BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.

Slides:



Advertisements
Similar presentations
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 IOC for upgrading BPM DAQ software WANG,Jian ( 王坚 ) Univ. of Sci. & Tech. of China.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
Kazuro Furukawa, KEK, May Event System and Embedded IOCs EPICS Meeting, Vancouver 1 Event System and Embedded IOCs at KEK Recent Activities at KEK.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
K.Furukawa, Apr EPICS at KEKB Injector EPICS-ness at KEKB Injector Kazuro Furukawa, KEK. KEKB Injector and Legacy Controls Network Controllers EPICS.
K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 1 Injector Linac Kazuro Furukawa, for e – /e + Linac Group Present Status Upgrade.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Kazuro Furukawa, KEK, Jun EPICS Collaboration Meeting / NSRRC SuperKEKB Controls 1 Recent developments towards SuperKEKB controls Kazuro Furukawa.
Kazuro Furukawa, KEK, Oct EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
AS Diagnostic Collaboration Mark Boland
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
1 KEK e-/e+ Linac and EPICS Channel Access Servers – EPICS Training – K.Furukawa – Mar EPICS KEK e - /e + Linac and EPICS CA Servers Kazuro Furukawa,
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
K.Furukawa, Feb Controls Activity at KEK Controls Activities at KEK Issues for ILC Kazuro Furukawa, KEK.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
K.Furukawa, Apr EPICS at KEKB Injector EPICS-ness at KEKB Injector Kazuro Furukawa, KEK. KEKB Injector and Legacy Controls Network Controllers EPICS.
Kazuro Furukawa, KEK, Jul KEK Linac Operation and Stability Linac Mini-Workshop 2006, IHEP, Beijing 1 KEK Linac Operation (Some Experiences) Kazuro.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
KISTI & Belle experiment Eunil Won Korea University On behalf of the Belle Collaboration.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Kazuro Furukawa, KEK, Jan Accelerator Controls at KEK EPICS Workshop 2009, RRCAT, India 1 Event System at KEK Kazuro Furukawa, KEK KEKB and Linac.
K.Furukawa, KEK, Nov Injector Linac Progress towards SuperKEKB Progress of Injector Linac Kazuro Furukawa for Injector Linac 1.
Kazuro Furukawa, KEK, Jun EPICS Collaboration Meeting / NSRRC SuperKEKB Event / Timing Controls 1 Timing system towards SuperKEKB controls Kazuro.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Progress of Injector Linac
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.
MicroTCA Development and Status
Accelerator control at iThemba LABS
LLRF Research and Development at STF-KEK
Status of the ASTRID2 facility
Current Status of IPM-Linac Control System
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
SuperB Injection, RF stations, Vibration and Operations
Magnet Power Supplies for SuperKEKB Main Ring
Readout board: DRS, Oscilloscope
Development of new power supplies for J-PARC MR upgrade
Utilization of KEKB for ILC R&D
Fill-pattern Control System for KEKB
ERL BPM System Mike Billing, Mark Palmer
< kek.jp > Measurement and Data Acquisition for Accelerator Controls at KEK (Beam Position Monitor at Linac) Kazuro Furukawa < kazuro.
LAL meeting on e+ studies, Oct. 2010
High Charge Low Emittance RF Gun for SuperKEKB
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Device support for VMIVME-5565 and its usage at KEK
Presentation transcript:

BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS Collaboration Meeting in NSRRC 2015/9/10 M. Satoh/ KEK Linac Control 1

BPM DAQ for KEK Linac KEK e-/e+ Linac and Operation 2015/9/10 M. Satoh/ KEK Linac Control 2

BPM DAQ for KEK Linac Injector Linac: 8 GeV e-/3.5 GeV e+, 50 Hz, 0.1~10 nC KEKB : 8 GeV e-/1400 mA, 3.5 GeV e+/2000 mA PF: 2.5 GeV e-/450 mA PF-AR: 6.5 GeV e-/60 mA Lepton Accelerator Complex in KEK Tsukuba Site KEKB : Shutdown in June 2010 SuperKEKB : 7 GeV e-, 4 GeV e ~

BPM DAQ for KEK Linac 2015/9/10M. Satoh/ KEK Linac Control4 PF Beam current stability since Apr KEKB e-/e+: 1 mA (~ 0.05%) : e-: 12.5 Hz, e+: 25 Hz - PF: 0.05 mA (~ 0.01%) : 0.5 Hz Luminosity KEKB e+ KEKB e- Simultaneous Top-up for 3 rings

BPM DAQ for KEK Linac BPM and Old DAQ System 2015/9/10M. Satoh/ KEK Linac Control5

BPM DAQ for KEK Linac Linac BPM System 2015/9/10M. Satoh/ KEK Linac Control6 BPM x 100 for 600-m-long Linac –Stripline-type (four electrodes) –Position and Charge measurement –Orbit and Energy Feedback DAQ System –x 20 DAQ Stations (One DAQ station typically handle BPMx4) –Digital Oscilloscope and VME CPU

BPM DAQ for KEK Linac 2015/9/10M. Satoh/ KEK Linac Control7 –5 GSa/s, 8 bits, 2ch, 1 GHz BW, GPIB (low noise immunity) –DAQ rate: ~1 Hz –Oscilloscope (Tektronix TDS680B) –VME CPU (OS-9/ MC MHz) Vx1 Vx2 Vy1Vy2

BPM DAQ for KEK Linac Analogue signal from BPM (KEKB e-) 2015/9/10M. Satoh/ KEK Linac Control8 7 ns

BPM DAQ for KEK Linac 2015/9/10M. Satoh/ KEK Linac Control9 Middle server layer HLA layer Orbit Display Panel (SAD/Tk) BPM DAQ layer Orbit and Energy FB

BPM DAQ for KEK Linac New System (WindowsXP-based Oscilloscope) 2015/9/10M. Satoh/ KEK Linac Control10

BPM DAQ for KEK Linac BPM DAQ Upgrade Difficulty of maintenance (Old oscilloscope/VME) Fast DAQ is strongly required (50 Hz) for simultaneous top-up operationFast DAQ is strongly required (50 Hz) for simultaneous top-up operation Hardware replacement in summer 2007 Software upgrade => EPICS IOC in summer /9/10M. Satoh/ KEK Linac Control11

BPM DAQ for KEK Linac 2015/9/10M. Satoh/ KEK Linac Control12 –WindowsXP-based Oscilloscope (Tektronix DPO7104) –10 GSa/s, 8 bits, 4ch, 1 GHz BW, Ethernet connection –DAQ rate: > 50 Hz –EPICS IOC running on Oscilloscope (R3.14.9) 10 nC (1 V/div) 0.1/1 nC (200 mV/div)

BPM DAQ for KEK Linac Oscilloscope performance 2015/9/10M. Satoh/ KEK Linac Control13

BPM DAQ for KEK Linac EPICS PV Name Example LIiBM:SP_A1_B8_1:XSNGL:KBE LIiBM:BPM name:Property:Beam mode Beam mode –KBE (KEKB e-) –KBP (KEKB e+) –PFE (PF e-) –ARE (PF-AR e-) –and more (Study mode for each beam) 2015/9/10M. Satoh/ KEK Linac Control14

BPM DAQ for KEK Linac Synchronization w/ Beam mode Beam mode KEKB e-KEKB e+PF e-PF-AR e-… LIiEV:sa … 2015/9/10M. Satoh/ KEK Linac Control15 EPICS PV Event generator It works well, so far When network traffic is increased, …?

BPM DAQ for KEK Linac 2015/9/10M. Satoh/ KEK Linac Control16 HLA layer BPM DAQ x 24 (Win.XP Scope. EPICS IOC) PF KEB e-KEB e+ Archiver NAS Blade server Middle server layer (Python)

BPM DAQ for KEK Linac Summary and Future Plan The new BPM DAQ system has been developed: –EPICS IOC (WindowsXP-based digital oscilloscope) –Old system (20) has been replaced by new one (24) –Successful in stable beam position measurement (50 Hz) –Similar system was adopted for BPM DAQ of KEKB-BT Towards to SuperKEKB injector upgrade: –Higher resolution (100  m -> 10  m?) –Several candidates are now under consideration Libera Briliance Single Pass? VME-based new one? 2015/9/10M. Satoh/ KEK Linac Control17

BPM DAQ for KEK Linac Thank you for your attention! 2015/9/10M. Satoh/ KEK Linac Control18