PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
S t a t e I n f o r m a t i o n T e c h n o l o g y A g e n c y Procurement Policies and Procedures Presenter: Edwin Mashau Procurement Services SITA Limpopo.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
1. In Accordance With : 2 Highest Level Lowest Level.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
ZHRC/HTI Financial Management Training
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
1. Goals High Risk Activity – National reviews consistently find problems in the methodology Recipients (WYDOT) and Sub-recipients (you) use when making.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
PURCHASING & SUSTAINABILITY SERVICES. What does Humbers’ Purchasing & Sustainability Services do? We acquire the goods and services for all the schools.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
Marcy Mealy Procurement Specialist CDBG Program
Vendor Registration in Ordnance Factories. In Ordnance Factories purchases & works in r/o stores, plant & machinery and civil works is required to be.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2014.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
INTRODUCTION TO PUBLIC PROCUREMENT
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
North West Department of Education Presentation to the Select Committee on Appropriation Parliament of the Republic of South Africa Wednesday 21 April.
Student Affairs Buying 101 Procurement Methods Students First Topic
Auditing Purchases, Trade Payables and Payroll
BASIS :REPUBLIC ACT NO GOVERNMENT PROCUREMENT REFORM ACT  MODERNIZE  STANDARDIZE  REGULATE ALL GOV’T PROCUREMENT ACTIVITIES SCOPE :  GOODS.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Contratación en los Organismos Internacionales de Propiedad Industrial Ignacio de Medrano Caballero Director Adjunto Área de Recursos Humanos 25/10/2011.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
Key Observations of the Post Review of Procurement carried out by Development Partners and TSG Consultants 24 th Review Meeting of State FCs- Delhi (3.
United Nations Procurement Division
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
Understanding Procurement 1. Procurement Policy Need to set up guidelines & policy Need to set up procurement committee; this should include a cross-section.
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2013.
EVALUATION OF SUPPLY CHAIN MANAGEMENT PRACTICES WITHIN THE R THRESHOLD 10 March 2010 PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
KENYA NATIONAL BUREAU OF STATISTICS
Eastern African Association of Public Accounts Committees (EAAPAC) & Southern African Development Community Organisation of Public Accounts Committees.
Office of Procurement Services.  Vendor Application Website: 
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
IT PROJECT MANAGEMENT B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY.
Instruction of NCP to Procurement and Small Scale Contracting funded from the EEA and Norwegian Funds Czech-Norwegian research programme CZ09.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
HET PRESENTATION TO THE PORTFOLIO COMMITTEE ON HIGHER EDUCATION AND TRAINING (PCHET) PARLIAMENT OF SOUTH AFRICA, CAPE TOWN 20 MARCH 2013.
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON COOPERATIVE GOVERNANCE & TRADITIONAL AFFAIRS PRESENTER: MR V MADONSELA 13 NOVEMBER 2012.
Project Management – PTM712S
Procurement Process WFP Logistics, We Deliver.
Purchase order management process
Tender Evaluation and Award Process
Content of Tender Dossier - Instructions to Tenderers - Tenders
Content of Tender Dossier Instructions to Tenderers
Contract Award Procedures
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
- Period before Tenders Submission –
International Open Procedure (1) – PRAG 4.3
Department of Community Development
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Request for Proposal & Proposal
The Office of Procurement PURCHASING TRAINING MAY 2018
Preparation of Procurement Plan (PP)
APUR 101 Introduction to USCA Purchasing
Procurement Planning Mani Ram Gelal
INTERNATIONAL COMPETITIVE BIDDING (ICB)
United Nations Procurement Division
Supplier conference - UNHCR Mission
Presentation transcript:

PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007

Contents Significant Findings General Observations Possible deviations in Contracts not reviewed Recommendations for Projects

Significant Findings Technical Education Quality Improvement Project- TEQIP [7 states] Risk Rating: MediumContracts with substantial deviations: 87 out of 259  Incorrect method of procurement Bypassing of procurement guidelines:  One civil works contract split into 7 contracts to avoid NCB procedures.  One contract split into 2 contracts to remain within limits of DC  Purchase of computers split into 8 different contracts (out of which 3 reviewed by us), to avoid NCB procedures Contract awarded without receipt of a minimum of 3 quotations (55 contracts) Procurement made through DC; conditions for DC under para 3.7 of the guidelines not fulfilled (8 contracts) NS followed for contract above USD 50,000 instead of NCB (1 contract) Civil works procured through DC, which is not allowed as per the terms of the agreement (2 contracts) DC followed instead of NS (4 contracts)

Significant Findings Technical Education Quality Improvement Project- TEQIP (contd.) Risk Rating: MediumContracts with substantial deviations: 87 out of 259 Fixed Budget method used for selection of auditor, which is allowed only for institutional development sub-projects as per the project agreement (1 contract) Selection of individual consultant made on single-source basis, which is not allowed as per the Project Agreement (1 contract) Approval not taken from WB for DC, as required by project agreement (32 contracts) Certain goods like ACs, LCD Projector, Motorized screen, etc. supplied under Works contract (2 contracts)  Others First NCB not referred to WB for prior review (5 contracts) Additional work undertaken/ additional items purchased than initially estimated/ required as per the RFQ (6 contracts)

Significant Findings Technical Education III Project [7 states] Risk Rating: HighContracts with substantial deviations: 47 out of 72  Incorrect method of procurement NS followed for contracts above USD 50,000 instead of NCB (4 contracts) Single procurement split into multiple contracts to avoid applying NCB procedures (9 contracts through NS & 7 contracts through DC) Purchase of furniture based on bids obtained for an earlier contract six months old, without inviting fresh bids (1 contract) Procurement made on the basis of DC though the same does not fall under any of the criteria specified in the Project Agreement for DC (6 contracts) Contract awarded without receipt of minimum of 3 quotations (1 contract) State tendering procedures adopted instead of NCB procedures, resulting in restriction in competition to within the state. Further, bid evaluation criteria not mentioned in bidding documents. (3 contracts)

Significant Findings Technical Education III Project (contd.) Risk Rating: HighContracts with substantial deviations: 47 out of 72  Quality of quotations not appropriate Similar handwriting in different bids (5 contracts) Signature of same person different on invoice and quotation (1 contract) Format/language/description of goods in different quotations exactly same (8 contracts) Same telephone no. in different quotations (2 contracts) Alterations in the quotations (1 contract) Computer generated quotations without complete addresses, telephone numbers, sales tax/ VAT registrations, etc. (4 contracts) Common spelling/ other mistakes in all quotations received (5 contracts)

Significant Findings Technical Education III Project (contd.) Risk Rating: HighContracts with substantial deviations: 47 out of 72  Discrepancies in evaluation Bids of the bidders’ rejected on grounds of non submission of authorization letters whereas selected supplier had also not submitted the same for all items (1 NCB contract) Bids rejected as non-responsive due to non-submission of ISO certificate) even though the bidder had subsequently (prior to evaluation) provided the same (3 contracts)  Others Earlier bids rejected on grounds of non-responsiveness and fresh bids invited without WB’s prior approval. During re-bid, modifications in technical specifications not sent to each bidder resulting in receipt of a single bid (under NCB), which was accepted without ensuring price reasonability. (1 contract) Negotiations held with the selected bidder (1 NCB contract)

General Observations  Cost estimate not prepared for consultancy/NCB  Inadequate publicity of tender (NCB)  RFQs not sent in writing  Bid validity period not mentioned in RFQ/ quotation  Deadline for submission of bids not mentioned in advertisement/ RFQ  Basis of evaluation of bids not specified in RFQ  Opening of bids after a time gap of receipt of quotations  Bid security not sufficient  Evaluation report not in specified format  PO issued/ contract awarded after expiry of bid validity period  PO does not contain all terms and conditions of the contract  Delays in delivery of goods/services  Delays in payments  Asset identification numbers not assigned to the assets  Assets not being used for the project

Recommendations for Projects  General Project Officials should apprise themselves of the World Bank procurement guidelines and thresholds applicable to their project. State level offices should take the lead in educating the district level project staff. If limits/thresholds for procurement not practicable, the same should be highlighted to bank for revision/approval  Publicity Adequate publicity of the procurement notice should be made to ensure wider participation from prospective bidders (NCB)  Evaluation Complete documentation should be done for the procurement procedures adopted and decisions taken during evaluation Quality of bids/quotations received should be reviewed/assessed appropriately before considering them as responsive

Recommendations for Projects (contd.)  Contracting Purchase Order should mention all important terms and conditions of the award of contract Purchase Order should be issued within the bid validity period The timelines for delivery specified in the supply orders should be realistic, considering the geographical location of the project and nature of items procured. Efforts should be made to ensure adherence to these timelines by the vendors.  Asset Records Proper asset register with all relevant details of the assets purchased under the project should be maintained and kept updated All assets purchased from project funds should be assigned an identification number, which should be marked on the asset

THANK YOU