Where We Are, And How We Got Here Somersworth School District November 27, 2007.

Slides:



Advertisements
Similar presentations
MACCRAY Elementary Facilities Update meeting Tuesday, June 25, Maynard Community Center, 7:00 pm Wednesday, June 26, Raymond Community Center, 7:00 pm.
Advertisements

New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Design Review Planning to date Project scope summary
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Developing a Flexible Capital Improvements Plan That Serves as a Long-Term Funding Stream VSBA Conference Williamsburg, Virginia November 16, 2006.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III.
Budget March 26, 2012 Jefferson Township Public School District.
Glenvar High School Renovations School Board Presentation
January – May 2013 Existing Curriculum and Space Needs Summary Facilities staff meets individually with all school principals, as well as Academics and.
Jim Ned CISD School Bond Election May 8 th, 2010.
Church Renovation/ Expansion Proposals Willowdale.
Proposed Budget Presentation APRIL 21, 2015.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
“What are some of our moving targets?”. FSD1 Building Program Growth Ken Stevenson’s original program called for all three elementary schools to be a.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
11 School Board Monitoring Report: Capacity Update Arlington Public Schools April 29, 2010.
Brookings School District All Day Kindergarten Update Presentation Contains Projected Data.
Ridgefield School District Capital Facilities Plan March 9, 2010.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
New Market Skills Center Draft 10 Year Major Projects Capital Plan Administrative Council December 2, /02/20111.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Wahoo Public School District Facility Planning Update April 18, 2016.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
Planning for “capital” levy and future “capital” bonds What do you think? CRC staff meeting October 6, 2015 Everett Public Schools 1.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Consolidated Central Office Building
OABCIG General Obligation Bond Referendum Presentation
Cambrian School District March 19, 2015
Community Meeting, July 18, 2016 Update Designs and Phasing
Dedham Public Schools proposed FY14 operating budget
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
School #1 Ballot Question and Proposal
Dr. Joseph Meloche Superintendent of Schools Mrs
Silver Lake Regional High School
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
Welcome! Hodgson Middle School Parent Information Night
2007 Bond Issue Capital Improvement Program
CV Futures Task Force Report May 8, 2017
Pillager Public School District Community Survey Results
Recent Bond Accomplishments
Chimacum District Facility & Program Plan
New Market Skills Center Draft 10 Year Major Projects Capital Plan
Zumbrota-Mazeppa School District Community Survey Results
FY19-28 Capital Improvement Program Request
Presentation transcript:

Where We Are, And How We Got Here Somersworth School District November 27, 2007

3 Reasons for School Improvement  Increasing Enrollment This is not a problem in Somersworth.  Facilities are old, outdated and do not meet new laws and regulations.  “Program Crowding” – New mandates and programs have been added due to new laws, expectations, or changes in society.

Current Facilities Current Enrollment Current Capacity  Hilltop (1927) addition  Maple Wood (1980) Kindergarten addition  Middle School (1962) additions  High School (1956) additions

Studies  1999-Engineering study by Team Design concluded that Hilltop would need plumbing, electrical and HVAC systems replaced if used longer than 5 years  2000 – Space Needs Analysis of All Buildings- Supt’s Report  2001 –New Hampshire School Administrators’ Association- Assessment of educational facility needs K-8

Studies (cont.)  2001 –First Space Needs Committee formed  2004 – Architect experienced in historic school renovations toured Hilltop with the approval of the Space Needs Task Force. Recommended incremental renovations to Hilltop  Fall 2004 – Second Space Needs Committee recommended incremental improvements to HT and an addition of 4 classrooms to HS for SMS students.  2005 – Water pipes froze and broke at Hilltop and the superintendent withdrew the above proposal which was to be submitted to the School Board and City Council.

Studies (cont.)  February 2005 – Superintendent recommended to the City Council that Hilltop be renovated and a new elementary school be built.  Spring 2005 – Joint Building Committee was formed to explore incremental renovations to Hilltop and construction of a new school. No action taken.

Studies (cont.)  January 2006 –Second Joint Building Committee formed and directed to explore potential land and construction options for a new elementary school, and to form a committee to identify alternative uses for Hilltop.  August 2006 – Second Joint Building Committee Recommended that a new elementary school be built  March 2007 – Needs analysis done on the 2 elementary schools

Hilltop Needs  Substandard classroom spaces-less than 900 sq. ft.  Lack of accessibility-elevator, ramps, door handles, bathrooms wheelchair accessible, bubblers  No ventilation in some areas  Crowded hallways  Old, unvented bathrooms  Limited parking

Hilltop Needs (cont.)  Smaller work/instructional spaces lacking 2 egresses  Replace heating system  Replace electrical system-additional amperage required for elevator  Replace plumbing system  Window replacement  Lack of storage  More library space needed  Computer lab space needed  Lacks space for kindergarten

Hilltop Needs (cont.)  Sprinkler system needed  Fire walls needed  School security system needed  Doors open into corridors  Need to meet BOCA codes  First graders need to be on the first floor

It’s More Than Just Hilltop

Maple Wood Needs  Maple Wood Deficiencies – March 2007  Lobby entrance and many corridors are filled with storage and instructional spaces.  Special ed students with mobility handicaps are all sent to MW due to HT’s lack of accessibility.  No computer lab or computer instructional space available.

Maple Wood Needs (cont.)  What was once a conference room, now contains student files, the computer server and guidance office  The nurse’s office is too small, filled with a cot, clothing, and equipment, no waiting area and very limited privacy  Principal’s office is small and used as the facility’s only conference room

Maple Wood Needs (cont.)  Receptionist/Secretaries’ Area- Contains 3 desks, mail room, student waiting area-very tight  Title I room in open area – shared by 4 tutors – should have dedicated space  OT and PT use space in the corridor and closet for student instruction and storage of equipment

Maple Wood Needs (cont.)  PE office is used for paper storage, no shelving, needs dedicated space  Sprinkler room used for storage – Fire violation  Spec. ed, Speech and Language, and ESOL use little rooms off the library where they deal with up to 6 children at a time – too small to function properly

Maple Wood Needs (cont.)  There are 3 desks for the building aides in the library. There should be dedicated space.  The stage is used for music teaching and storage of music stands and equipment. Acoustics are not good when students are in the cafeteria

Maple Wood Needs (cont.)  Up until this year the art teacher went from classroom to classroom, because there was no dedicated space. No room to put projects that students are working on or that require drying. This was changed because a teacher was cut out of the budget. If that position is restored, the art program is back on a cart.

Maple Wood Needs (cont.)  Boiler and electric rooms are used for storage  Kitchen has very limited space for storage.  Security System

Middle School Needs  4 programs are held at the high school due to lack of space  Nurse’s office is too small  Bathrooms need renovating  No conference area for meetings  Very small spaces for specialists where they meet with up to 6 students

Middle School Needs (cont.)  Tutoring is done in the hallways  HVAC units on the roof need to be replaced  No common areas for large groups to meet  The library/media center is undersized and under equipped  Security System

Cost Estimates  Team Design 1999 Engineering Study  Assessment of Educational Facility Needs K  First Space Needs Committee  Second Space Needs Committee  Second Joint Building Committee

Cost Estimates  Team Design 1999 Study Hilltop Elementary School Addition $834,000 (elevators, toilet, stairs) Renovate Existing $1,677,600 Kindergarten Addition $272,400 TOTAL $3,084,000

NHSAA Assessment of Educational Facility Needs K Alternative 1 Renovate Hilltop School $3,000,000 Build new 4/5 school $6,512,000 (14 core classrooms) TOTAL$9,512,385

NHSAA Assessment of Educational Facility Needs K  Alternative 2 Build a new elementary school Discontinue use of Hilltop TOTAL $8,089,260

NHSAA Assessment of Educational Facility Needs K  Alternative 3 Renovate Hilltop Add portables to Hilltop, Maple Wood and Somersworth Middle School Only emergency or temporary, not deemed appropriate at time of Assessment

First Space Needs Committee May 2001 Three Scenarios  Scenario A Renovate Hilltop- add (2) classrooms ($3,546,600) Build new K-5 School ($8,510,400) Total Building Costs:$12,057,000

First Space Needs Committee May 2001 Three Scenarios  Scenario A (cont.)  Total Cost $18,065,483 includes principal, interest, less building aid (2001)

First Space Needs Committee May 2001 Three Scenarios  Scenario B Close Hilltop Maple Wood grades k-2 New 3-5 facility Somersworth Middle School 6-8 $11,433,252 construction costs $17,162,209 total project costs

First Space Needs Committee May 2001 Three Scenarios  Scenario C Renovate Hilltop ($3,546,600) Build new 4-6 School ($11,433,252) $14,979,852 construction costs $22,581,854 total project costs

First Space Needs Committee 2001 Final Recommendation  Scenario A Renovate Hilltop- add (2) classrooms ($3,546,600) Build new K-5 School ($8,510,400) Total Building Costs:$12,057,000

First Space Needs Committee 2001 Final Recommendation  Scenario A (cont.)  Total Cost $18,065,483 includes principal, interest, less building aid (2001)

Second Space Needs Committee 2004 Report to Somersworth School Board October 2004 Critical Capital Improvements to schools $394,850 Incremental Improvements Hilltop (first yr.)$203,410

Report to Somersworth School Board October 2004 Add four additional classrooms to Somersworth High School for middle school programs $532,410 (deducted 58% building aid from 4 classrooms, other costs $26,624) Total$828,824

Revised Second Space Needs Committee Report February 2005 Initial Report withdrawn new recommendation: Adopt Scenario A from 2001 Space Needs Committee Renovate Hilltop Build new elementary School Total$18,065,483

Joint Building Committee Final Report August 2006 Build a new K-5 elementary school no costs given

Somersworth School Board Recommendation November 14,2006 School Board voted to build an elementary school with a core capacity of 425 students Est. costs based on 2008 Dept of Education maximum allowable costs (not including land) Total $9,971,000 *Eligible for 55%building aid

Hilltop Costs 1999 Building Facility Analysis Team Design Addition with elevator Renovate existing Restructure site Kindergarten addition Total$3,084, Updated Projected costs Total$6,118,385

Building Aid Renovations Formula  To qualify at least 25% of cost to replace building  If cost of renovation exceeds 60% of cost of replacing building district must meet all codes and explain why renovation is superior to new construction

Land Acquisition

Department of Education Building Aid Information  Minimum Standards for School Sites 5 acres of contiguous buildable land, plus an additional acre for each one hundred students or fraction thereof. Maximum Standards for School Sites 20 Acres plus one acre per 100 Pupils elementary

Site Location Stackpole Road Size 22 acres ($1,295,000)

Initial Land Studies  Site Inspection  Geotechnical/Environmental site inspection  Archeological Reconnaissance  Land Survey  Boundary Survey

Thank You