Broward County-wide Master Reuse Plan

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Moving to the Next Level of Water Use Efficiency in Florida Janet G. Llewellyn, Director Division of Water Resource Management Florida Department of Environmental.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Solar Implementation in SE Florida: Go Solar Florida Dec 10, 2013 RCAP Implementation Workshop “Catalyzing Solar Development and Implementation in Southeast.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption Hearing May 19, B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Building a Legacy: Integrated Water Resource Management in Damascus, Oregon Oregon Water Conference May 25, 2011 WBG PDX GS
Dkl D. Kerry Laycock, CMC  Organizational Consultant  dklaycock.com Kent County, Michigan Citizens Committee Meeting November 14, 2011 Multi-Jurisdictional.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Go SOLAR Broward Rooftop Solar Challenge Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Identification of Key Stakeholders Standardized Permitting.
South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Energizing Utilities to Embrace Demand Energizing Utilities to Embrace Demand Management South Florida Water Management District Water Summit December.
Go SOLAR Broward Rooftop Solar Challenge. Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Proposed Permitting Solution Solar Contractors Feedback.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Environmental Infrastructure Needs Assessment: GIS Based Decision Support System Southwest Center for Environmental Research and Policy Presented by Rene.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
Mark Elsner Administrator, Water Supply Development Section Mark Elsner Administrator, Water Supply Development Section WateReuse Florida - Fit For A Purpose.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Agenda Item #10 Revised Process for State Expenditure Plan and Approval of Next Steps Doug Robison, PWS Gulf Consortium Meeting April 21, 2016 Hillsborough.
Southeast Florida Utility Council Annual Update 2016.
1 GE-Sw011 Southern Regional Wastewater Treatment Plant Ocean Outfall Rule Change Pilot Testing Plan of Study Development Monday, February 13, 2012.
Broward County Water Advisory Board Technical Advisory Committee December 19,2014 Barbara Powell, EPCRD, Broward County.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
PALM BEACH COUNTY WATER UTILITIES DEPARTMENT
CITY OF HALLANDALE BEACH
Delivering Water Reuse Solutions
PRESENTATION FOR CITY OF TITUSVILLE, FLORIDA
Water Reclamation Plant Feasibility Study Update May 28, 2014
Reuse and Wastewater Disposal
Calvin, Giordano & Associates, Inc.
A quick walk through of how the system will work
SOLID WASTE disposal WHERE ARE WE?
A quick walk through of how the system will work
SOLID WASTE disposal WHERE ARE WE?
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Indiana Finance Authority (IFA)
Why Potable Reuse in Florida?
Presentation transcript:

Broward County-wide Master Reuse Plan Southeast Florida Utility Council March 10, 2014 Develop a regional reuse master plan Broward County, Municipalities, and Water Providers Short term Work to establish a regionally coordinated master plan for the development and delivery of reclaimed water on a county-wide basis.

Presentation Overview - Road Map Where we started: Background Goals What we did: Team Selection Scope Development Project Tools Development Where we’re going: Implementation Planning, and Data Collection

BACKGROUND

Background: Water Resources Task Force Task Force Report - January 2011 Included 40 recommendations in the areas of: Water conservation Reuse planning and development Regional water supply projects Investigation and modeling Recommendations addressed regional water resource needs ensuring the sustainability of the environment, the quality of life for the residents as well as the economic vitality of the region. The Technical Team was directed to give special consideration to reuse opportunities as part of later development of regional water supply alternatives for the Task Force’s consideration.

Background: Water Resources Task Force Eleven (11) recommendations specific to reuse including; Recommendation #19 Regional Reuse Master Plan 20) Recognize utility investments in reuse – Pursue a system of allocated alternative water supply credits for utilities that pay for reuse. (SFWMD and Water Providers – short term) 21) Develop and maintain a regional coverage of local reuse infrastructure – Support County efforts to develop a regional GIS coverage of local reuse infrastructure for use in future 22) Coordinate with the Florida Department of Transportation (FDOT) – Work with the FDOT to obtain annual updates 23) Coordinate with the Florida Department of Environmental Protection (FDEP) Reuse Work Group and related entities 24) Utilize corridors in reuse planning efforts – Investigate the use of rights-of-way, canals and other waterbodies for laying reuse lines. 25) Coordinate with the Broward County Metropolitan Planning Organization (MPO) 26) Update local 5-Year Capital Improvement Plans (CIP) – Phase into 5-year CIPs the necessary infrastructure to more fully utilize available reclaimed water supplies 27)Amend land use and comprehensive plans – Encourage better integration of reuse planning and projects in future development and redevelopment plans 28) Further the use of reclaimed water for irrigation – Develop new county and/or municipal ordinances, or amend current ordinances establishment of mandatory reuse zones, fully considering the availability of flows, proximity of irrigation systems to reclaimed water lines, costs and

Background: Water Reuse Challenges Developed urban areas 25 distinct water providers 15 distinct wastewater providers Seasonal demand fluctuations Treatment costs/disposal options RWAR- limiting traditional water sources Ocean outfall legislation (Senate Bill 1302) requiring the elimination of treated wastewater disposal via ocean outfalls and the transfer of 60% of facility actual flow on an annual basis to beneficial reuse applications by 2025. Two of the six ocean in Broward County. The combined flows of these two facilities is approximately 77.5 MGD; hence, fulfillment of obligations under this legislation will require that 46.5 MGD of current wastewater flows be redirected to beneficial reuse applications within Broward County.

Background: Water Reuse Drivers Key Drivers in the Past Key Drivers Today Water/Wastewater concurrency Saltwater intrusion Costs for alternatives Regional Water Availability Rule Ocean Outfall Rule Climate Change Regulatory Requirements RWAR- limiting traditional water sources Ocean outfall legislation (Senate Bill 1302) requiring the elimination of treated wastewater disposal via ocean outfalls and the transfer of 60% of facility actual flow on an annual basis to beneficial reuse applications by 2025. Two of the six ocean in Broward County. The combined flows of these two facilities is approximately 77.5 MGD; hence, fulfillment of obligations under this legislation will require that 46.5 MGD of current wastewater flows be redirected to beneficial reuse applications within Broward County.

Background: Regulatory Reuse Drivers Reclaimed Water Feasibility Study Renewing Facility Permits Renewing Water Use Permits Renewing UIC Permit

Background: Reuse Master Plan Goal To develop a Regional Reuse Master Plan that will build upon current municipal and county efforts and coordinate a regional approach to reuse planning, maximizing cost-effective reuse development within Broward County To create a platform for shared communication To provide flexible and interactive planning tools reduce demands on the Biscayne Aquifer, the development of alternative water supplies, and fulfills legislative and consumptive use permit requirements for reuse development.

Coordination & Tool Development

Work Effort: Team Selection Water and Wastewater Providers/Local Gov’ts Consultants Hazen and Sawyer, P.C. Craven Thompson & Associates, Inc. Cordova Rodriguez & Assoc., Inc. Steve Lamb Broward County: Natural Resources Planning and Management Development and Environmental Review BC Water and Wastewater Services FLDEP, DOH, DOT, SFWMD

Work Effort: Team Collaborations Review of Previous Studies/Reports Stakeholder Meetings Stakeholder Specific Interactive Project Analysis Reclaimed Water Planning Tools Development

Work Effort: Tool Production GIS Reclaimed Water Planning Tool Project Evaluation Model ...tools can be easily adapted and updated as reclaimed water needs and drivers change over time

Work Effort: GIS Planning Tool Foundation for data storage and interpretation Database of existing and planned reclaimed water infrastructure Addition of planned County Public Works Projects Google Earth platform allows for easy manipulations of alternatives Tool was used to develop proposed regional projects

Work Effort: BC WWS Example Broward NRWWTP 5 Miles 3 Miles 1 Mile Broward WWS Utility Boundary Evaluated potential users based on distance from WWTP Two scenarios: With utility boundaries Without utility boundaries

Within Utility Boundary Work Effort: BC WWS Example, cont. Scenarios Within Utility Boundary No Utility Boundary No. of Customers Demand (mgd) Potential Partners One mile radius 3 0.37 4 0.39 Pompano Beach Three mile radius 38 3.63 78 9.42 Pompano Beach, Deerfield Beach, Margate Five mile radius 59 4.55 154 13.83 Pompano Beach, Deerfield Beach, Margate, Coral Springs, Fort Lauderdale, North Lauderdale, Parkland

Work Effort: Project Evaluation Model Criteria were developed with stakeholders Final criteria included the following categories Project Benefits Project Implementation Project Reliability General Acceptance of Project Project Costs Weights and scaling factors were established Model is in Excel – simplifies revisions

Work Effort: Master Reuse Plan Existing and planned reclaimed water infrastructure Planned County Public Works projects Costs and carbon footprint of potential reclaimed water projects Climate change impacts on reclaimed water options Potential reclaimed water opportunities by utility Regional reclaimed water projects Regional projects using Criteria Model Guidelines for future maintenance of tools

Future implementation

Implementation: Benefits Current: Database of existing reclaimed water infrastructure-not previously available Catalyst for multijurisdictional partnering Documents reuse projects for future funding under SB 444 or other Future: Reduction in engineering costs for future planning efforts Ability to visually analyze options Platform to coordinate with future public works projects and potentially reduce construction costs

Implementation: Potential Projects for Analysis

Implementation: Criterion

Implementation: Initial Initial Implementation Plan is based on criteria today The Implementation Plan is flexible Will be updated as drivers change over time To be updated by utilities in the future

Implementation: Preliminary Regional Projects Implementation Phasing Capital Cost per Gallon Total Capital Cost Reason for Grouping: Project Name Reclaimed Water Demand (mgd) Phase & Timing MGD per Phase Cumm. MGD BC - PBC Agreement (to PBC) 15.00 I 2015 - 2020 24.54 $5.43 $104M ongoing/ocean outfall requirement BC - PBC Agreement (within BC) 4.2 Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance Cooper City (credit sharing with other) 0.96 II 2020 - 2025 23.61 48.15 TBD outfall compliance by 2025 Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 Hollywood Aquifer project 20.40 $8.92 - $13.82 $182M - $282M Plantation Large User 3.92 III 2025 - 2030 13.87 62.02 $6.66 $26M score 40-50 Margate Large User 1.83 $9.10 $17M Miramar Large User (across boundaries or with Pembroke Pines Effluent) 8.12 $8.64 $70M Pompano Beach Residential Irrigation – Phase B 1.58 IV 2030 - 2035 9.12 71.14 $10.42 $16M score 30-40 Davie Large User - Phase B 0.85 $9M Sunrise Springtree 2.72 $8.14 $22M Sunrise Sawgrass Large User - Phase B 3.97 $9.71 $39M CSID Large User 2.17 V 2035 - 2040 3.86 75.00 $10.83 $24M score <30 Sunrise Southwest Large User 0.69 $15.45 $11M Fort Lauderdale - unidentified 1.00

Implementation: Preliminary Regional Projects Implementation Phasing Capital Cost per Gallon Total Capital Cost Reason for Grouping: Project Name Reclaimed Water Demand (mgd) Phase & Timing MGD per Phase Cumm. MGD BC - PBC Agreement (to PBC) 15.00 I 2015 - 2020 24.54 $5.43 $104M ongoing/ocean outfall requirement BC - PBC Agreement (within BC) 4.2 Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance Cooper City (credit sharing with other) 0.96 II 2020 - 2025 23.61 48.15 TBD outfall compliance by 2025 Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 Hollywood Aquifer project 20.40 $8.92 - $13.82 $182M - $282M

Reclaimed Water Demand (mgd) Implementation: Phase I 2015-2020 Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners BC - PBC Agreement (to PBC) 1 15.00 $104 M Palm Beach County, Deerfield Beach, Coconut Creek BC – PBC Agreement (within BC) 1 4.20 Sunrise Sawgrass Large User – Phase A 2 2.00 $29 M Plantation Davie Large User – Phase A 3 3.34 $34 M Sunrise PHASE I RECLAIMED WATER DEMAND 24.54 1 – BCWWS will progress in incremental amounts. 2 – City is required to construct 2 mgd but may install additional capacity. 3 – Town is presently constructing.

Reclaimed Water Demand (mgd) Implementation: Phase II 2020-2025 Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Cooper City Credit Sharing 1 0.96 TBD Pompano Beach Residential Irrigation – Phase A for BCWWS 2 2.25 -- Hollywood Floridan Aquifer 20.40 $182 M –$282 M PHASE II - RECLAIMED WATER ADDED 23.61 TOTAL RECLAIMED WATER DEMAND 48.15 1 – City will pay another utility to construct for ocean outfall compliance. 2 – BCWWS compliance alternative for ocean outfall compliance.

Reclaimed Water Demand (mgd) Phase III – 2025 - 2030 Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Plantation Large User 3.92 $26 M -- Margate Large User 1.83 $17 M Miramar Large User (with additional effluent, if desired) 8.12 $70 M Pembroke Pines, Cooper City PHASE III - RECLAIMED WATER ADDED 13.87 TOTAL RECLAIMED WATER DEMAND 62.02

Reclaimed Water Demand (mgd) Phase IV – 2030 - 2035 Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Pompano Residential Irrigation – Phase B 1.58 $16 M -- Davie Large User – Phase B 0.85 $9 M Sunrise Sunrise Springtree Large User 2.72 $22 M Lauderhill, Tamarac Sunrise Sawgrass Large User – Phase B 3.97 $39 M PHASE IV - RECLAIMED WATER ADDED 9.12 TOTAL RECLAIMED WATER DEMAND 71.14

Reclaimed Water Demand (mgd) Phase V – 2035 - 2040 Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners CSID Large User 2.17 $24 M Coral Springs, Tamarac Sunrise Southwest Large User 0.69 $11 M FPL Fort Lauderdale - Unidentified 1.00 TBD PHASE V - RECLAIMED WATER ADDED 3.86 TOTAL RECLAIMED WATER DEMAND 75.00

Implementation: Phase I 2015-2020

Implementation: Phase II 2020-2025

Implementation: Future !!!

Questions? Barbara A.Powell (954) 519-0356 Bapowell@broward.org

Weights Established by Stakeholders Example: Project Costs Criteria Criterion No. Criterion Criterion Weight (Plantation) Criterion Weight (others) 18 Available Funding Assistance 5% 19 Capital Costs 60% 45% 20 Operation and Maintenance Costs 18% 15%

Criterion Values Included in Model No. Criterion Description Criterion Values 2 Potable Offset Indicates if Utility has a need for AWS 0 = No need 2 = Provides AWS 3 Susceptibility to Climate Change Sensitivity of project to climate change/SLR. 0 = Benefits will be significantly lower 1 = Benefits will be moderately lower 2 = Benefits are NOT expected to change 3 = Benefits will increase 4 Complies with Outfall legislation or permit requirement Indicates compliance with reuse requirements 0 = Does not meet/not required 1 = Project partially meets requirements 2 = Project fully meets