Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.

Slides:



Advertisements
Similar presentations
Special Recognition Cheryl Wilson, State Auditor and Inspectors Office Presented by Ann Embree and Sherri Schieffer County Training Program and Oklahoma.
Advertisements

Construction Contracting
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
RFP PROCESSES Contracts for Professional Services.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Chapter 3 Project Initiation
Marcy Mealy Procurement Specialist CDBG Program
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
School District Purchasing. Purchasing Authority Arizona Statutes Arizona Statutes Arizona Administrative Code Arizona Administrative Code  Primary source.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
AWPHD Legislative Summary House Bill 1196: Increasing the dollar limit for small works roster projects House Bill 1847: Increases bid limits for public.
Request For Proposals (RFP) Process Board of Directors Special Meeting January 29, 2014.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
I heard it through the Grapevine….PIM 29 Presented by Gladys Right and the PIMS.
LEGISLATIVE REQUIREMENTS FOR UNSOLICITED PROPOSALS FLORIDA COUNCIL FOR PUBLIC/PRIVATE PARTNERSHIPS OCTOBER 3, 2013 Lee A. Weintraub, Esq. Becker & Poliakoff,
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Meet DES Curtis Pate Roland Orr Engineering & Architectural Services Delegated Contracting Authority.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Construction Management At Risk Process
Department of Property and Procurement Division of Procurement Property & Procurement Economic Development Seminar Friday & Saturday, May 6 & 7, 2016.
Small Purchase of Professional Service Providers Administrative Rule R
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Introduction to Procurement for Public Housing Authorities Competitive Proposals.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
GOVERNOR’S OFFICE OF CRIME CONTROL & PREVENTION REQUEST FOR PROPOSALS (RFP) SOLICITATION NO. DEXR Maryland – Statewide Victims Services Needs Assessment.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Light Rail Transit Project
CM at Risk v. Design-Bid-Build
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Request for Proposal - Best Value
Consultant Selection Training
Project Delivery Systems
Request for Proposal - Best Value
Architectural Services RFQ
PROJECT DELIVERY METHODS
Procurement.
Procurement Planning Mani Ram Gelal
OCPS CCNA SELECTION COMMITTEE TRAINING
Presentation transcript:

Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project for schools and other state entities. Design build, job order contracting, or Construction Manager at Risk (CMAR) was created. This eliminates the long process of the conventional construction methods, bid for design, bid for construction Other states had the this procedure available before the State of Arizona

Design Build, Job Contracting, or Construction Manager at Risk Laws 2010, Chapter 283 and procurement rule R is the procedure for CMAR, Design Build, and Job Order Contracting. The current ARS includes the revised version of Laws 2010, Chapter 283 The first step of he process is to advertise a request statements of Qualifications (SOQ) as required by ARS Two consecutive publications if it is a weekly newspaper. 2. Two publications at least six but not more than ten days apart if it is a daily newspaper. The request for the SOQ is similar to a RFQ

Design Build, Job Contracting, or Construction Manager at Risk The request for qualifications shall include all of the following: 1. The minimum qualifications of the CMAR. 2. A scope of work statement and schedule. 3. Documents defining the project requirements. 4. The form of contract to be awarded. 5. The selection criteria for compiling a short list and the number of firms to be included on the short list. At least three but not more than five firms shall be included on the short list. 6. A description of the phase two requirements and subsequent management needed to bring the project to completion. 7. The maximum time allowable for design and construction. 8. The department's estimated cost of design and construction.

Design Build, Job Contracting, or Construction Manager at Risk During phase one, and before solicitation, the director shall appoint a selection team of at least three persons. At least one-half of the selection team shall be architects or engineers. The selection team members may be either school employees or outside consultants. The selection team shall also include at least one person who is a senior management employee of a licensed contractor who is not involved in the project. Any architect or engineer who is serving on the selection team and who is not a school district employee shall not be otherwise involved in the project. A person who is a member of a selection team shall not be a contractor under the contract or provide construction, construction services, material or services under the contract.

Design Build, Job Contracting, or Construction Manager at Risk The selection committee must evaluate the qualifications and performance data submitted in response of the school’s request for qualifications The School must include in the RFQ that interview will be held regarding the contract and the methods of approach for furnishing the construction services. In the RFQ a criteria for evaluation is included and the selection committee shall rate each submission of the RFQ. If a short list of at least 3 contractors can be established personal interviews may be required to determine the most qualified contractor

Design Build, Job Contracting, or Construction Manager at Risk A sample evaluation may look like shown below

Design Build, Job Contracting, or Construction Manager at Risk If in the opinion of the selection committee proposals are non- responsive it may have to be re-advertised. For construction-manager-at-risk construction services, the contract under a request for qualifications solicitation is limited to a specific single project. If there are three or more remaining persons or firms, the School shall proceed with the selection process If the contract is for construction-manager-at-risk construction services and includes preconstruction services by the contractor, the School shall enter into a written contract with the contractor for preconstruction services under which the School shall pay the contractor a fee for preconstruction services in an amount agreed by the department and the contractor

Design Build, Job Contracting, or Construction Manager at Risk The School shall not request or obtain a fixed price or a guaranteed maximum price for the construction from the contractor or enter into a construction contract with the contractor until after the department has entered into the written contract for preconstruction services and a preconstruction services fee. Construction shall not commence until the department and contractor agree in writing on either a fixed price that the department will pay for the construction to be commenced or a guaranteed maximum price for the construction to be commenced. THE CONSTRUCTION TO BE COMMENCED MAY BE THE ENTIRE PROJECT OR MAY BE ONE OR MORE PHASED PARTS OF THE PROJECT

Design Build, Job Contracting, or Construction Manager at Risk The School shall award the contract to the responsive and responsible offeror whose proposal receives the highest score under the method of scoring in the request for proposals. No other factors or criteria may be used in the evaluation. For each project under a construction-manager-at-risk construction services contract, the licensed contractor performing the contract shall perform, with the contractor's own organization, construction work that amounts to not less than forty per cent of the total contract price for construction.

Design Build, Job Contracting, or Construction Manager at Risk The total contract price for construction does not include the cost of preconstruction services, design services or any other related services or the cost to procure any right-of-way. EACH PROCUREMENT AND EACH REQUEST FOR QUALIFICATIONS PURSUANT TO THIS SECTION IS LIMITED TO A SINGLE CONTRACT FOR CONSTRUCTION-MANAGER-AT-RISK CONSTRUCTION SERVICES Notwithstanding anything to the contrary in this title, the department shall not enter into a contract as contractor to provide construction-manager-at-risk construction services

Design Build, Job Contracting, or Construction Manager at Risk Except as otherwise provided in this section, sections and , relating to bid, performance and payment bonds, change orders, progress payments, contract retention, definitions and authority to award contracts, apply to School’s construction-manager-at-risk.

Design Build, Job Contracting, or Construction Manager at Risk Questions? Comments