Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental.

Slides:



Advertisements
Similar presentations
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Advertisements

Airport planning.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013.
US West Coast Lafarge North America – Port of Redwood City Confidential1 Lafarge USWC Presentation for: Port or Redwood City Board of Commissioners.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
11 Tunde Balvanyos, Ph.D. Bus Rapid Transit Coordinator, Pace APTA BRT May 2009.
CVE 312 TRANSPORTATION ENGINEERING. INTRODUCTION Teaching Approach & Grading Policy Course Outline  Introduction to Transportation Engineering  Modes.
Analysis of Multi-Modal Strategies on Interregional Traffic in the I-580 Corridor in Northern California ITE Western District Annual Meeting June 25, 2012.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Elizabeth Sall Maren Outwater Cambridge Systematics,
San Mateo Rail Corridor Transit Oriented Development Plan ABAG/MTC/ULI Workshop September 29, 2006.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Service Integration: Service Integration for Our Grandkids Jim Allison Manager of Planning Capitol Corridor.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
DIVISION OF PORTS AND HARBORS PORTSMOUTH, NEW HAMPSHIRE Captain Geno J. Marconi, Port Director.
Transportation System Performance Measurement. MDOT’s First Transportation System Performance Report  Next Generation Road & Bridge Goals  Other Aspects.
Capital city ports – coping with growth BTRE introduction Godfrey Lubulwa Maritime and Rail Statistics, BTRE BTRE Transport Colloquium June 2007.
Helena Inclusive Transit Planning Grant Round 2 Service Improvement Planning -Recommended Local Transit Service Improvement October 21, 2014 Presented.
Feasibility Study Jonathan CalderwoodJune 14, 2013 West Shore Communities Feasibility of Sustainable Transportation with Passenger Ferry Service.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
LA GUARDIA AIRPORT: AN ANALYSIS OF AIRPORT EXPANSION AND ACCESSIBILITY Dennis Levene.
Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Patrick R. Vasicek, P.E. Art Anderson Associates.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
SHIP REPAIR, VESSEL CONSTRUCTION & BOAT BUILDING IN DURBAN HARBOUR AUGUST 2010 SUMMIT PRESENTATION BY KEN FROISE 1.Introduction 2.Transnet / Ethekwini.
Seagrass and Salt Marsh: Critical Coastal Habitats
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Port of Redwood City Mitigated Negative Declaration Eagle Rock Aggregates Marine Receiving Terminal Prepared by AMEC Earth & Environmental Inc. April 25,
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
A Strategy to Improve Public Transit with an Environmentally Friendly Ferry Service San Francisco Bay Area Water Transit Authority Implementation and Operations.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Prince William County Potomac River Commuter Ferry Study & Route Proving Exercise A Summary of Project Purpose and Results Presented by: Charles “Cody”
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Florida’s First Eco-Sustainable City. 80,000+ Residential Units 10 million s.f. Non-Residential 20 Schools International Clean Technology Center Multi-Modal.
NSCAD - New Media School | Reinaldo Torres | Spring Design Studio | Instructor: Wassim Jabi Ph. D Nova Scotia - Halifax Region Halifax Dartmouth.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Water Emergency Transportation Authority 1 San Francisco Bay Area Draft Strategic Plan January 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Water Emergency Transportation Authority 1 San Francisco Bay Area Draft Short Range Transit Plan January 2016.
December 14, 2015 W E L C O M E SIMONTON LAKE H.O.A.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Downtown Marina Authorization for 30% Design Contract for Downtown Marina and Adjacent Areas & Functions Stockton City Council December 6, 2005 Agenda.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Rob Conley City of Hamilton
FCommerce A Perspective on Water Transportation For the NCR
Capital Programming Committee South Coast Rail Phase 1 Service
Bus Rapid Transit Study
I-85 Corridor Light Rail Transit Feasibility Study
WESt Sammamish park project
Ducks Unlimited conserves, manages, and restores wetlands and associated habitats for North America’s waterfowl. These habitats also benefit other wildlife.
Rural Transit Stop Design Guidelines Prof Omer maaitah
Presentation transcript:

Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental Assessment Biological resources & sensitivity Wake and wave analysis Dredging requirements Conceptual Design & Cost Estimate

Why Ferry Service? Water Transit Authority forecasting indicates there is a potential market Redwood City is the southernmost accessible location in the Bay Ferry facilities and service provide a significant contingency mode It is a wonderful way to travel that attracts additional riders to transit

Terminal Needs 2025 forecast anticipates 1,950 daily riders between Redwood City and San Francisco; 460 daily riders between Oakland and Redwood City Hourly service to/from San Francisco; peak period only to/from Oakland Floating dock, accessible gangway, shelter, ticket vending, parking, and bus circulation

Locational Issues Find a site acceptable to permitting agencies Minimize vehicular conflicts with existing Port traffic Provide sufficient parking to meet demand Minimize vessel travel time in channel Allow rail access for potential future connection

Figure 1. Sites Considered

Figure 2. Site Selected for Ferry Terminal

Westpoint Slough Location Availability of land for landside facilities (short-term and long-term) Vehicular access available Compatible with BCDC Seaport Plan and Port needs Proximity to Pacific Shores development for “walk-in” ridership Shortest vessel travel time

Figure 3. Access Route to Westpoint Slough Terminal

Environmental Assessment/Fatal Flaw Analysis Redwood Creek channel is dredged for much larger vessels Bair & Greco Islands part of National Wildlife Refuge Special status plant and wildlife species in or near project area Landside and waterside environment already disturbed sites Preliminary estimate of 17,000 cubic yards of dredging required

Figure 4. Required Dredging Depths

Figure 5. Proposed Route and Depths

Figure 6. Location of wetlands

Conceptual Design & Cost Estimate WTA standard floating dock with ADA accessible gangway Passenger shelter 500 space parking lot/drop-off and pick-up Access via 4-lane portion of Seaport Blvd. Phased development of parking $13 – 13.5 million facility cost

Figure 7. Full Build-out Terminal Layout