F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.

Slides:



Advertisements
Similar presentations
Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
F Tevatron Operations Ron Moore DOE Tevatron Operations Review March 27, 2007 SC-1 Breakout.
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
Weekly Pbar Report 10/2 → 10/9. Stacking This Week …
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Recycler Operations and Studies July 23-30,2008 Meiqin Xiao.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
The LHC - Status Is COLD Is almost fully commissioned
Summary Friday h38: Ramp down and pre-cycle.
Power cut 18kV cable for EMD404/E9 is heating
Summary of Week 11: 14 – 21 March
Stores and Operations Summary Standard Plots
Presentation transcript:

f All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL2 Stores Summary Store Initial Lum. (E30) Deliv’d Lum. (nb -1 ) Termination Duration (hr) Comments Intentional15.3 Stack of 112mA; Not full 53MHz for 1 transfer Intentional17.6 Stack of 174mA (shot 123mA) Abort2.0 Stack of 169mA; ARF1 trip for 2 transfers B4 Fridge excursion led to unstable fridge Intentional22.6 Stack of 111mA Abort5.2 Stack of 121mA QBS Controller failure Intentional16.2 Stack of 101mA Intentional14.6 Stack of 157mA On Going- Stack of 127mA

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL3 Integrated Luminosity for the Week Recovery from shutdown Ice balls Lead failure Leads too cold B4 Fridge stability - Abort Maintenance (await stack)QBS controller Failure - Abort E4 wet engine replaced

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL4 Summary (1) Lost Stores –B4 Fridge excursion of cooldown valve led to an unstable fridge condition which led to abort. May been seeing this problem and have been investigating (1 st store lost to these excursions). –QBS Controller failed on NO A/C bit; aborted store Cool to too Cold –3 ice balls found after power outages and recovery Water is used to regulate temperature (problems last weekend) 1 ice ball due to nitrogen leak; able to reseal –Leads to cold Fafa

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL6 Summary (2) TeV operation not quite recovered –Losses: 150GeV when opening the helix Start of ramp (more than usual) Pbars at flattop; tune adjustments fix –Lifetime is quite a bit smaller than early May TeV maintenance –~12 hours of 3-bumps to locate apertures Have done quick check of ½ of TeV ring C46 bump causes changes in tunes; strong sextupoles –Tunes up the ramp

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL7 Tevatron Losses Total Protons Total Current Total Pbars 2 nd set of Pbars Store 2642 Store 2662 Proton Load Pbar Load Open Helix Ramp 1 st Cogging

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL8 Summary 3 Lost Stack of 60mA –Debuncher vacuum leak closed vacuum valves Other Pbar Problems –Lithium Lens LCW valve problem –Breaker at AP0 trip affecting AP2 and AP3 supplies –95 degree LCW pump tripped –Water leak on A:A1S12 fixed during vacuum repair Busy Proton Source with –Change outs of LRF5 and LRF1 –MH2 regulation –MKS04 Kicker; cable termination –ORBMP water flow valve –Pulse shifter –Continuous tuning of LINAC and Booster SY120: 1 short and 1 longer beam period

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL10 SY120: Last week “spraying into P3” P1 and P2 wires P3 wires

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL11 SY120 Progress: P1+P2 +P3 into transfer hall Made use of E4 fridge replacement to have ~6hrs of beam P3 wires

f All Experimenters' Mtg - 9 Jun 03K. Gollwitzer - FNAL14 Brief Summary The week –Many problems (some recovery related?) –86hrs of stores –TeV maintenance when 2 stores aborted early 1 lost stack –SY120 beam progress FY03 total is 156pb -1 ; 11 weeks to shutdown Goal for this week –Stack and Store Will do at least one between stores TeV maintenance period(s) –Reduction of strong sextupole at C46 –Continue 3-bump aperture scan of TeV