Construction Documents Review Questions. 1.The procurement (bidding) requirements are a.a part of the construction documents, but not the contract documents.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Contracting
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
CIVL202 Construction Engineering I
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
1 Focal Point and Images Light from a nearby object passes through a lens forming an image. Which of the following is true? a)The light is in focus at.
PROCEDURES FOR SELECTING THE CONTRACTOR
CSI Certification Presented to the Louisville Chapter of CSI November 13, 2014 Edmund L Brown, CSI, CCCA, Assoc. AIA Project Architect, Sebree Architects.
Construction Engineering 221 Drawings and Specifications.
Construction Contracts
Understanding The Benefits Of Surety Bonds. What is Surety Bonding? Surety ObligeePrincipal.
Construction Contract Documents
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Doing Business with Department of Enterprise Services for General Contractors and Subcontractors June 19, 2013.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Construction Specifications
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Chief Legal Counsel, OSFC
Construction Contracts and Project Delivery Methods
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Warranties Review Questions. 1.The person who becomes secondarily liable for another’s debt or performance is called the: a.Guarantee b.Warrantor c.Guarantor.
OPA Office Professionals Assist, LLP Contracts, Proposals and Estimating.
252. A broker used the following clause in his exclusive listing contract: “In consideration of the execution of the foregoing, the undersigned broker.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Formats Review Questions. 1.Which organizational system is used in the preliminary stages of a project? a.MasterFormat b.UniFormat c.PageFormat d.All.
Changes in the Procurement Dynamic 1. Richard H. Shaban Toronto, ON June 4, 2013.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Preliminary Project Descriptions and Outline Specifications
CONSTRUCTION CONTRACTS DOCUEMENTS
COURSE INTRODUCTION ARE 459 BY CONTRACTS AND SPECIFICATIONS
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Phases Review Questions.
Drawings Review Questions. 1.The type of line used to represent the extent of the property boundary for site is called the: a.Regulating line. b.Property.
Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.
Chapter 2 The Construction Business Environment. Key Terms Addenda Agency CM Agreement American Institute of Architects (AIA)
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
You passed the Bond or secured some funds What do we do now? 2014.
Conditions of the Contract Review Questions. 1.General Conditions and Supplementary Conditions make up the: a.Specifications b.Bidding Requirements c.Conditions.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Specification Language Review Questions. 1.The word “any” when used in specifications means: a.A limited number selected at the discretion of the Contractor.
BCM 210-L1 IMPACTS OF MATERIALS AND METHODS. DEFINE THE FOLLOWING MATERIALS METHODS ASSEMBLIES.
Product Evaluation Review Questions. 1. Product evaluation begins when: a.The characteristics of specific products are examined and assessed b.Final bids.
Division 1 – General Requirements Review Questions.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
When you write to a file, what happens to the content that’s already there? A.The new content replaces the original content. B.The new content goes at.
Allowances, Alternates, and Unit Prices Review Questions.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Why CSI? Presented by Wayne Wheeler, PE, CSI, CDT
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Bidding Requirements Review Questions.
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Presentation transcript:

Construction Documents Review Questions

1.The procurement (bidding) requirements are a.a part of the construction documents, but not the contract documents. b.a part of the project manual. c.a part of the construction documents but not the project manual. d.in the same part as the contract modifications.

1.The bidding requirements are a.a part of the construction documents, but not the contract documents. b.a part of the project manual. c.a part of the construction documents but not the project manual. d.in the same part as the contract modifications.

2.Procurement (Bidding) documents are a.Legally enforceable requirements which become part of the signed contract. b.Include all of the construction documents except the bidding requirements. c.Defined as all the construction documents issued to bidders before the signing of an owner- contract agreement. d.Only the documents bound in a three – ring notebook.

2.Bidding documents are a.Legally enforceable requirements which become part of the signed contract. b.Include all of the construction documents except the bidding requirements. c.Defined as all the construction documents issued to bidders before the signing of an owner- contract agreement. d.Only the documents bound in a three – ring notebook.

3.EJCDC is a document which a.Is also called A521 by the AIA. b.Is used to coordinate between construction documents. c.Suggests the primary location for specific information in the construction documents. d.All of the above

3.EJCDC is a document which a.Is also called A521 by the AIA. b.Is used to coordinate between construction documents. c.Suggests the primary location for specific information in the construction documents. d.All of the above

4.The Procurement (Bidding) Requirements include a.The invitation to bid, bid forms, and the agreement. b.The instruction to bidders, the invitation to bid and the bid form. c.The information to bidders, the payment bond and the bid security forms. d.The bid security forms, the information to sub-contractors and the agreement.

4.The Bidding Requirements include a.The invitation to bid, bid forms, and the agreement. b.The instruction to bidders, the invitation to bid and the bid form. c.The information to bidders, the payment bond and the bid security forms. d.The bid security forms, the information to sub-contractors and the agreement.

5.The Contract Documents include a.The contract forms, the bid forms, the specifications and addenda. b.The drawings, the specifications and the information to bidders. c.The conditions of the contract, the drawings and specifications. d.Everything except the contract modifications.

5.The Contract Documents include a.The contract forms, the bid forms, the specifications and addenda. b.The drawings, the specifications and the information to bidders. c.The conditions of the contract, the drawings and specifications d.Everything except the contract modifications.

6.The Contract Forms include a.The agreement. b.The performance and payment bonds. c.The certificates. d.All of the above.

6.The Contract Forms include a.The agreement. b.The performance and payment bonds. c.The certificates. d.All of the above.

7.The Conditions of the Contract include a.The General Conditions. b.The Supplementary Conditions. c.The Conditions to the Bidders. d.All of the above. e.A and B only.

7.The Conditions of the Contract include a.The General Conditions. b.The Supplementary Conditions. c.The Conditions to the Bidders. d.All of the above. e.A and B only.

8.Addenda are a.Changes to the contract documents before the agreement is signed. b.Changes to the contract documents at any time. c.Changes to the contract documents after the agreement is signed. d.None of the above.

8.Addenda are a.Changes to the contract documents before the agreement is signed. b.Changes to the contract documents at any time. c.Changes to the contract documents after the agreement is signed. d.None of the above.

9. The Project Manual Concept a.Was originated by CSI to replace the title “specifications”. b.Provides an organizational format and standard location for all documents involved. c.Includes only the specifications in the bound manual. d.Uses the UniFormat system.

9. The Project Manual Concept a.Was originated by CSI to replace the title “specifications”. b.Provides an organizational format and standard location for all documents involved. c.Includes only the specifications in the bound manual. d.Uses the UniFormat system.

10.What are the three components of project design team coordination? a.Duplication, omissions and discrepancies. b.Division One, Division Two, and Division Three. c.General, Products and Execution. d.Organization, Execution and Quality Assurance.

10.What are the three components of project design team coordination? a.Duplication, omissions and discrepancies. b.Division One, Division Two, and Division Three. c.General, Products and Execution. d.Organization, Execution and Quality Assurance.

11.The general clauses that establish how the project is to be administered are known as: a.Conditions of the Contract. b.General Conditions. c.Supplementary Conditions. d.Addenda.

11.The general clauses that establish how the project is to be administered are known as: a.Conditions of the Contract. b.General Conditions. c.Supplementary Conditions. d.Addenda.

12.On most projects, all of the following are principal entities EXCEPT: a.Contractor. b.Owner c.Electrical Consultant d.Architect/Engineer

12.On most projects, all of the following are principal entities EXCEPT: a.Contractor. b.owner c.Electrical Consultant d.Architect/Engineer

13.For engineering projects, an Architect serves as a consultant to the Engineer: a.Never. b.Sometimes. c.Always. d.Partially.

13.For engineering projects, an Architect serves as a consultant to the Engineer: a.Never. b.Sometimes. c.Always. d.Partially.

14.In 1964, the term “Project Manual” was introduced by the: a.American Bar Association b.American Institute of Architects c.Construction Specifications Institute d.Department of Defense

14.In 1964, the term “Project Manual” was introduced by the: a.American Bar Association b.American Institute of Architects c.Construction Specifications Institute d.Department of Defense

15.As part of the __________, the Agreement is considered a Contract Document: a.Contract Conditions b.Contract Forms c.Bidding Requirements d.Specifications

15.As part of the __________, the Agreement is considered a Contract Document: a.Contract Conditions b.Contract Forms c.Bidding Requirements d.Specifications

16.The Procurement (Bidding) Documents include all of the following EXCEPT: a.Procurement (Bidding) Requirements b.Contract Modifications c.Project Manual d.Drawings e.Addenda

16.The Bidding Documents include all of the following EXCEPT: a.Bidding Requirements b.Contract Modifications c.Project Manual d.Drawings e.Addenda

17.Project specifications should be directed to which of the following: a.The Owner. b.The Contractor. c.Contractors, Subcontractors and material suppliers. d.The Owner’s legal counsel

17.Project specifications should be directed to which of the following: a.The Owner. b.The Contractor. c.Contractors, Subcontractors and material suppliers. d.The Owner’s legal counsel

18. The term “Contract Documents” typically includes: a.Contract Forms. b.Drawings. c.Specifications. d.All of the above.

18. The term “Contract Documents” typically includes: a.Contract Forms. b.Drawings. c.Specifications. d.All of the above.

Answers 1.aa 2.cc 3.cc 4.bb 5.cc 6.dd 7.ee 8.aa 9.bb 10. dd 11. bb 12. cc 13. bb 14. bb 15. bb 16. bb 17. bb 18. dd