Dr. Hany Abd Elshakour 9/7/2015 10:22 PM1. Dr. Hany Abd Elshakour 9/7/2015 10:22 PM2 Engineering Project: Participants and Life Cycle.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
CE-332 CONSTRUCTION ENGINEERING AND MANAGEMENT
CIVL202 Construction Engineering I
MBA (Trimester) Term V Module Title : Project Finance and Management
INDUSTRIAL & SYSTEMS ENGINEERING
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROJECT DELIVERY SYSTEMS
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Safety and Health Programs
XII- COST CONTROL, MONITORING & ACCOUNTING
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
CHAPTER 19 Building Software.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Lecture 2: Project Participants and Life Cycle
Systems Analysis and Design: The Big Picture
Role and Components of Project Evaluation
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Journeyman  Management  Specialization  Teaching  Owning a business.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
Specification & Quantities Estimating
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Topic1b: Project Life Cycle
SECTION 1 THE PROJECT MANAGEMENT FRAMEWORK
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Preparing the Bid Package (A Developers Perspective)
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Construction of a Transfer Station
TOPIC-9- PROJECT ORGANIZATION
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Planning Planning is considered the most important element of the administrative process. The higher the level of administration, the more the involvement.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Subtitle Statement of Capabilities.
Profession Practices (ECIV-5105)
CHAPTER 5 TECHNICAL ANALYSIS.
PROJECT MANAGEMENT 2 Chu Eu Ho
(Additional materials)
Clinical Engineering Lecture (3).
CHANGING PROJECT DELIVERY SYSTEMS
Introduction DEFINATION :-
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

Dr. Hany Abd Elshakour 9/7/ :22 PM1

Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle

Dr. Hany Abd Elshakour 9/7/ :22 PM3  Project Participants 1. Owner/ Client/ Customer public or private  The owner, whether public or private, is the instigating party that has a need for new facility and that may get the project financed, designed, and built.  Public projects Public owners  Public projects, like schools and hospitals, are built to perform a public function. Public owners must work in accordance with applicable laws and administrative directives pertaining to advertising for bids, bidding procedure, construction contracts, and others.  Private owners private owners private owners  Private owners may be individuals, partnerships, corporations. Most private owners have the structure built for their own use. Some private owners do not intend to be the end users of the constructed facility; rather, they plan to sell, or rent the completed structure to others. 1. Owner/ Client/ Customer public or private  The owner, whether public or private, is the instigating party that has a need for new facility and that may get the project financed, designed, and built.  Public projects Public owners  Public projects, like schools and hospitals, are built to perform a public function. Public owners must work in accordance with applicable laws and administrative directives pertaining to advertising for bids, bidding procedure, construction contracts, and others.  Private owners private owners private owners  Private owners may be individuals, partnerships, corporations. Most private owners have the structure built for their own use. Some private owners do not intend to be the end users of the constructed facility; rather, they plan to sell, or rent the completed structure to others.

Dr. Hany Abd Elshakour 9/7/ :22 PM4  Project Participants 2. Architect-Engineer [A/E]  The A/E is the organization that designs the project that meets the need of the client and that complies with applicable codes.  The A/E can occupy a variety of positions with respect to the owner: in-house  Many public agencies and large corporate owners maintain their own in-house design capability. private and independent  In traditional and most common arrangements, the A/E is a private and independent design firm. branch of construction contractor  Where the “design-construct” mode of construction is used, the owner contracts with a single party for both design and construction. In such cases the A/E is a branch of, or is joined in some way with, the construction contractor. 2. Architect-Engineer [A/E]  The A/E is the organization that designs the project that meets the need of the client and that complies with applicable codes.  The A/E can occupy a variety of positions with respect to the owner: in-house  Many public agencies and large corporate owners maintain their own in-house design capability. private and independent  In traditional and most common arrangements, the A/E is a private and independent design firm. branch of construction contractor  Where the “design-construct” mode of construction is used, the owner contracts with a single party for both design and construction. In such cases the A/E is a branch of, or is joined in some way with, the construction contractor.

Dr. Hany Abd Elshakour 9/7/ :22 PM5  Project Participants 3. Prime (General) Contractor  The prime/general contractor is the business firm that executes the work and delivers the products (facility).  The prime contractor is in prime contract with the owner for the construction of the project, either in its total or for some specialized portion thereof. In this regard, the owner may choose to use a single prime contract or several separate prime contracts.  The prime contractor brings all inputs of the construction process (labor, equipment, materials, subcontractors, information, methods, money and others).  One of the essential functions of the prime contractor is close management of construction. Efficient utilization of resources/inputs is the essence of construction management. 3. Prime (General) Contractor  The prime/general contractor is the business firm that executes the work and delivers the products (facility).  The prime contractor is in prime contract with the owner for the construction of the project, either in its total or for some specialized portion thereof. In this regard, the owner may choose to use a single prime contract or several separate prime contracts.  The prime contractor brings all inputs of the construction process (labor, equipment, materials, subcontractors, information, methods, money and others).  One of the essential functions of the prime contractor is close management of construction. Efficient utilization of resources/inputs is the essence of construction management.

Dr. Hany Abd Elshakour 9/7/ :22 PM6  Project Participants 4. Subcontractor subcontract  A subcontractor is a construction specialty firm that contracts with the prime contractor (a contract called a subcontract) to perform some aspect of the prime contractor’s work (a particular portion of the project).  No contractual relationship is established between the owner and the subcontractor.  Types of work with which the prime contractor is inexperienced or for which he is not properly equipped or has no time are usually subcontracted. 4. Subcontractor subcontract  A subcontractor is a construction specialty firm that contracts with the prime contractor (a contract called a subcontract) to perform some aspect of the prime contractor’s work (a particular portion of the project).  No contractual relationship is established between the owner and the subcontractor.  Types of work with which the prime contractor is inexperienced or for which he is not properly equipped or has no time are usually subcontracted.

Dr. Hany Abd Elshakour 9/7/ :22 PM7  Project Participants 4. Subcontractor Advantages of using subcontractors  Subcontract system is efficient and economical in the use of available resources.  The prime contractor can obtain workers with the requisite skills when they are needed, without the necessity of maintaining an unwieldy and inefficient full-time labor force.  Qualified subcontractors are usually able to perform their work more quickly and at lesser cost than can the general contractor.  Many construction specialties have specific licensing, bonding, and insurance requirements that would be costly for the general contractor to secure for irregular use. 4. Subcontractor Advantages of using subcontractors  Subcontract system is efficient and economical in the use of available resources.  The prime contractor can obtain workers with the requisite skills when they are needed, without the necessity of maintaining an unwieldy and inefficient full-time labor force.  Qualified subcontractors are usually able to perform their work more quickly and at lesser cost than can the general contractor.  Many construction specialties have specific licensing, bonding, and insurance requirements that would be costly for the general contractor to secure for irregular use.

Dr. Hany Abd Elshakour 9/7/ :22 PM8  Project Participants 4. Subcontractor Disadvantages of using subcontractors  Extensive subcontracting can seriously complicate the overall scheduling of job operations, lead to a serious division of project authority, fragmentize responsibility, make the coordination of construction activities difficult, weaken communication between management and the field, foster disputes, and be generally detrimental to job efficiency.  The prime contractor remains responsible under its contract with the owner for any faulty performance by the subcontractor.  The prime contractor assumes complete responsibility to the owner for the direction and accomplishment of the total work including the responsibility of coordination and supervision of the subcontractors. 4. Subcontractor Disadvantages of using subcontractors  Extensive subcontracting can seriously complicate the overall scheduling of job operations, lead to a serious division of project authority, fragmentize responsibility, make the coordination of construction activities difficult, weaken communication between management and the field, foster disputes, and be generally detrimental to job efficiency.  The prime contractor remains responsible under its contract with the owner for any faulty performance by the subcontractor.  The prime contractor assumes complete responsibility to the owner for the direction and accomplishment of the total work including the responsibility of coordination and supervision of the subcontractors.

Dr. Hany Abd Elshakour 9/7/ :22 PM9  Project Participants Other project participants (stakeholders) include:  Users of construction facilities,  Materials suppliers,  Equipment manufacturers,  Labor organizations,  Government regulatory agencies,  Investors and banks  …………………… Other project participants (stakeholders) include:  Users of construction facilities,  Materials suppliers,  Equipment manufacturers,  Labor organizations,  Government regulatory agencies,  Investors and banks  ……………………

Dr. Hany Abd Elshakour 9/7/ :22 PM10  Project Life Cycle traditional Six basic phases contribute to the traditional development a construction project from an idea to reality.. These functions are interrelated. traditional Six basic phases contribute to the traditional development a construction project from an idea to reality.. These functions are interrelated. 1.Concept and Feasibility Studies 2.Engineering and Design 3.Procurement 4.Construction 5.Start-up and Implementation 6.Operation or Utilization 1.Concept and Feasibility Studies 2.Engineering and Design 3.Procurement 4.Construction 5.Start-up and Implementation 6.Operation or Utilization

Dr. Hany Abd Elshakour 9/7/ :22 PM11  Project Life Cycle 1. Concept and Feasibility Studies need  Recognition of a need for a new facility. owner requirements  Project definition involving establishing broad project characteristics such as location, performance criteria, size configuration, layout, equipment, services, and other owner requirements. constraints  Project constraints (finance, budget, time,..).  Conceptual analyses, process development, …. feasibility studies  Technical, economical, financial, political, social and marketing- oriented feasibility studies and environmental impact reports. 1. Concept and Feasibility Studies need  Recognition of a need for a new facility. owner requirements  Project definition involving establishing broad project characteristics such as location, performance criteria, size configuration, layout, equipment, services, and other owner requirements. constraints  Project constraints (finance, budget, time,..).  Conceptual analyses, process development, …. feasibility studies  Technical, economical, financial, political, social and marketing- oriented feasibility studies and environmental impact reports.

Dr. Hany Abd Elshakour 9/7/ :22 PM12  Project Life Cycle 2. Engineering and Design Engineering and design have two main phases:  Preliminary Engineering and Design  Detailed Engineering and Design Preliminary Engineering and Design:  This phase stresses architectural concepts, evaluation of technological process alternatives, size and capacity decisions, and comparative economic studies.  This phase result in a set of preliminary plans and specifications that are first subject to review and refinement.  The review focuses on seeking approval from owner, sources of external financing, regulatory bodies that look for compliance with zoning regulations, building codes, licensing procedures, safety standards, environmental impact, etc. 2. Engineering and Design Engineering and design have two main phases:  Preliminary Engineering and Design  Detailed Engineering and Design Preliminary Engineering and Design:  This phase stresses architectural concepts, evaluation of technological process alternatives, size and capacity decisions, and comparative economic studies.  This phase result in a set of preliminary plans and specifications that are first subject to review and refinement.  The review focuses on seeking approval from owner, sources of external financing, regulatory bodies that look for compliance with zoning regulations, building codes, licensing procedures, safety standards, environmental impact, etc.

Dr. Hany Abd Elshakour 9/7/ :22 PM13  Project Life Cycle 2. Engineering and Design Detailed Engineering and Design It is the process of:  Breaking down, analyzing, and designing the structure and its elements so that it complies with recognized standards of safety and performance.  The various technical disciplines involved are: architectural design, structural design, civil design, piping design, electrical design, mechanical design……  Rendering the design in the form of a set of explicit drawings and specifications that will tell the constructors exactly how to build the structure in the field. 2. Engineering and Design Detailed Engineering and Design It is the process of:  Breaking down, analyzing, and designing the structure and its elements so that it complies with recognized standards of safety and performance.  The various technical disciplines involved are: architectural design, structural design, civil design, piping design, electrical design, mechanical design……  Rendering the design in the form of a set of explicit drawings and specifications that will tell the constructors exactly how to build the structure in the field.

Dr. Hany Abd Elshakour  Project Life Cycle 3. Procurement Procurement involves three major types of activities:  Tendering, and contracting for services of general construction contractors.  Subcontracting for services of specialty construction contractors.  Ordering, expediting, and delivering of key project equipment and materials required to construct the project. 3. Procurement Procurement involves three major types of activities:  Tendering, and contracting for services of general construction contractors.  Subcontracting for services of specialty construction contractors.  Ordering, expediting, and delivering of key project equipment and materials required to construct the project.

Dr. Hany Abd Elshakour 9/7/ :22 PM15  Project Life Cycle 4. Construction  Construction is the process of erecting the project, whereby designers’ plans and specifications are converted into physical structures and facilities.  It involves the organization and coordination of all the resources for the project to complete the project  on Schedule,  within the Budget,  according to the Standards of Quality and Performance specified by the A/E, and  Safely 4. Construction  Construction is the process of erecting the project, whereby designers’ plans and specifications are converted into physical structures and facilities.  It involves the organization and coordination of all the resources for the project to complete the project  on Schedule,  within the Budget,  according to the Standards of Quality and Performance specified by the A/E, and  Safely

Dr. Hany Abd Elshakour 9/7/ :22 PM16  Project Life Cycle 5. Start-up and Implementation  Much Inspection and testing of components are done while the project is underway.  As the project nears completion, it is important to be sure that all components function well together as a total system.  This involves testing, adjusting, and correcting the major electrical, piping and mechanical systems so that they perform at their optimum level.  This phase involves a Warranty Period during which the designer and the contractors can be called back to correct problems that were not immediately evident upon initial testing and to make adjustments to better suit the facility to the owner’s needs after he has had a chance to try it out. 5. Start-up and Implementation  Much Inspection and testing of components are done while the project is underway.  As the project nears completion, it is important to be sure that all components function well together as a total system.  This involves testing, adjusting, and correcting the major electrical, piping and mechanical systems so that they perform at their optimum level.  This phase involves a Warranty Period during which the designer and the contractors can be called back to correct problems that were not immediately evident upon initial testing and to make adjustments to better suit the facility to the owner’s needs after he has had a chance to try it out.

Dr. Hany Abd Elshakour 9/7/ :22 PM17  Project Life Cycle 6. Operation and Utilization During operation and utilization phase, following activities are to be performed:  Operating the facility by public works staffs, skilled engineers and technicians and others.  Maintenance and repairs of the facility and its constituent parts.  Expansions and alterations. 6. Operation and Utilization During operation and utilization phase, following activities are to be performed:  Operating the facility by public works staffs, skilled engineers and technicians and others.  Maintenance and repairs of the facility and its constituent parts.  Expansions and alterations.

Dr. Hany Abd Elshakour 9/7/ :22 PM18