Senior Cyber Security Strategist Computer Security Division National Institute of Standards and Technology June.
CLEMSON UNIVERSITY DG CONFERENCE UPDATE ON THE CURRENT STATUS OF DG INTERCONNECTION PROTECTION WHAT IEEE 1547 DOESN’T TELL YOU ABOUT INTERCONNECTION PROTECTION.
September 25, 2012 Planning Working Group - PLWG Sub-Synchronous Resonance Protection & Mitigation John Adams Principal Engineer.
WebCast 5 May 2003 Proposed NERC Cyber Security Standard Presentation to IT Standing Committee Stuart Brindley, IMO May 26, 2003.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Steady State Analysis Of A Microgrid Connected To A Power System
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Submitted to: Submitted by:
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Power System Protective Relaying-Part One
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Transmission Planning in ERCOT- Overview
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Black Start Overview.
IG BASED WINDFARMS USING STATCOM
Interconnect Protection of Dispersed Generators
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Project WECC-0100 Update Load Modeling Task Force
SMART TRANSMISSION GRID 1. Smart Transmission System Wide application of HVDC/ FACTS Wide Area Monitoring & Protection New Technologies: Substation Automation.
POWER SYSTEM ANALYSIS INTRODUCTION.
Pacific Power Seismic Preparedness Update
Power System Protective Relaying-Part One
Review of Distribution Network Protection
Project WECC-0100 Update Load Modeling Task Force
Supplemental Project Planning Process Under Order 890 Within PJM
Presentation transcript:

Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic

Classic Power System Restoration

Distributed Generation in System Restoration Ramp-in a Distributed Generation resource – Is the DG resource capable of generation-load balance? – Is it tied to a storage device with sufficient ramp and regulation capability? Find an initial low to medium voltage path to energize Energize line and pick up load Synchronize to bulk power grid – Outline energized switching sequence path – How do I avoid false tripping of feeder breakers? Consider short circuit contributions for DG resources – Do I build upward, build downward, other variations?

The Big Picture

Reverse Flow and Grid Support

Distribution System Grid Restoration What’s the status of the radial system – How can we maximize our DER resources that meet the “black start criteria requirement”? – What is the capability of power transfer in our distribution network? – Are there any operating constraints? – How do we pick up load and maintain frequency balance?

Frequency balance - California’s Duck Curve

What is NERC CIP-014 A Critical Infrastructure Protection standard to identify and protect Transmission stations and substations, and their associated primary control centers, that if rendered inoperable or damaged as a result of a physical attack could result in widespread instability, uncontrolled separation, or Cascading within an Interconnection.

Applicability Today’s standard requires: – Any Transmission Owner that owns: Transmission Facilities 500 kV or higher. Collector bus for a generation plant is not considered a transmission facility. Instead it is a part of the generation interconnection facility Transmission Facilities operating between 200 kV and 499 kV at a single station or substation, where the station or substation is connected at 200 kV or higher to three or more other Transmission stations or substations

How may it change if we used the Distribution System for System Restoration? Functional entities would now be considered: – Distribution Owners – Generator Owners of Renewable Resources DER resources that are critical in the grid restoration process would need to go through a risk assessment evaluation – Contribution to frequency stability – Contribution to voltage stability – Applicable threat conditions on that asset – A vulnerability assessment of that asset

Risk w.r.t. CIP-014. Consider.. Event Driven Risk Indicators – Prioritize applicable events based on distribution system integrity, equipment performance, and/or engineering judgment – Consider applying a ranking methodology in association with TO’s input and CIP-014 requirements Condition Driven Indicators – Assess on a set of measurable conditions for reliability. Examples: abnormal topology, alternative generation dispatches, power transfer between systems, etc.

Threat defense mechanisms Transmission systems are planned and operated to withstand N-1 contingency conditions – Should Distribution resources be studied in the same fashion? Think of proposing a system that has the ability to defend against attacks of multiple components including bulk power transformers. Example: Attack detection tools that monitor traffic patterns simultaneously correlates events at multiple substations can help in early detection of coordinated attack scenarios.

Conclusion Consideration of Distribution System assets in system restoration efforts Advantages to doing this : – Diversification of risk to critical assets Multiple black start points – Greatly reduces vulnerability of the system to terror threats – More robust alternatives to restoring load effectively

Questions? Contact Information: – Srijib Mukherjee – – Cell: (919)