Getting Started Installing GreenHills and Net+OS Setting up the Development Board Building the Sample Application.

Slides:



Advertisements
Similar presentations
Reprogram the DAGR and Maps Installation
Advertisements

ComfortLink™ II Control. ComfortLink™ II Smart Control This is not just a thermostat. It’s an energy command center. Trane ComfortLink™ II is an easy-to-use,
DAP-1520 FAQ’s Wireless AC750 Dual Band Range Extender.
Computer Basics 1 Computer Basic 1 includes two lessons:
SAM9263-EK RevB WinCE 6.0 DEMO (All-in-NAND) AT91 SAM9 Product Group. Version 1.1 May 2008.
2.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 2: Installing Windows Server.
Lesson 15 – INSTALL AND SET UP NETWARE 5.1. Understanding NetWare 5.1 Preparing for installation Installing NetWare 5.1 Configuring NetWare 5.1 client.
Lesson 18 – INSTALLING AND SETTING UP WINDOWS 2000 SERVER.
Lesson 5-Accessing Networks. Overview Introduction to Windows XP Professional. Introduction to Novell Client. Introduction to Red Hat Linux workstation.
Network Printing. Printer sharing Saves money by only needing one printer Increases efficiency of managing resources.
Lesson 4-Installing Network Operating Systems. Overview Installing and configuring Novell NetWare 6.0. Installing and configuring Windows 2000 Server.
The sequence of folders to a file or folder is called a(n) ________.
Overview Basic functions Features Installation: Windows host and Linux host.
1 Chapter Overview Installing New Hardware Installing Updates Managing Client Access Licenses Troubleshooting Boot Problems.
1 Chapter Overview Introduction to Windows XP Professional Printing Setting Up Network Printers Connecting to Network Printers Configuring Network Printers.
How to Install Windows 7.
SET UP COMPUTER ** PLEASE BE AWARE SCREENSHOTS MAY NOT MATCH **
Operating Systems Day 3. Changing Date & Time 1.Double click on digital clock on the notification area of a task bar (Click start button, Click control.
1 Chapter Overview Preparing to Install Windows XP Professional Installing Windows XP Professional from a CD-ROM Installing Windows XP Professional over.
Introduction Purpose Objectives Content Learning Time
This example is a step by step walkthrough for installing the SRH Front Desk Printer in Windows 8.
 The operating system is essential for the computer; without it the computer could not work.  The main function of any operating system is being an intermediary.
PC Admin ARIA IP - 60 Anton Hattingh. Overview PC Spec. Requirements Connection Type S/W Installation Basic system Info Site info User Management.
MoteWorks Installation
Microsoft Windows 2003 Server. Client/Server Environment Many client computers connect to a server.
Silicon Labs ToolStick Development Platform
© 2007 NeoAccel, Inc. NeoAccel SGX Installation Guide Dear Customer: We are pleased to provide you with our training presentation for our SSL VPN-Plus.
Uniflair pCOWeb Ethernet interface card.
1.Overview 2.PC Spec. Requirements 3.Connection Type 4.S/W Installation 5.Main Window 6.Menu 7.Operation 8.Demo & Practice PC Admin.
RemoteDrive. OVERVIEW OVERVIEW The RemoteDrive is a special software running on Windows TM and controlling the devices manufactured by Elettronica Santerno.
Introduction to HP LoadRunner Getting Familiar with LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Thrive Installation.
CSCI 1101 Intro to Computers 6. Local Area Networks.
Configuring the MagicInfo Pro Display
The GreenHills Tool Chain
AT91SAM9261-EK WinCE 6.0 DEMO ATMEL AT91 Application & Support Group
Guide to Linux Installation and Administration, 2e1 Chapter 3 Installing Linux.
Online PCADMIN. 2/32 Always Surpassing Customers Expectations 1. Contents  Overview  PC Spec. Requirements  Connection Type  S/W Installation  Main.
Tutorial 11 Installing, Updating, and Configuring Software
Hands-On Virtual Computing
NET+OS 6 BSP How and why it was restructured Changes to memory map New features How to port to custom hardware.
AT91SAM9261-EK WinCE 5.0 DEMO ATMEL AT91 Application & Support Group Version 1.O February 2007.
Gorman, Stubbs, & CEP Inc. 1 Introduction to Operating Systems Lesson 4 Microsoft Windows XP.
Installation Guides Mehdi Osooli M.S.C in Epidemiology Department of Epidemiology & Biostatistics School of Public Health Tehran University of Medical.
Chapter 2: Installing Windows 2000 Professional. Overview Preparing for Installation Installing Windows 2000 Professional from a Compact Disc Installing.
Plataforma Windows 2000 Ing. Iván Méndez Alvarado.
Debugging an Application Lab. Build/Debug Process A start Load Closest Sample “debug” into MULTI editor Cut and Paste Changes into Sample Build Modified.
Active-HDL Interfaces Debugging C Code Course 10.
Department of Electrical Engineering, National Taiwan Ocean University NuMicro MCU Learning Board SDK Installation 1/29/2015 Richard.
Module 1: Installing Microsoft Windows XP Professional.
Lesson No: 6 Introduction to Windows XP CHBT-01 Basic Micro process & Computer Operation.
SAM9260-EK WinCE DEMO AT91 SAM9 Product Group. Version 1.0 October 2006.
OCS Stand Alone Print and Time Vend. Stand Alone Software Features - Print vending to local card reader. - Print vending to accounts which can be centralized.
Installing a Network Printer. Network printers work much like any other printer except the data flow is through a network. This means the printer must.
Installing or Upgrading to Windows Overview Preparing for Installation Installing Windows 2000 Professional from a Compact Disc Installing Windows.
1 Syllabus at a glance – CMCN 6103 Introduction Introduction to Networking Network Fundamentals Number Systems Ethernet IP Addressing Subnetting ARP DNS.
VMWare Workstation Installation. Starting Vmware Workstation Go to the start menu and start the VMware Workstation program. *Note: The following instructions.
1. At least two computers 2. Network adapters for each computer. The cost should be approximately $ If you have a 10Base-T adapters, and only.
© 2008, Renesas Technology America, Inc., All Rights Reserved 1 Introduction Purpose  This training course demonstrates the Project Generator function.
Windows Installing or Upgrading to Windows 2000.
Automating Installations by Using the Microsoft Windows 2000 Setup Manager Create setup scripts simply and easily. Create and modify answer files and UDFs.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
© 2013 Eaton Corporation. All rights reserved. Installing easySoft-Basic 6.
Create setup scripts simply and easily.
Lab 1: Using NIOS II processor for code execution on FPGA
Obtaining the Required Tools
Software Setup & Validation
Presentation transcript:

Getting Started Installing GreenHills and Net+OS Setting up the Development Board Building the Sample Application

GreenHills/Net+OS Prerequisites Recommended workstation –>= 133 MHz Pentium-based –120 Mb free hard drive space –>= 32 Mbyte RAM –CDROM drive –1024 X 768, 256-color display –Mouse –Hyperterminal or similar terminal emulator installed –Windows 98 or more recent –Internet Explorer 3.01 or more recent Obtain IP address/gateway/subnet mask for boards (or plan to use DHCP)

Main Menu Options Select First for New Install Select First for Upgrade MULTI must be installed first; Net+OS install overwrites files.

GreenHills Licenses Duration –Evaluation Supplied with Development System Effective for 30 days Should be replaced by permanent in most cases –“Permanent” Requires P.O. Number Request from NetSilicon License Administrator Good for 180 days Type –Network: company buys “n” seats shared among network users –Locked to computer: keyed to individual workstation –Locked to dongle: requires hardware key that can be moved among workstations to allow each exclusive use of product

Installing the License Key Must create new folder to install Copy the attachment to the from the License Administrator into the new folder Run Start >> Programs >> MULTI 2000, ARM v2.1&v3.5 - NETsilicon's NET+ARM>>Licensing>>Install Licenses From the dialog box, highlight the key file and click on Install

Board Connections Connect the RJ45 port on the development board to the workstation’s LAN card or a hub. Cable the board’s serial port to the workstation’s serial port using a cross-connect cable.. Set the workstation serial port to 9600,n,8,1,HW flow. From the front (LED’s toward you), attach the ICE at P2 with the red stripe toward the right. Attach the ICE interface to the workstation: –If Raven, parallel port to workstation ECP/EPP port. –If Jeeni, serial port to alternate workstation serial port. Power up the ICE and the development board. Board reset is SW 5, near connector P5U.

Modifying the Board Configuration Press any key in the specified time, followed by M, to modify To accept current value, press Enter

This is the main builder window Building the First Project

Once all files are present in project workspace, building is readily done Building the Project

The Baseline Application Project Configuration Files (*.bld); Source path, System include directories, etc. Included Libraries; ThreadX, TCP/IP Stack, Drivers, BSP Integration C and Assembly Source Files; Common to all Projects Linker File (*.lx); Map the Software to the Hardware Memory Map

“Hello World” From root.c…

Connecting to Target (1of 3) In the Builder, choose Remote > Connect to Target.

Connecting to Target (2 of 3) Enter OCDSERV command line.

Connecting to Target (3 of 3) Two new windows »IN/OUT –Displays Printf’s »TARGET—can read/write to Memory/CPU

Starting Debugger In the Builder select Debug > debug

Download code to Target Click “play” button or (F5)

Run Program Program is Running Use breakpoints or step through code

Getting Started Summary Install GreenHills Obtain GreenHills 30-day license Install Net+OS Set up Board and Debugger Build and run first application [Order GreenHills “Permanent” License]