Exercise Opus Findings Gas Customer Forum 10 th March 2008.

Slides:



Advertisements
Similar presentations
Operating Margins UNC Sub Group Tuesday 4 th November 2008.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A regulatory framework for gas quality treatment facilities: recap and update.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group -140 Thoughts on additional information requirements.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Winter 2006/07 so far Gas Forum 29 January Actual Weather  December was the 5th warmest on record on a Composite Weather Variable Basis.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Review of System Alerts
Transmission Planning Code – Draft Document
Transmission Planning Code
Transmission Planning Code
SO Incentives from April 2010
NTS Entry Charging Review Update
Operating Margins (OM) Consultation
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Development of Entry Capacity Substitution
Transmission Planning Code Review
Mod 0621 Amendments to Gas Transmission Charging Regime
Modification 501 slides for Workgroup
Operating Margins (OM) Consultation
Entry Capacity Transfer and Trade
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Gas Customer Forum 28 July 2008
Presentation transcript:

Exercise Opus Findings Gas Customer Forum 10 th March 2008

Exercise Opus  NEC emergency exercise completed by the DNs in late September / early October 2007  Opus tested firm load shedding within the DNs and isolation capability only  DNs physically visited a proportion of sites to simulate load shedding and isolation  DNs were asked to define Special Status Sites (sites who can be load shed quickly) and report on load shedding performance for these sites  HSE will be publishing the Opus report shortly

Firm load shedding > 25,000 tpa sites  There was an increase in sites who could turn off gas (43% - 47%) compared to the previous year  More than a third of sites cannot be contacted due to incorrect contact information  19% of site could be contacted but were unable to turn off their gas  The quality of contact information varied considerably by shipper

Cannot Contact Site

Sites Contacted and Can Turn Off

Cannot Contact Site

Sites Contacted and Can Turn Off

Special Status Sites  DNs demonstrated that they were able to load shed 80% of the load consumed by special status sites within four hours.  DNs are to review how they defined Special Status Sites in light of the Opus results.

Isolation  DNs were able to demonstrate that they could deliver timely isolation  Site visits highlighted practical constraints at some sites (valves in busy roads etc). DNs will review isolation plans to ensure locations are suitable.

Conclusion ♦ There has been a small improvement in >25,000tpa sites which can be successfully shed ♦ A third of sites still cannot be contacted due to incorrect contact information ♦ Contact information varied considerably by shipper and improvements are still needed in this area. ♦ As expected Special Status Sites could be reliably contacted and load shed ♦ Isolation plans were shown to be effective

TBE Process Timeline Gas Customer Forum 10 th March 2008

TBE Process Dec: Publish Ten Year Statement Feb/Mar: Consultation Apr/May/Jun Demand & Supply Forecasts Outline investment proposals July 10th: Industry seminar September?: Long Term Auctions Oct/Nov: Review Investment Plan

TBE 2008 Update  Meetings with most industry players completed  Good dialogue, open discussions  Broad range of views expressed  Shipper’s open session completed 6 th March 2008  To date a limited number of industry questionnaires have been returned  Collective UKCS data again to be provided through Oil & Gas UK  TBE Summer Event 2008 is again at One Great George Street, Westminster on 10 th July 2008  Contact – Peter Parsons -

OM Consultation Gas Customer Forum 10 th March 2008

Operating Margins (OM) Consultation  National Grid Gas is consulting on future competitive OM provision  Special Licence Condition C25 requires us to ‘...promote competition in the provision of OM services to the licensee by 1 April 2009.’  What does the consultation feature?  Background on current OM arrangements  Discussion regarding existing and potential new providers of OM (both supply and demand side)  Discussion regarding possible procurement mechanisms

Consultation Details  Timescales:  Consultation issued: w/c 10 th March 2008  Workshop planned for late April to discuss issues  Consultation ends: 2 nd May 2008  The consultation documentation can be found at: We value responses from all areas of the industry to assist us in the development of a robust enduring OM regime. Questions? Contact

Gas Operations Winter Reporting Monthly Web Update - February

Monthly Web Update  hlyupdates/ hlyupdates/  The following charts are available online:  Gas Supply Build Up  Gas Demands (breakdown)  UKCS Monitor  Import Assessment  Gas Price vs Interconnector & Storage Activity  Current supply assumptions table

Gas Supply Build Up  Recent Supply Characteristics:  February weather has seen “mild” periods interspersed by “warm” periods, hence the clear peaks and troughs.  Norwegian flows high with an average of 79mcm/d and a peak of 99mcm/d, the highest this winter.  BBL continuing to flow steadily at around 36mcm/d.  IUK imports have been intermittent, with some periods seeing flows ~20mcm and other periods seeing no import.  There has been virtually no LNG import flows during February.  Some Short Range Storage (LNG Storage) has flowed particularly during the high demands mid month.

Gas Demands  February demand has been mainly above seasonal normal.  The most notable trend is average Daily Metered demand (large industrial & power) which has increased again to a 139mcm/d average from a 127mcm/d average in January.  Storage injection has been very low, with an average of 1.2mcm/d.

UKCS Supply Monitor  Recent drop in UKCS supply due to loss of Bacton Shell due to a fire.  Proven UKCS supply now 251mcm/d.  Actual UKCS supply outturn has been good, with flows broadly in line with pre winter forecasts.

Gas Prices

Gas Price vs IUK & Storage Activity  The UK gas price (SAP) has averaged 51p during February, well above this time last year. A price spike up to 57p was witnessed around 28 Feb which coincided with the Bacton Shell supply loss.  The period saw net storage withdrawal into the NTS (+ve green bars).  There was little IUK activity, although the mainly small flows were more import than export.  Peak net IUK imports were 1 st Feb at 22mcm/d, which is close to this winter’s maximum of 23mcm/d.

Supply Assumptions Update

Transmission Planning Code Transmission Workstream 6th March 2008

Introduction  National Grid Gas (NGG) has a new licence obligation to introduce a Transmission Planning Code by 1 October 2008 that will “cover all material technical aspects relating to the planning and development of the pipe-line system…which may have a material impact upon persons connected to or using (or intending to connect or to use) the pipe-line system”  Aim is to improve transparency of NTS planning process  NGG will publish open letter on 7 March 2008 inviting views on the scope of Transmission Planning Code document

Transmission Planning Code – What is it?  Framework document relating to the planning and development of the NTS  Methodology to determine the physical capability of NTS considering  Entry and exit capacity release obligations  How much capacity can be transferred/traded between entry points  How incremental flows at entry and exit affect system capability  Statutory network security obligations  Detailed assumptions on  How supply and demand patterns will develop over time  How the system will be operated under different supply and demand scenarios

Transmission Planning Code – Governance  Transmission Planning Code must be in force by 1 October 2008 after consultation with interested parties and approval by the Authority  NGG must comply with and maintain the code  Review and consultation process undertaken by NGG at least every 2 years  Modifications must be approved by the Authority

Timeline (2008) Implementation 7 March Open letter inviting views on scope by 21 March 2008 MarchAprilMayJuneJulyAugSeptOctNov... 1 October 2008 target date for implementation April/May Industry discussions on draft document June/July Formal consultation (28 days) Aug/Sept Authority considers consultation report Development

Draft Scope  Legislative guidance documents  e.g. IGE recommended practice documents  Planning legislation and consents process  e.g. Implications for investment lead times  National Grid policies relevant to planning and development of NTS  e.g. assessment of new loads, design of NTS pipelines and installations  Network Analysis techniques  e.g. considerations for investment planning, how physical capability is determined  Supply and Demand Outlook  e.g. how TBE forecasts are used in investment planning

Next Steps  NGG publish open letter 7 March 2008 inviting views on draft scope  Responses requested by 21 March 2008  NGG to develop draft Transmission Planning Code document for discussion  Consideration given to licence requirements and industry views on scope  Industry workshops to discuss draft document during April and May – suggested dates are:  3 April 2008 and 1 May 2008 (after Transmission Workstream)  Further workshops June and July to support consultation if required