The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN 2013-01-08.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Background – Maxwell Equations The Maxwell equations arise out of the electromagnetic force laws (Coulomb’s law and the Biot-Savart law) by separating.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Proposal Update: the n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC Meeting ORNL,
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n 3 He Experiment Probing the Hadronic Weak Interaction Abstract: Although QCD has had tremendous success in describing the strong interaction at high.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
N- 3 He Experiment: overview and updates Christopher Crawford University of Kentucky n- 3 He Collaboration Meeting ORNL, TN
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
Systematics of the SNS n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration APS April Meeting Denver, CO,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
To measure the beam intensity a sampling method was used where two cadmium apertures (P1 and P2) are placed to cut the beam down so the neutron counts/sec.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The NPD  Experiment David Bowman IScientific goals IIStatus.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration NSAC Review Meeting Chicago, IL,
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
CLAS12 Drift Chamber Prototyping
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Conceptual Design of the Neutron Guide Holding Field Christopher Crawford, Yunchang Shin University of Kentucky nEDM Collaboration Meeting
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
ELENA installation progress F. Butin / ELENA collaboration.
Fundamental Neutron Physics BL-13
Transverse RF Spin Rotator for the n-3He experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
The NPDGamma Experiment at the SNS FnPB
n3He Experiment: Spin Flipper and Neutron Polarimetry
Resonant Frequency Spin Rotator For the n3He Experiment
Advanced Research Electron Accelerator Laboratory
The n3He Experiment Michael Gericke for the n3He collaboration
Cryomodule Assembly Plan
The n-3He Experiment Christopher Crawford for the n-3He Collaboration
Polarized 3He target installation
Presentation transcript:

The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN

Outline  Experiment design Reaction and observable Experimental setup  Execution Commissioning plan – 2 configurations Run time Resources  Collaboration Organization Manpower  WBS subpackages Beam line Solenoid Spin rotator Target / detector Preamplifiers Data acquisition Online analysis Integration Commissioning 08/09/20152

10 Gauss solenoid RF spin rotator 3 He target / ion chamber supermirror bender polarizer (transverse) FnPB cold neutron guide 3 He Beam Monitor FNPBn- 3 He Experimental setup  Measure PV spin asymmetry A ~ 1x10 -7 s n  k p (Viviani) 15% relative error  longitudinal holding field – suppressed PC nuclear asymmetry A=1.7x10 -6 (Hale) s n  k n x k p suppressed by two small angles  RF spin flipper – negligible spin-dependence of neutron velocity  3 He ion chamber – both target and detector 08/09/20153

Experimental Layout – from NPDGamma … 08/09/20154

Experimental Layout – … to n 3 He 08/09/20155

Experimental Layout – … to n 3 He 08/09/20156 Even though NPDG and n3He are very similar, we still require two separate IRR’s for n3He

Unistructure support – preliminary CAD model TOP VIEW 08/09/20157

Unistructure support – preliminary CAD model SIDE VIEW 08/09/20158

n-3He collaboration  Spokespersons D. Bowman, M. Gericke, C. Crawford  Local Project Manager S. Penttila  Project Engineer Jack Thomison  Work Subpackage Leaders G. Greene Neutronics L. Barrón Solenoid C. CrawfordSpin rotator M. Gericke Target / detector D. BowmanPreamplifiers C. CrawfordData acquisition N. FominOnline analysis J. HamblenIntegration D. BowmanCommissioning 08/09/20159

Neutronics for the experiment 08/09/201510

Neutronics for the experiment  Scope FnPB guide, polarizer, beam monitors – stays UNCHANGED PPS remains UNCHANGED Beam profile scanners, polarimetry  Status All equipment is being used for NPDG experiment except the beam profile scanners XY-scanners in hand and tested  Remaining work Design shielding and mounts for xy-scanner – April Design mount for 3 He analyzer (polarimetry) – April Modify beamline shielding – April 08/09/ Chris Hayes, Kabir Latiful Josh Hamblen Geoff Greene

Magnetic field 08/09/201512

Magnetic field  Scope Magnetic field simulations to verify adiabatic spin rotation and uniformity Unistructure frame for Magnetic coils, Spin rotator, and Target/detector mounts directly onto existing NPDG stands on the beamline Design, construction, and testing of longitudinal solenoid 10 Gauss holding field, just like NDPG  Status Conceptual design, preliminary calculations indicate adiabaticity 15 coils, 15 cm apart, 35 cm radius, 150 A turns Materials for frame and coil supports are in hand  Remaining work Machining of coil supports: January – March Assembly of coils and stand: April Test coils and mapping of field at UNAM: May 08/09/ Andrés Ramirez, Libertad Barrón

Spin rotator 08/09/201514

Spin rotator  Scope Design of RF double cos-theta coil Machining forms for inner/outer coils, aluminum enclosure, mounts RF driver electronics Field mapping and testing  Status Design complete Machining of coil forms near completion RF driver electronics exist and are being used for NPDG  Remaining work Winding of coils: January Construction of enclosure:Jan (in parallel) Testing and field mapping:Jan–Feb (in parallel) 08/09/ Chris Hayes, Geoff Greene Chris Crawford

Inner Cylinder Design: Complete Construction: In progress at UT Physics machine shop. Scheduled completion date: January /09/201516

Outer Coils Design: Complete Construction: Outer coils fabricated using 3D print Technology. Delivered /09/201517

Aluminum Shell Design: Some design issues are still in progress including a moveable stand for precision alignment with neutron beam. Construction: Aluminum shell will be built by UT physics machine shop end of January 08/09/201518

Target / detector 08/09/201519

Target /detector  Scope Vacuum enclosure with 1 atm 3 He 144 channels of sense wires  Status Vacuum enclosure in hand Wires soldered to frames  Remaining work Assemble wire plane stack, readout plane: Feb – March Vacuum test and fill with 3 He: March Electronics noise testingApril 08/09/ Mark McCrea Michael Gericke Seppo Penttila

Target /detector: vacuum housing  12” Conflat end flanges  1 mm Al windows  Fill gas: 1 atm 3 He  Feedthroughs: 4x signal, 2x high voltage, 2x vacuum 08/09/201521

Target / detector: ion chamber wire planes  17 HV planes  16 signal planes 144 signal wires  All wires soldered to frames  Mounting hardware and fittings all constructed  PCB readout boards will arrive late January  Assembly in February  Testing starting in March 08/09/201522

Preamplifiers  Scope 4 boxes of 36 channels: one per vacuum feedthrough Circuit board designed locally at ORNL Connector to ion chamber vacuum port and cabling to DAQ module  Status Circuit boards constructed and initial testing complete Achieved theoretical limit on some channels, testing in progress  Remaining work Design forced air cooling Build cables to preamp Test all channels Test instrumental asymmetries with spin rotator, target 08/09/ Kabir Latiful Irakli Garishvili David Bowman

Data acquisition  Scope 144 channels of 24 bit, 128 KS/s ADC Standalone system: NO support from DAQ group  Progress PO to be issued for data acquisition electronics next week – delivery of hardware end of March, firmware upgrade end of May Basic control software written; used to take and analyze data Preliminary measurements of electronic noise – within specification  Remaining work Build cabling from preamps to DAQ: Jan Test complete system: Feb – April 08/09/ Kabir Latiful Irakli Garishvili Nadia Fomin Chris Crawford

Online Analysis  Scope: Data transfer and analysis computers 36 TB RAID storage Online analysis software STAND-ALONE system – no support required from DAQ group  Status: NPDG infrastructure Existing software  Schedule forward: Build complete network – March Production-grade software – April 08/09/ Kabir Latiful Irakli Garishvili Carlos Olguin Ivan Novikov Nadia Fomin Michael Gericke Chris Crawford

Integration / preassembly  Scope : Design of unistructure support frame Design, construction of mounting and alignment hardware Maintain 3d solid model of experiment  Status : Preliminary solid model exists Conceptual design for mounts and alignment  Remaining work: Final design of stand and mounting / alignment: Feb Construction of mounting, alignment hardware: Apr Assembly of complete system: May-June Dry run of commissioning process: June 08/09/ Caleb Wickersham Mark McCrea Jack Thomison Geoff Greene Josh Hamblen

Alignment  Mounting / alignment components Aperture / crosshairs for beam scan Support stand and xy-adjustment for theodolite Alignment V-block for trimming B-field Optical system and adjustable mount for target 10 mrad tolerance – no need for S/A crew 08/09/201527

Commissioning  Scope : Testing for instrumental asymmetries Dry run of commissioning during assembly Polarimetry and beam scans Alignment of beam / magnetic field / chamber Measurement of parity-conserving asymmetry with transverse field  Status : Preliminary commissioning plan well-thought out  Remaining work: Installation in FnPB: July Beam alignment scans: Aug-SeptPHASE 1 IRR Measure transverse asymmetry: Oct–DecPHASE 2 IRR 08/09/ everyone… David Bowman

Installation – see Jack’s talk for more details

Commissioning / run plan 1. Scan beam profile upstream and transfer centroid to crosshairs 2. Scan beam profile downstream 3. Align theodolite to crosshairs 4. Align B-field to theodolite 5. Field map in RFSR/Target region 6. Align the position / angle of target with theodolite / autocollimator 7. Tune RSFR / measure polarization 8. Measure physics asymmetry IRR #1 IRR #2

Timeline – see Seppo’s talk for more details  Construction of subsystems in parallel Will stage experiment in EDM building and perform dry run of field map, beam map, and alignment procedures Expect to be ready for beam at beginning of cycle Aug 2014  Milestones Begin integration on common stand Begin installation in FnPB cave IRR – begin commissioning phase Begin physics data taking  Runtime 66 days commissioning (all equipment pre-assembled) 15 days PC transverse asymmetry 1.7 x ± 0.6 x days PV longitudinal asymmetry 1.2 x ± 1.7 x * based on theoretical calculations 08/09/201531

Resources – see Jack’s talk for more details  Minimal utilization of SNS crafts Most equipment mounted on single support structure, staged in the EDM building, craned onto NPDG det. Support Machining will be done at university shops only SNS engineer is Jack Thomison, on n3He funds – 3D solid model will be drafted within the collaboration, reviewed by Jack, and incorporated into SNS model Minimal radiological group support – MCNP model created by Nadia Fomin, Paul Mueller, validated by radiation group No survey & alignment resources required – alignment is relative to beam scan No support required from DAQ group – standalone system 08/09/201532