Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)

Slides:



Advertisements
Similar presentations
Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon.
Advertisements

Why should I consider Implementing a Document Imaging / Management System? Created by Harold Hegerhorst North American Technology. LLC © North American.
Design Review Welcome Bassam Sanadiki Sr. Engagement Leader.
Arnd Meyer (RWTH Aachen) Jan 23, 2004Page 1 Data Taking Jan 16 – 23 Store # BeginLum [cm -2 s -1 ]Duration 3175Fri Jan 16 16:23 4.5E hrs 3177Sat.
Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E hrs 3125Sat 23:414.2E31.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
PHENIX FLYING INTO NEW ERA Stefan Bathe, Time Meeting, April 27, 2010.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Arnd Meyer (RWTH Aachen) Dec 4 th, 2003Page 1 Tevatron and DØ Status and Plans Arnd Meyer, RWTH Aachen DØ Germany Meeting December 4 th, 2003.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
Thesis Presentation IV – Fall Midterm Review NewMediaArts art 249 :: interface design II week 9 :: b.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Bell Work: Reminder – your FSA Writing will be on Friday, March 6 th in Computer Lab. 222-F. Agenda: The Tragedy of Romeo and Juliet The Tragedy of Romeo.
This workshop is licensed under a Creative Commons License.Creative Commons License. Session 4 INTEGRATING AN EDUBLOG INTO YOUR CLASSROOM You should hear.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
WEEK 2 TOPIC : INTERNET (CONTINUED) This is the distribution of messages, information, fascimiles of documents e.t.c from one computer terminal.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
Easy Seminar Tutorial A comprehensive look at the best conference calling, webinar and tele- seminar platform available anywhere With David Steele
 For many of you… that answer is YES!! GOOD WORK!!!  If you are done… make sure your senior social studies teacher has your log sheet and an artifact.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Algebra 2 Tuesday, May 5 Somebody get us started with “Good Things!” Open your books to page 540.
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Bellringer—Ten Week Reflection Answer the following: What did I do well the first ten weeks of school? What is an area in which I would like to improve?
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
__________________________________ C. Avila, small x workshop, Sep ELASTIC SCATTERING IN D0 EXPERIMENT Carlos Avila Universidad de Los Andes Bogota,
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Notes 8.4 – MULTIPLYING SPECIAL CASES
Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Changes in delivered luminosity by varying the store length, using the luminosity projection model described in in Beams-doc-2022 Vaia Papadimitriou 30.
Probability Using Venn Diagrams
1.
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
DO NOT OPEN YOUR BINDER UNTIL INSTRUCTED
Solving Equations 3x+7 –7 13 –7 =.
Presentation transcript:

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 2 Data Taking Efficiency Pre-shutdown plunge

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 3 Downtimes I Special runs Large downtimes

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 4 Downtimes II

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 5 Downtimes III

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 6 Downtimes IV Special runs Large downtimes

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 7 Events / News / Etc. Power outage Monday 7:00 If you want captains/shift crew to do anything (power down, call,...), provide written instructions – don't just assume somebody will do it Already know that Dan is going to be here for Clock/TFW/L1CAL Until Tuesday, no activities – (un)cabling etc. – that could impact Calorimeter noise studies Turning things back on after power outage in coordination with Calorimeter noise task force No new store after 0:01 Sunday Terminate last store at 16:00 Sunday – after this may be a good time to do tests etc. before everything is taken apart Until then: expect 0 stores (base) to 2 stores (design)

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 8 Agenda RussMechanicalBrendan / MichaelLumi ArndData TakingGordon / DougL3 Mike S.FPD StuOnline Jeff/RobL1Muon Al ItoCentral Muon Bob K.L1CAL DmitriForward Muon Fred/Drew/AbidCFT+PSMichiel / Joe S.GM ReinhardL2Geoff / Fritz Controls ???STTBreese / MichaelSMT Stefan / BrigitteL1CTT NirmalyaCAL