Lunar occultations Review/update on recent developments.

Slides:



Advertisements
Similar presentations
European Symposium on Occultation Projects 2013 August CosmoCaixa, Barcelona, Cataluña, Spain David W. Dunham
Advertisements

2011 IOTA Conference IOTA Annual Meeting July 16-17, 2011 Sierra College, Rocklin, California USA.
1 An Excel Report Form and Macro for Lunar Occultations Brad Timerson - USA John Talbot - NZ.
Occult status Current version – stable and reliable Current beta version – has only 3 minor fixes. Details are in the List Version Changes.
The Review of the Archive of Lunar Graze Observations Presented at Trans Tasman Symposium on Occultations - 4 (March 2010 – Canberra Australia) and IOTA.
Steve Conard Willow Oak Observatory, Gamber, MD International Occultation Timing Association (IOTA) Oct 19, 2012.
Steve Conard 4 December Astronomical League (AL) An association of ~240 astronomical societies from across the USA Basic goal.
Tools for Change Plan, Do, Study, Act The PDSA Cycle Explained
Standard Work Making the “new way” become the standard way
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
E-Strategy Open House, January Kuali Student CDM Presentation.
Double Stars Discovered by IOTA Asteroidal Occultations and Reported to JDSO (Journal of Double Star Observations) Tony George Presented at IOTA 2014 Conference.
Teaching activities towards Achievement Standard 2.9 Use statistical methods to make an inference. Lindsay Smith, University of Auckland Stats Day 2011.
P5, M1, D1.
Mrs. Triemer’s “How-to” Guide. First Buy a marble-cover composition book to use as a log book. The logbook is your friend! Write everything in it! This.
Info1409 De Montfort University Lecture 3 The Systems Development Life Cycle Systems Analysis & Design Academic Year 2008/9.
2014 IOTA Conference IOTA Annual Meeting July University of Maryland Observatory College Park, Maryland USA.
Limovie for Lunar Occultations Analysis of a Double Star Occultation Video using LIMOVIE Light Curve, Event Times, Magnitudes. Limovie is written.
August 15, 2012 Fontana Unified School District Superintendent, Cali Olsen-Binks Associate Superintendent, Oscar Dueñas Director, Human Resources, Mark.
ABSTRACT WormBase is a freely available information resource primarily for the nematode Caenorhabditis elegans but which progressively includes data from.
Bridge Owners Forum May 2008 ESDAL Stakeholder Management Team bringing service to life.
Bureau of Indian Affairs ABC and Management Decision-Making May 24, 2006.
TRAUMA DESIGNATION: RAISING THE BAR.  MAR was filed Aug. 8 th, published on Aug. 21. The comment period ends on Sept. 18 th and we should be able to.
Indistar® Flag to Re-Assess. Flag to Re-assess Flag to Re-assess is a feature that will tag… indicators initially assessed as fully implemented, indicators.
Distributed Software Development
SQA Work Procedures.
REGIONAL PEER REVIEW PANELS (PRP) August Peer Review Panel: Background  As a requirement of the ESEA waiver, ODE must establish a process to ensure.
Joy Hamerman Matsumoto.  St Jude Medical Cardiac Rhythm Management Division manufactures implantable cardiac devices ◦ Pacemakers ◦ Implanted defibrillators.
Washington Health Benefit Exchange R EMOVING A S POUSE F ROM A PPLICATION J ANUARY 27, 2014.
PPT Presentation Template: This PPT includes all slides to present a district or building level overview of PVAAS. This was used with a district- wide.
IOTA FUNDING OF OccultWatcher SERVER COST H.PAVLOV.
Paper in major astronomical journal 6.
Annual Renewal in ACAP © Created by Isaac P. E. Mailleue Research Integrity Coordinator University of North Carolina at Greensboro Updated March 2014.
4 May 2010 Towards a common revision for European statistics By Gian Luigi Mazzi and Rosa Ruggeri Cannata Q2010 European Conference on Quality in Official.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
A Level ICT Unit Implementing CBIS’s. Support Installing a new system is disruptive and the support program will need to be planned well in advance.
Start of class Sign out a computer and logon – Must share - 15 computers Have your final project folder If you were absent, look in the box Have out your.
Scientific Method for a controlled experiment. Observation Previous data Previous results Previous conclusions.
UNIT 10: Monitoring and Compliance. 2 Monitoring & compliance Activity 10.1: Class prior experience and local examples of compliance and monitoring activities.
M AIN T OPICS AND T ASKS Assoc. Prof. Dr. Sehnaz Sahinkarakas.
Occultation observations from around the world July 2012 to Sept 2013 Dave Herald.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
The wonderful job at KIMEP High average salary range KIMEP tuition discounts for employees Trainings & seminars for your self-development Annual performance.
OCTE Fall Update November 1, 2012 Elizabeth Collins (517)
Steve Conard Ted Blank International Occultation Timing Association (IOTA) Oct 05, 2013.
Agenda: 1/2 Welcome back Final project overview and schedule – Clarification & questions Restriction analysis challenge Samples – gene cloning Homework:
Paper in major astronomical journal 6.
Web Discovery and Millennium Integrating Millennium with Summon Helen Bronleigh Library Systems Coordinator.
Content Management System/ Web Quality Initiative Administrative Departments.
Project Management Inspections and Reviews 1 February.
457(b) Employee Module Catalogue code: B15 Presentation or Module? Module Slide numbers: B15-1 to B15-5 Registered/Non-Registered Usage: Allowed for all.
Historically, lunar occultations were observed visually, and were treated as binary events – except for when a binary star was involved. Fading caused.
A Proposal for a revisions policy of Principal European Economic Indicators (PEEIs) OECD STES WP June 2008.
Review Data Received/ADR Click on the Workbench link to open up your Work Item List. To work on an Activity you must first click the Claim button.
Accountability Basics for ACCESS Presenter: Brian Swiger Testing Policy & Operations.
DGp Close Double Stars from Occultation Video Recordings David W. Dunham, Anthony George, Brian Loader, and David Herald, International Occultation.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Conducting Research. Finding Resources Online Library Local govt. offices Field research.
Colorado Advanced Life Support June 24,  What you need to know ◦ Colorado Advanced Life Support will be implementing eCards during the next several.
Star Catalog Comparison 2016 IOTA Annual Meeting Steve Preston.
Small Telescope Research Workshop June 12, 2016 San Diego, ca
Peer Editing: Exchange papers with Partner
Uploading light curves to Occult4
Lunar Occultations of Close Double Stars
Brad Timerson, IOTA North American Coordinator; T
457(b) Employee Module Catalogue code: B15
Asteroidal & Lunar Occultations: Results
International Occultation Timing Association
Limovie for Lunar Occultations - 1
Presentation transcript:

Lunar occultations Review/update on recent developments

Implementation of collecting lunar occultations working well In 2009 to date, 3190 observations Data errors - very rare Formal archiving – when graze revision completed Thanks to regional coordinators IOTA taking over from ILOC

Lunar Occultations RGO & ILOC made no corrections, and made no use of the data Discovery claims were frequently only known within the occultation community. The double star community were in ignorance. Maintaining accurate double star info is a MAJOR task Need to properly handle double stars Double stars - background

Asteroidals – to regional coordinators Lunars – ultimately to Brian Loader (NZ) Papers written for JDSO (authorship etc..) USNO picks up results from JDSO Occult data periodically updated with latest USNO data Double stars – report cycle

Key step – the writing of papers for the JDSO To assist, some template papers have been developed and approved by USNO and JDSO Of course, variations are to be expected Important to strike while the iron is hot Peer review is part of the process. And that means being able to handle difficult questions Double stars – report cycle

Asteroidal predictions – a new indicator in predictions that a star is a double Ability to directly access double details from Occult (predictions and observations) Ability to list star catalogue equivalents (important for JDSO paper) Doubles – Occult support - asteroidals

Complete revision of double star files (100% more pairings!) Predictions include alert messages – separations <2 Ability to directly access double details from Occult (predictions and observations) Complete double details in graze prediction Doubles – Occult support – Lunar Preds

Ability to generate a double star report containing information needed to analyse the double star, and to it [to Brian Loader]. Doubles – Occult support – Lunar Obs

Ability to analyse observations to derive PA and separation Includes ability to apply the lunar slope using the Kaguya data Ability to list star catalogue equivalents (important for JDSO paper) Doubles – Occult support – Lunar Anal

Data available from early November Key data is Laser altimeter data Altitude data has to be transformed into a lunar limb profile Derived a fast & reliable way to do this. Kaguya lunar profiles

Created a replacement for the Watts charts Ability to plot the hi-resolution data Fit to past grazes is excellent Occasionally the graze results show inconsistencies with Kaguya Kaguya lunar profiles