CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.

Slides:



Advertisements
Similar presentations
NASA SCaN Service Management Workshop Summary CSSA Service Management Working Group London, UK October 2010 John Pietras Global Science and Technology,
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
November SLS RFM and RNG REPORT 18 November 2004.
Standards for Internal Control in the Government Going Green Standards for Internal Control in the Federal Government 1.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
CSSM Meeting Summary Spring 2013 Meetings 15 – 18 April E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Bordeaux, France.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
NASA Space Network Ground Segment Sustainment (SGSS) Schedule Request SMWG Boulder, CO 31 October – 4 November 2011 John Pietras GST, Inc.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Develop Project Charter
CSSM Meeting Summary CCSDS CSSM Technical Meetings Pasadena, CA USA 23 – 27 March 2015.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Trajectory Predictions Data Formats Draft White Book CCSDS CSSM Technical Meetings Pasadena, CA, USA 23 – 27 March 2015 Jessica Reinert NASA/GRC.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
Discussion Outline 1.RFID Tag-Encoding Blue Book updates to respond to CESG RIDs A.KKG observations and suggestions re: Peter Shames, SANA registries i.ISS.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
Functional Resource and Service Component Information Maintenance 9 November 2015 Darmstadt, Germany.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Fall Meeting, November 11, 2015 Paul Pechkam, JPL/NASA
CSSM Meeting Summary CCSDS CSSM Technical Meetings Cleveland, Ohio, USA 04 – 08 April 2016.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
Introduction to Functional Resources
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
System Engineering Area SANA BoF Kick-Off
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Presentation transcript:

CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA

eb- 2 Contents 1. Joint Session – CSSM/CSA WGs 2. Draft Concept Review 3. Framework Outline and ‘Client’ Recommendations 4. Framework Extensibility Mechanism 5. Roadmap 6. Information Entities 7. Concept Book Project Definition 8. Schedule of Services Project Definition 9. Schedule of Services Project Definition 10. Framework Project Definition 11. Joint Session – CSSM/CSTS WGs 12. Current Agency Blue-1 Implementations 13. Timelines Discussion 14. JAXA Prototype Test Report 15. Planning for next 6 months

Joint Session CSSM/CSA WGs Agreed to harmonize Enterprise models Agreed that CSA WG will take lead in producing SysML model CSSM will subsequently work toward fitting into/revising CSA SysML model

eb- 4 Draft Concept Review Key Updates Agreed Upon Enterprise model to start in section 2 May need more elaboration of enterprise model in section 3 prior to lifecycle Service agreement needs to allow for multiple spacecraft definitions Rework summary section (framework definition, diagrams) May 2011 Berlin, Germany

“Client” Book Outline Given Framework Book (Exploration of End-State) No significant changes suggested Question was raised: is extensibility re modulation schemes is captured in managed services books? Is the modulation scheme in the managed service books or the framework? (…segue to extensibility mechanism..)

Framework Extensibility Mechanism Main question is to what level extensibility is needed – ie., is it relatively coarse grain or fine grain Related to functional resources vs service access points - E,g. Will CCSDS ever offer a standardized intermediate frequency out type of service? (vs., telemetry frames) - Does it makes sense to “pre-cook” sub-service level (mostly related to space link) configurations and offer those as the significant extension points - E.g, CCSDS 401 style space link vs CCSDS 415 style space link vs DVB-S2 style space link Other significant questions include Do we essentially assume a component model, given the functional resources? Is the functional model OID tree part of this component model’s meta-data?

Roadmap No significant issues were noted with general flow of roadmap Further write-up to be provided in the Concept Book - Editorial Note (not discussed): Schedule of Services is ahead of 1 st version of framework effort per project definitions -- WG Chair comment: technical risk, deemed acceptable

Information Entities (Scheduling Focus) Review of schedule format information suggests following items as a first cut: Service Times - Start of Activity - Beginning of Track (Pass) - End of Track (Pass) - End of Activity Mission Identifier Station Identifier Antenna Identifier Service Package Identifier Some discussion points: Some networks have the same value for station identifier and antenna identifier (i.e., the station is the antenna) NASA SN does not appear to be well represented by this yet – it seems to be a reasonable starting point for other networks Agreed that specification/information needs to be kept relatively small - Engage agency reviewers sooner rather than later

Concept Book Project Definition

Schedule Format Project

Framework Project Definition

Joint Session CSSM + CSTS Main focus was review and discussion of functional resources; especially so from the point of view of being applicable to the CSS Area in general Conclusions The OID (Object ID) tree needs further development; CCSDS portion beginning directly with CSTS is an understandable artifact of CSTSWG origin but needs revision for broader scope SANA registry policy for functional resources (FRs) is an Area Level concern, as FRs have a bearing on both CSTS and CSSM recommendations Question about instance identifiers for monitoring reporting for a service package execution with multiple antennas involved and/or multiple scenarios (is there a hierarchy of instance identifiers) ? - Consensus is to associate instance identifiers at per production chain/station/antenna level – should imply a “flat” instance identifier scheme

Current Agency Blue-1 Implementation Activities NASA: SGSS (for Space Network) - Currently in development - utilizing Blue-1 as basis for machine-to-machine interfaces; - Significant extensions to Blue-1 with a concentration in service package management service - E.g., Wait-listing of service packages, (conditional) “chaining” of alternate sets of service packages - See “SGSS_extension_of_SCCS-SM ” presentation for further information NASA Space Communication and Navigation office is considering a NASA wide portal development using CCSDS B-1 XML Schema as a starting point

Timelines Discussion Reviewed introductory material See dated 15 October 2012 from C. Haddow, subject “Timeline standardization telecon follow-up” Agreed that schedule data is very likely a good candidate for a “payload” for a general timelines data format and/or timelines management system Unclear as to whether a schedule will ultimately be GLTL (Ground Linear Time Line) or ATL (Activity Time Line) Approach is start with assumption of GLTL

JAXA Test Report Updated JAXA Blue-1 prototype test report reviewed and approved To be included in yellow book report thereby recording all prototype activities

Planning  Spring 2013 (1/3)

Planning  Spring 2013 (2/3)

Planning  Spring 2013 (3/3)

Thank You Thank you to all attendees for a very successful CSSM WG inaugural meeting.