BELENE NPP Reactor plant V-466B FSUE OKB «GIDROPRESS» Ryzhov S.B., Ermakov D.N., Repin A.I. May, 2008.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
May 2010 FEDERAL SCIENTIFIC PRODUCTION CENTER JSC “Afrikantov OKBM” EFFECTIVENESS EVALUATION FOR THE FAST SODIUM- COOLED REACTOR DESIGN SOLUTIONS AND THEIR.
GENERATION III AND III+ NUCLEAR POWER PLANT DESIGNS ACR-1000 (Advanced CANDU Reactor) Dr. Şule Ergün Hacettepe University Department of Nuclear Engineering.
IAEA International Atomic Energy Agency Overview of CANDU Reactor Technology and the CANDU 9 Simulator Matthias Krause Nuclear Power Technology Development.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
CRP on Natural Circulation Phenomena, Modelling and Reliability of Passive Safety Systems that Utilize Natural Circulation September, 2007, IAEA,
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
Steam Power Plant.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Lyon, October Sophie.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
POWER PLANT.
Authorized selling agent for S.E. Asia & Middle East M/s. JIT Engineering & Solutions Pte. Ltd., Singapore. Magnetic Impelled Arc Butt Welding (MIAB) NO.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Nuclear Fundamentals Part II Harnessing the Power of the Atom.
INTERNATIONAL CONFERENCE ON FIFTY YEARS OF NUCLEAR POWER – THE NEXT FIFTY YEARS 27 June – 2 July 2004 NUCLEAR POWER SAFETY: THE PRESENT AND ASSURANCE FOR.
INTRODUCTION Definition:
Nuclear Reactors and Nuclear Energy Conversion of mass-energy to electrical energy mass-energy  thermal  kinetic  electric Produces large amounts of.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
1 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety September 24-29, 2007, Yalta, Crimea, Ukraine FUEL PERFORMANCE AND OPERATION EXPERIENCE.
Nuclear Research Institute Řež plc 1 DEVELOPMENT OF RELAP5-3D MODEL FOR VVER-440 REACTOR 2010 RELAP5 International User’s Seminar West Yellowstone, Montana.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
1 Presentation L.Kupca Podolsk May 2007 AGEING MANAGEMENT OF SAFETY RELATED COMPONENTS OF WWER-440 UNITS OPERATED IN SLOVAK REPUBLIC The 5-th International.
Kevin Burgee Janiqua Melton Alexander Basterash
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
Priority Programs of the Nuclear Power Industry Branch of Russia Vladimir Asmolov 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Thermal Hydraulic System Experiment
Experience of fuel operation at Russian NPPs N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich, А.К. Egorov N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich,
Experience of new fuel assembly operation and perspectives of fuel cycle development for for NPP with VVER Author: Мokhov V. А. International scientific.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
R 2.09/96, LBB of VVER-1000 NPP TACIS Project: R8.01/98 - DISSEMINATION OF RESULTS: "TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS" Tacis R2.09/96, “LBB.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
ERMSAR 2012, Cologne March 21 – 23, 2012 Authors: PANTYUSHIN S.I., FRIZEN Е.А., SEMISHKIN V.P., BUKIN N.V, BYKOV M.А., MOKHOV V.А. (OKB «GIDROPRESS», Podolsk.
Nuclear Research Institute Rez plc. Division of Integrity and Technical Engineering BULATOM June LESSONS LEARNED FROM AGING MANAGEMENT ACTIVITIES.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Nuclear Power Plant How A Nuclear Reactor Works.
Reactor pressure vessels of WWER (materials and technology) Janovec, J
1 State Scientific and Technical Center on Nuclear and Radiation Safety THE THERMAL-MECHANICAL BEHAVIOR OF FUEL PINS DURING POWER'S MANEUVERING REGIME.
Investigation of 15kh2NMFAA steel and weld after irradiation in the “Korpus” facility on the RBT-6 reactor D. Kozlov, V. Golovanov, V. Raetsky, G. Shevlyakov,
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
Tacis 1.14/91 on life-time evaluation TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R1.14/91,
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
NUCLEAR REACTORS G. HETSRONI Emeritus Danciger Professor of Engineering Technion – Haifa – Israel.
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
CONTROL AND SAFETY of Nuclear Steam Supply Systems (NSSS)
REACTOR PRESSURE VESSEL
Magnetic Impelled Arc Butt Welding
INDUSTRIAL HYDRAULICS
Project General Data Beneficiary: Rosenergoatom
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
EDF 3-loop RPV life management beyond 40 years of operation
Pressurized Water Reactor
Tutorial Irradiation Embrittlement and Life Management of RPVs
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
Session Name: Lessons Learned from Mega Projects
VICTOR HUGO SANCHEZ ESPINOZA and I. GÓMEZ-GARCÍA-TORAÑO
Nuclear Power Plants.
(INDIAN PRESSURISED WATER REACTOR) Distinguished Scientist & RRF
Nuclear Power Plants.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Generation of Most Eligible Steam for Rankine Cycle
A study on Loviisa NPP (VVER-440) dose rate measurement's ability to detect small primary-to-secondary coolant leaks A. Ketolainen ISOE European Symposium.
Presentation transcript:

BELENE NPP Reactor plant V-466B FSUE OKB «GIDROPRESS» Ryzhov S.B., Ermakov D.N., Repin A.I. May, 2008

2 FSUE OKB "GIDROPRESS"  Federal State Unitary Enterprise, Experimental and Design organization “Gidropress”, as the General design organization for reactor plants, is engaged in development of designs of equipment and systems, intended for power engineering and nuclear engineering for more than half a century.  Using projects, developed by OKB “Gidropress” more 85 reactor plants of different types have been constructed.  Our designs have been implemented at the nuclear power facilities in Russia, Bulgaria, Ukraine, Czech Republic, Finland, Germany, Hungary, Slovakia, Armenia, China, India.

3 FSUE OKB "GIDROPRESS" FSUE OKB "GIDROPRESS" has licenses for performance of work issued by nuclear safety authorities of Russia:  designing of reactor plants with water-cooled water- moderated power reactors and reactors with liquid- metal coolant for nuclear power plants (units of nuclear plants);  designing of equipment and pipelines for reactor plants of nuclear power stations, structures and complexes with research nuclear reactors;  manufacture of equipment for nuclear power plants and complexes with research nuclear reactors designing of reactor plants with water-cooled water- moderated power reactors and reactors with liquid- metal coolant for nuclear power plants (units of nuclear plants);

4 Advanced reactor plant VVER-1000(V-466B ) Since the moment of RP V-320 development the successful progress has been made for the concept of RP VVER There were developed the designs of RP V-392 for A-92 NPP(of improved safety), RP V-428 (in operation in China), RP V-412 (under implementation in India). A number of design improvements have been made in the above- mentioned projects concerning equipment and systems that facilitated reaching the safety level that meets the up-to- date NEC and international requirements and IAEA recommendations In there was performed an assessment of AES- 92 project concerning EUR requirements of revision С. Assessments were performed by western experts with participation of project designers. As a result of this work a good conformity of the project with the specified requirements was determined

5 Basic Changes in the Design Basic Changes in the Design (1)  advanced reactor (service life-60 years).  up-to-date fuel cycle on the basis of usage of fuel assemblies (FA-A or FA-2) with uranium-gadolinium fuel of latest modifications providing high fuel burnup;  application of new SGs (service life-up to 60 years)  application of new Reactor coolant pumps  application of new CPS drives ShEM-3  implementation of additional passive safety systems  corium localization device (core-catcher) and changes in arrangement of the reactor pit equipment and in design of some of its components  Design RP main equipment service life - 60 years

6 Basic Changes in the Design Basic Changes in the Design (2)  application of up-to-date digital I&C (including latest modifications of Monitoring Control and Diagnostic System (MCDS), neutron flux monitoring equipment (NFME), Control and Protection System (CPS), emergency level gauge);  implementation of PRZ PORV control procedure under beyond design basis accidents (implementation of feed and bleed procedure);  using of up-to-date automatic systems for RP main equipment inspection;  justification of “leak-before-break” concept for the main RP pipelines and application of the required leak detection systems;  usage of removable modular thermal insulation;

7 Basic Changes in the Design Basic Changes in the Design (3)  implementation of up-to-date surveillance programme with placing the surveillance specimens on the reactor vessel;  extension of the operation period of RP main equipment between technical inspections  using of fuel handling machine with the increased rates of FA horizontal and vertical motion;  using of sipping method in performing check of leak tightness of fuel rod claddings with keeping the traditional method of leak check of claddings  using the reactor main joint power nut driver with simultaneous elongation of all studs, as well as of nut drivers for detachable joints of steam generators, pressurizer, ECCS accumulators ;

8 Principal lay-out of the reactor plant

9 Arrangement of Reactor in Concrete Pit

10 Advanced Reactor

11 Advanced Reactor The improvements include:  lengthening the advanced reactor vessel by 300 mm at the expense of lengthening the supporting shell;  increase in the number of CPS CRs;  increase of diameter of reactor vessel;  using the CPS drive ShEM-3;  completely new surveillance programme (arrangement of the irradiated surveillance specimens directly on RPV wall  limitation of nickel content in welds and of harmful impurities in base metal and welds  reducing Тко of nozzles zone shells to minus 35оС

12 CPS drive ShEM-3

13 CPS drive ShEM-3  power electromagnetic system is optimized and dynamic drive characteristic is improved under motion conditions  drive service life (mechanical part) is extended up to 40 years whereas the prototype mechanical part has a service life of 20 years, service life of electromagnets – 10 years and that of position indicator – 5 years  pulling force is increased (  twice as much)  PPI is used with indication of pitch position each 20 mm of extension shaft motion (LPI in ShEM drive provides indication of position of extension shaft with 350 mm pitch)  One drive seal (instead of two in prototipe design)

14 Steam generator (spaced corridor arrangement of tubes)

15 Steam generator (spaced corridor arrangement of tubes)  increase circulation rate in the tube bundle that will reduce probability of damage of heat exchanging tubes due to decrease in the growth rate of deposits on the heat exchanging tubes and degree of concentration of corrosion-active impurities under them  reduce possibility of clogging the intertube space with spalled sludge  make easy access into intertube space for inspection of heat exchanging tubes and their cleaning in necessity  increase water inventory in steam generator  enlarge the space under the tube bundle for easy removal of the sludge  Drop of Coolant headers stress;  Improvement of SG heat exchanging tubes manufacturability and maintainability

16 Reactor Coolant Pump Set

17 Reactor Coolant Pump Set  main thrust bearing with water cooling and lubricant  double-speed electric motor, that reduces loads to transformer during startup (this provides the possibility of stepwise startup)  seal, which is capable to provide non-exceeding of nominal leakage (50 L/h) during RCP set trip without cooling for 24 hours at nominal parameters of the primary circuit

18 Main Reactor Plants Data Comparison

19 Main Reactor Plants Data Comparison

20 Main Reactor Plants Data Comparison

21 Main Reactor Plants Data Comparison

22 Conclusion  RP design meets the up-to-date requirements and can be licensed for construction