1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros September 10, 2012 John Jaros HPS Collaboration Meeting.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
An Overview of the Heavy Photon Search Project John Jaros HPS Collaboration Meeting Jefferson Lab May 26, 2011.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
HPS: proposed run plan, cost and schedule Meetign at DOE, February
HPS EC Report John Jaros HPS Collaboration Meeting at JLAB June 18, 2014.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
HFT face-2-face F.Videbaek Brookhaven National Lab.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
HPS Budget and Schedule Marco Oriunno, June 18, 2014.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
HPS Experiment Overview John Jaros HPS Collaboration Meeting at JLAB October 26, 2015.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
HPS Collaboration Business John Jaros HPS Collaboration Meeting at JLAB June 6, 2013.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.
Rob Connatser NSS Instrument Work Packages and XLPM.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
HPS EC Report John Jaros HPS Collaboration Meeting at JLAB May 5, 2017.
GlueX Collaboration Meeting
Jefferson Lab Overview
CLAS Collaboration Organization for 12 GeV Operations
UK Financial Plan & Risks
CLAS Collaboration Organization for 12 GeV Operations
MICE Project in the US: Completion of Efforts
Overview of CLAS12 Calibration
Cost of Service Analysis & Rate Design
CLAS12 First Experiment Workshop Report
Preparations for a Lehman Review
HPS EC Report John Jaros
HPS EC Report John Jaros
Recoil e- detection in Radiative tridents
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
SOLID Collaboration Meeting
HPS EC Report John Jaros
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros September 10, 2012 John Jaros HPS Collaboration Meeting Jefferson Laboratory June 4, 2013 HPS Project Overview living through the Kafka phases

HPS Direction Set Last Time at SLAC Chance to Run in FY2015 Bob McKeown and Volker Burkert signalled an opportunity for HPS to run in FY2015 * Good chance, but no promises until JLAB’s Re-baselining Review * Good for Hall B, good for HPS * Quickest route to data on CEBAF 12 Re-visiting the HPS Design This made us re-think just what full HPS is, and what we want to do with the commissioning run. * Simplify original HPS design to be ready in time for the scheduling opportunity * Use the new apparatus for both commissioning and production running * Maximize performance Begin preparations of new HPS Proposal for DOE * Needed to submit in time to get funds before FY2014 * DOE HEP welcomed submission late January 2013 * Re-enlisted the Collaboration for proposal writing 2

The New HPS Proposal Needed Additions to the Text * Update the Physics Motivation. * IncludeTest Run Analysis. Ideally, demonstrate performance good enough to search for A’s. * Demonstrate readiness for electron beams (even though the Test Run didn’t get a chance to run electron beams) * Improve budgeting, scheduling, and management. Begin the HPS Metamorphosis * Revisit SVT, SVT DAQ, and Ecal designs * Add a Muon System * Develop needed Slow Controls * Organize Software Effort 3

4 Metamorphosis Phase 1: Metamorphosis It actually turned out better than this!

Original HPS -> HPS’ -> HPS Philosophy Stick close enough to HPS Test Run to be ready by Fall 2014 Improve tracker performance, but stick with PS magnet and present Ecal configuration Fix shortcomings exposed by Test Run * Boost SVT Data Rate, SVT Module Stability and Acceptance * Add Trigger Improvements and Diagnostics * Repair Ecal, develop Calibration and Monitoring, explore upgrades Add Muon system 5

Tracker Simplified, Performance Maintained 6 Old HPS New HPS

New Muon System Boosts Reach 7

8 Phase 2: The Trial(s)

Seeking DOE HEP Approval Wrote Proposal—thanks to many and editor Stepan! * EST updated theory and expanded True Muonium section * New SVT design/ New SVT DAQ design incorporated * Ecal Upgrades explored and external funding sought * New trigger and trigger diagnostics planned * Expanded Test Run Results * New Muon System * Budget, Schedule, and management updates Director’s Proposal Review at SLAC mid January * Useful dry run * Concluded work needed on schedule/management * Resulted in some improvements before submission Proposal submitted January 23, 2013 to DOE HEP One week later, Alan Stone: “Budget Snafu. Please come to DOE HEP next week” 9

The DOE Trials Budget meeting with DOE HEP and NP at Germantown Feb. 8, 2013 * HPS Capital equipment funds must be < $2M * When is HPS scheduled? Need results from Re-Baselining review at JLAB * Want to know if other funding exists (NSF MRI, Orsay, INFN) * Suggested review in July, post re-baselining external funding decisions * Acknowledged that July review would delay funding until ~ October; need for keep alive funding acknowledged. HPS Response * Learned what is meant by “capital equipment, infrastructure, operations” * Had to remove Muon system and some Ecal improvements from Budget * Worked to establish keep-alive funding at SLAC for SVT and SVT DAQ * With DOE, finalized date for Review and date for submission Prepare Proposal Submission ONE MORE TIME * Subgroup Leaders + Marco reworked WBS and Schedule * Updated Test Run Results, Budget and Schedule, Theory * Submitted revised HPS Proposal on May 10 (thanks Stepan and Sho) * Submitted lab Field Work Proposals on May 17 (thanks Marco et al.) 10

Seeking Runtime at JLAB assumed prerequisite for DOE HEP approval HPS Schedule has depended on the outcome of the 12 GeV Upgrade Re-Baselining process at JLAB Originally hoped Lehman Re-Baselining Review would settle this in November, 2012 Lehman Panel was unsatisfied in the November review, scheduled a new review for May, 2013, to establish a credible budget and schedule for the remaining 12 GeV Upgrade, especially for experiments and detectors. May Re-Baselining Review was successful, and a schedule was established. Interesting boundary conditions: * Lab management must show DOE HEP commitment to schedule and run HPS * Lab management must show DOE NP that HPS does not adversely affect 12 GeV Project 11

12

Runtime at JLAB Director’s Review on May 23, 2013 decided… * Install HPS in the fall of 2014 * Commission the beamline during CLAS Torus installation * HPS Commissioning Run during Torus checkout, hopefully Spring, * HPS production run asap afterwards, probably FY2016. TBD. This establishes JLAB commitment to HPS which should satisfy DOE HEP HPS will explore options to advance the commissioning and running time schedule * May be possible to run HPS during Torus installation IF activation to Torus assembly is minimal. Studies are underway. * May be possible to position HPS in Hall B alcove. Then activation is not an issue, and running during Torus installation should be feasible. Additional support is needed for this option. Source of funds? 13

14 Phase 3: The Castle To To To Kafka, the Castle was the symbol of interminable bureaucracy, senseless rules, and arbitrary procedures. Worse than the DMV. In HPS, of course, the organization is sensible, efficient, well-motivated, and only in place to guarantee we are on time and under budget. Entirely different!

Organizing for the HPS Project Preparing for the DOE Review * Talk titles and speakers have been assigned * Dry runs will be scheduled ~ July 1. Everyone welcome. * Budget, schedule and management plan will be an important part of the review. HPS Management put in place since last Collaboration Meeting * Project Management Team Project Manager Marco Oriunno Project Scientists Stepan Stepanyan and John Jaros * Bylaws charge EC with oversight of groups, allocation of resources, resolution of conflicts, and scheduling. * Working Group Leaders and Deputies have been appointed for HPS Subsystems 15

Draft DOE Review Agenda 16 DOE HEP Review of HPS at Gaithersburg Hilton, July 11, 2013

HPS Working Groups 17 Beamline Ken Moffeit (Girod) ECal Raphael Dupre (Stepanyan) SVT Tim Nelson (Fadeyev) DAQ Sergey Boyarinov (Hansson) Trigger Valery Kubarovsky (Maruyama) Slow controls Hovanes Egiyan (Nerses ) Muon Keith Griffioen (Gershtein) Software Maurik Holtrop (Uemura/ Moreno) Analysis Matt Graham (Philips) Project Management Marco Oriunno (Stepanyan, Jaros) HPS Subgroup Leader (Deputy)

18 Recruit and organize subgroups Conduct and record regular subgroup meetings Provide contributions to the proposal, including schedule & budget Facilitate detailed engineering designs, design reviews, and construction schedules and milestones. Oversee construction and testing Oversee installation, commissioning, integration, and day to day operation Charge to HPS Subgroup Leaders

Moving HPS beyond the Kafkaesque Re-designed and improved HPS Analyzed the Test Run Results Wrote and submitted a comprehensive new proposal (Twice!) Learned to abide by DOE budget rules Improved budget, schedule, and milestones Established HPS project management Settled on the HPS schedule with JLAB/Hall B Review by DOE HEP Approval and funding by DOE HEP HPS Engineering Design, Construction, and Test Installation and Commissioning Data Taking 19 Through all this project evolution, our physics goals have remained compelling, new and unexplained results have provided new hints of the existence of hidden sectors, and HPS physics is becoming mainstream.