The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
Environmental Management System (EMS)
I S O A u d i t F i n d i n g s E n v i r o n m e n t a l C o n f e r e n c e B y : S y l w i a L a B u d d e.
DOCUMENTATION REQUIREMENTS Based on ISO 9001:2008
Understanding the Requirements Qimpro Standards Organization
Draft BY QI organization June 2014
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Preparing for Quality System Certification
The ISO 9002 Quality Assurance Management System
Quality Management System
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009WELCOME! Americas Aerospace Quality Group AAQG Registration.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
FPSC Safety, LLC ISO AUDIT.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
ISO 9001:2008: Key changes and transition process
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Effectively applying ISO9001:2000 clauses 5 and 8
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
13th &14th July 2010 Gaelle Rousseau-Lamour
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
ISO STANDARDS TRAINING & CONSULTING
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
ISO 22000:Food safety management systems — Requirements for organizations throughout the food chain: Contents Page Foreword Introduction 1 Scope 2 Normative.
الدكتور علي كامل يوسف الساعد
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
ISO 14001:2004, Environmental Management System
Visit us at E mail: Tele:
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Setting up an Internal Audit Program By
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
Internal Auditing ISO 9001:2015
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Presentation on Quality management systems Presented by: Razeena Ameen Roll no BS(IT) 7 th.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
10 June 2016 | Proprietary and confidential information. © Mphasis 2013 Overview of ISO 9001:2008 Mar Internal Auditor Training.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
TEMPUS ME-TEMPUS-JPHES “IMPROVEMENT OF PARTNERSHIP WITH ENTERPISES BY ENHENCEMENT OF A REGIONAL QUALITY MANAGEMENT POTENTIALS IN WBC” TEMPUS
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Setting up an Internal Audit Program
Agenda Who are we? 1 Introductions Journey so far 2
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
Company Name Date By Whomever
How to conduct Effective Stage-1 Audit
ISO-9001:2000 Quality Management Systems
Company Name Date By Whomever
Presentation transcript:

The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke

Copyright © 2007 − W. M. Uttke & Company What Does the Standard Require? The organization shall conduct internal audits at planned intervals to determine whether the quality management system:  Must Conduct  Planned Intervals

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? Conforms to the planned arrangements (see 7.1), to the requirements of this International Standard and to the quality management system requirements established by the organization, and Conforms to 7.1 Requirements.

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? 7.1 Planning of product realization The organization shall plan and develop the processes needed for product realization. Planning of product realization shall be consistent with the requirements of the other processes of the quality management system (see 4.1). In planning product realization, the organization shall determine the following, as appropriate:

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? Quality objectives and requirements for the product; The need to establish processes, documents, and provide resources specific to the product; Required verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance; Records needed to provide evidence that the realization processes and resulting product meet requirements (see 4.2.4).

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? The output of this planning shall be a form suitable for the organization’s method of operations. Note 1 – A document specifying the processes of the quality management system (including the product realization processes) and the resources to be applied to a specific product, project or contract, can be referred to as a quality plan. Note 2 – The organization may also apply the requirements given in 7.3 to the development of product realization processes.

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? To the requirements of this International Standard ISO 9001:2000 To the quality management system requirements established by the organization, The companies documented procedures is effectively implemented and maintained.  Effectively Implemented  Maintained

Copyright © 2007 − W. M. Uttke & Company Why Do We Audit? How do we measure the effectiveness of implementation? How do we determine that the quality management system is being maintained? An audit program shall be planned, An audit program is not and audit schedule. An audit schedule is part of an audit program. Taking into consideration the status and importance of the processes and areas to be audited, as well as the results of previous audits.  Status and importance of the processes  Areas to be Audited  Results of previous audits

Copyright © 2007 − W. M. Uttke & Company Audit Planning The audit criteria, scope, frequency and methods shall be defined  Audit Criteria  Scope  Frequency  Method Selection of auditors and conduct of audits shall ensure objectivity and impartiality of the audit process. Auditors shall not audit their own work.  Impartial  Objective  Not own work

Copyright © 2007 − W. M. Uttke & Company Audit Planning The responsibilities and requirements for planning and conducting audits, and for reporting results and maintaining records (see 4.2.4) shall be defined in a documented procedure.  Planning  Conducting  Reporting  Maintaining Records  Documented Procedure

Copyright © 2007 − W. M. Uttke & Company Reporting The management responsible for the area being audited shall ensure that actions are taken without undue delay to eliminate detected nonconformities and their causes.  Actions are taken without undue delay

Copyright © 2007 − W. M. Uttke & Company Reporting Follow-up activities shall include the verification of the actions taken and the reporting of verification results (see 8.5.2).  Verification  Corrective Action  Quality Records

Copyright © 2007 − W. M. Uttke & Company Corrective Actions The organization shall take action to eliminate the cause of nonconformities in order to prevent recurrence. Corrective actions shall be appropriate to the effects of the nonconformities encountered. A documented procedure shall be established to define requirements for:  Reviewing nonconformities (including customer complaints),  Determining the causes of nonconformities,  Determining and implementing action needed,  Records of the results of action taken (see 4.2.4), and  Reviewing corrective action taken. Without Undue Delay

Copyright © 2007 − W. M. Uttke & Company For Whom Do We Audit? Review Input The input to management review shall include information on results of audits  Management  Company Goals  Maintenance  Strategic  Verification of Best Practice  Following Processes  Product and Process Conformance

Copyright © 2007 − W. M. Uttke & Company Conclusion ISO 9001:2000 is a management system Auditors are an extension of the top Managers’ eyes and ears.