HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Slides:



Advertisements
Similar presentations
Commission 7 Annual Meeting1 Annual Meeting Commission 7 Kraków September 2003 PROGRESS REPORT CHAIR.
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
J. Jones (Imperial College London), Alt. GCT Mini-Meeting Source Card Design Status and Plans.
P.P. & APD gain ratio report— 4 month testing Ken Chiang, J.Y. Lin, Jeri Chang 2009/3/19.
Readout Electronics Alexander Karakash & Natalia Kondrat’eva MEPHI for DESY.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
ECAL front-end electronic status
HR3 status.
CALICE meeting 2007 – Prague
HCAL task status report
HCAL Modules -First Ideas
Electronics: Demod + 4Q FE
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
STATUS OF SKIROC and ECAL FE PCB
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
CALICE meeting 2007 – Prague
Tests Front-end card Status
Status of the EUDET Prototype
The CMS Tracking Readout and Front End Driver Testing
Scintillator HCal Prototype
Presentation transcript:

HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke

HCAL Base Board - HBAB Mathias ReineckeHCAL – Technical Meeting1 Features : - Base board for 6 Analog Boards (HAB) - Communication with DAQ (CERC) - Trigger for CMB board - Two versions : ECAL left and right populated Status : - 2 Boards in production (right populated), production + assembly : 3-4 weeks - design of left-populated : finished in 1 week

HCAL Base Board - HBAB Mathias ReineckeHCAL – Technical Meeting2 Left-Populated Dimensions : 47.5 x 19 cm² Height (Board + Components) : 15.5 mm

HCAL Analog Board - HAB Mathias ReineckeHCAL – Technical Meeting3 Features : - Carries one LAL ASIC (18 SiPM channels) - HV filtering and SiPM biasing - Communication with HCAL Base Board - Temperature monitor on board Status : - 2 Boards fully assembled - 26 Boards available (not assembled)

HCAL Analog Board - HAB Mathias ReineckeHCAL – Technical Meeting4 Connector to Base Board Temperature Monitor Analog Test Output ASIC Analog Line Driver Parameter Shift-Reg Dimensions : 9 x 6.2 cm²

HCAL Testboard Mathias ReineckeHCAL – Technical Meeting5 Status : - 2 boards fully assembled - one board unassembled (spare) Features : - Base board for one HAB - Interfaces 18 SiPMs - Corresponds to ECAL Left Populated - Charge injection inputs (test)

HCAL Testboard SiPM Interface, 18 chns. Charge Injection Power CMB Control Test Outputs (SRIN, TCALIB) Mathias ReineckeHCAL – Technical Meeting6 DAQ Interface Dimensions: 16 x 16 cm² HAB

Parameter Shift Register Mathias ReineckeHCAL – Technical Meeting7 Task : Definition of operating parameters Total length : 960 bits (one shift reg. for 6 HABs) Loading clock : kHz Loading 1 kHz : 1 sec per Base Board Switch : physics / calibration mode

Timeline Mathias ReineckeHCAL – Technical Meeting8 Risks / Delays : Test of series production : board by board till mid August 2005 (500 HABs, 80 HBABs). Manpower for DAQ software and series test ? Design errors on HBABs (delay per redesign : 7 weeks) A lot of unknown features : Noise, temp.-stability, dynamic range, mechanical interface to SiPM cassette, CMB interface (ground loops etc.)

Test Setup Mathias ReineckeHCAL – Technical Meeting9 Series Board Tests (HAB) : - Power dissipation - Loading shift register - Noise/Pedestal level - Calibration pulse / Readout - HV strength Test of HBABs with HABs : - Communication with DAQ - HV strength Charge Injection

Summary Mathias ReineckeHCAL – Technical Meeting10 System concept can be tested now !! Characterization with SiPMs : 2nd half of March First HCAL layer (series production) : July 2005 Time schedule is tight : no redesigns included, implies full access to manpower and resources, needed time for series test not clear Preliminary user manual available :