The Importance of Thinking Strategically Tribal Development Seminar November 30, 2010 Steve Walker, Managing Director Heartland, LLC.

Slides:



Advertisements
Similar presentations
Topic 2 :: Business Strategies Mrs. Schroeder
Advertisements

MAPP Process & Outcome Evaluation
1 Open PepsiCo 2009 Ian Noble R&D Director Foods Innovation.
Planning: Processes and Techniques
Prompts Consider the following questions as you build this slide:
Basic Concepts of Strategic Management
Alisdair McGregor, PE, LEED AP Principal, Arup Fellow, Arup Analyzing the District – Part II.
Continuous Value Enhancement Process
Module 5: Session 3 M5S31. Training objective: Developing financing proposals for road contractors Training outcome: 1) By the end of the session trainees.
Chapter 14 Assessing the Value of IT. Traditional Financial Approaches  ROI – Return on Investments Each area is considered an investment center ROI.
IT Governance Navigating for Value Michael Vitale 6 May 2003 CIO Conference Steering the Enterprise Through Stormy Seas Image source: Access2000.
Planning and Strategic Management
Rational Unified Process
Weaving Marketing into the Fabric of the Firm
Organization Development and Change
CONTACT SEMINAR November 2008 Project management tools.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
ENTR 452 (Business Plan Slides, Chapter 7)
Planning and Strategic Management
NextEnd. Preparation of Business Plan for Setting up Enterprise Business Plan.. The business plan is a written document prepared by the entrepreneur that.
Leaders Facilitate the Planning Process
Sustainable Tourism development
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
21st Century Skills Initiatives
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Asset Management January 15, 2013.
Industrial Engineering Primary Responsibilities within the Service Industry Institute of Industrial Engineering Industry Advisory Board Business Planning.
Community Development & Planning Grant Pre-Application Meeting April 17,
Organizational competence in harnessing IS/IT
Objectives: 1. To learn why advocacy is one of the roles of CSOs. 2. To learn the process for developing an effective strategic advocacy campaign 3. To.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Investment Policies in Russia: The Northern Dimension by Rainer Geiger Deputy Director, OECD Financial and Enterprise Affairs The Northern Dimension Forum.
Envisioning the Future of Minnesota Transportation Finance Advisory Committee April 20, 2012.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Welcome to Session 3 – Project Management Process Overview
Chapter 1 The Nature of Strategic Management
2 THE BROKER’S ROLE IN SUSTAINABLE COMMERCIAL PROPERTY.
Feasibility Study.
1 Southwest Renewable Energy Conference A Utility for the 21st Century Building a Sustainable Utility September 15, 2010.
Sustainability and Indicators at EPA Ecoinformatics Meeting June, 2007 Copenhagen William Sonntag w/credit to Ethan McMahon Office of Environmental Information.
Chapter 8 The Marketing Plan McGraw-Hill/Irwin
The Business Plan: Creating and Starting the Venture
General remarks Goal of the presentation Illustration of the business in a concise way Visual support for your pitch The prompts and tips should be addressed.
Next Generation Science Standards “Taking the Steps to Implement NGSS” March 29, 2013 TEEAM Conference.
Chapter 8 - Integrative Process
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Getting to the Root of the Problem Learn to Serve 501 Commons November 6, 2013 Bill Broesamle.
Three Rivers District Council Corporate Peer Challenge Feedback from the peer challenge team September
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
Corporate Strategy and Entrepreneurship – Chapter 8
Robert P. King Department of Applied Economics April 14, 2017
Strategic Information Systems Planning
Projects, Events and Training
WHAT IS CLEAN ENERGY DC? WHAT IT IS WHAT IT IS NOT
MGT 498 TUTORIAL Success trials - mgt498tutorial.com
MGT 498 Education for Service-- snaptutorial.com.
MGT 498 EDU Lessons in Excellence-- mgt498edu.com.
MGT 498 TUTORIAL Lessons in Excellence -- mgt498tutorial.com.
MGT 498 Education for Service-- snaptutorial.com
MGT 498 TUTORIAL Education for Service--mgt498tutorial.com.
MGT 498 Teaching Effectively-- snaptutorial.com
MGT 498 EDU Education for Service-- mgt498edu.com.
CORPORATE MANAGEMENT IN ACTION - CMA
Planning for District Success.
KNOWLEDGE MANAGEMENT (KM) Session # 36
Thinking About Optimizing Value
MODULE 11: Creating a TSMO Program Plan
Strategy, Organization Design, and Effectiveness
Presentation transcript:

The Importance of Thinking Strategically Tribal Development Seminar November 30, 2010 Steve Walker, Managing Director Heartland, LLC

Pursuing development strategically includes employing a rigorous methodology to evaluate and manage the develop process. The most successful developments are visionary, creative, carefully planned and effectively implemented. Real estate development plans are business plans and should function as a road map, stating what the destination is, describing the process to get there, and anticipate and prepare for when roadblocks arise and detours are required. 2

Thinking Strategically  Context  Clear Vision and Project Objectives  Measurable Goals  Due Diligence/Feasibility Process  Design and Development Team  Implementation Process  Management Tools 3

Context Past development practices:  Design of infrastructure and building systems predominantly by engineering community.  Focus – optimizing efficiencies of land plan, roads, utilities and buildings.  Market, operations and financial analysis and aesthetics often secondary.  Overriding emphasis on costs, sourcing financing and construction. 4

Context Forward development practices:  Development focus broadened to address social, cultural, economic, ecological, community and lifestyle issues.  Financial performance – initial, mid-term and long- term  Approach requires leadership vision, a holistic methodology and decision making process and multidisciplinary design and development team.  Management tools to quantify and measure these evaluation metrics. 5

Context As a society we are increasingly focused on understanding the limits of our natural resources, the threat of climate change, and more recently the social and economic repercussions of this recession. Sustainability has become more than just the latest buzzword - a reset button has been pushed, a paradigm shift has occurred. Sustainability is now one of the core values and filters that people view development. We are increasingly thinking seven generations in the future. 6

Clear Vision and Project Objectives  What is the purpose for this development?  Who is it for?  What is the market demand that it will fulfill?  Why is this the right place?  What is the right project for this location?  What is the development aesthetic?  Why will people come here and how will they use this place?  How is success to be measured – financial, sustainability, community, and lifestyle performance? 7

Measurable Goals Like any business plan, the development plan should:  Establish the desired outcomes.  Identify measurable goals for the specific project and the metrics of how these goals are to be evaluated throughout the stages of predevelopment feasibility, development phases, leasing, operations, and sale(s) (if applicable). 8

Measurable Goals  Financial Performance What are the “financial” metrics that the project should be evaluated to?  Community What are the “community” project goals during predevelopment, horizontal development, vertical construction and operations?  Lifestyle What are the “lifestyle” project goals? How will people interact and experience this place? Why will they return? Why will they live, work and recreate here? Development is more than buildings it is the total place 24/7.  Sustainability What are the “sustainable” project goals during predevelopment, horizontal development, vertical construction and operations? 9

Growth Projections (5,10,15 Year Estimate) District Growth Potential (5,10,15 Year Estimate) Financial Feasibility Sub-Model Topic Area Sub-Models Transportation Water Energy Solid Waste Performance Benchmarks Baseline (BAU) Good Better Best Alternative Scenarios for Sub- Model Roll Up Growth Scenario Performance Benchmarks Cost (Uses) Revenue (Sources) Partnerships Financial Performance IRR/ROI Payback Periods Benefit per Cost Net Cash Identify Optimum Sustainable Strategy EXTERNAL FACTORS + INTERNAL FACTORS OPTIMIZED SCENARIO 10 Sustainability Strategy Measurable Goals

Due Diligence/Feasibility Process  Opportunities and Constraints Analysis  Physical  Market  Political  Regulatory  Alternative Analysis  Financial Pro Forma and Sensitivity Analysis  Evaluate project alternatives  Sensitivity of financial performance to changes in project assumptions  Realistic and Flexible Program  Flexibility in types of uses, densities, sizes, heights, parking and phasing  Flexibility in land plan to respond to changing market conditions  Phasing to Manage Cash Outlay and Product Diversification to Maximize Absorption  Phasing – land plan, infrastructure plan and building plan  Phase Cash Outlays - match near-term absorption and revenues  Maximize Breadth and Depth of Uses and Products – accelerate absorption and revenues 11

Design and Development Team Integrated Design and Development Team that gets it:  Design and Project Management  Architecture  Land Planning  Engineering  Landscape Architecture  Science Disciplines 12

Design and Development Team Assembling the right design and development team upfront and providing it with the right leadership and direction is the most important step in achieving a successful development. 13 Performance Cost Initial Planning Stage Construction Phase The least cost/maximum ability to positively affect the financial cost and performance of a potential development is during the initial planning stages.

Implementation Process 14 Vision Vetted through Feasibility Preferred Program & Strategy Project Team Assignments Concept Development Design Development Construction Documentation Entitlements Financing Land Development Construction Commissioning Operations Leasing Sales Collaborative Process Critical Thinking

Management Tools The extent and complexity of the tools to manage a development project vary with the demands of each project.  File Management System  Contact List  Due Diligence/Feasibility Check List  Pro Forma (including detailed integrated budgets for predevelopment, development, vertical construction, operations or operating subsidies, financing, revenues and sensitivity analysis)  Critical Path/Timeline  Building Budgets for Specific Vertical Building Projects  Critical Path for Specific Vertical Building Projects  Sustainability Performance Model  Community and HOA Budgets 15

We live in a very challenging and exciting time. New thinking, innovation and informed risk taking are core ingredients to moving forward with successful developments. No one has all of the answers, the goal is to know what are the critical questions to ask. 16 Strategic Thinking Measurable Goals Clear Vision Due Diligence/ Feasibility Methodology Design & Development Team Implementation Plan Management Tools