Power System Simulator Demands for Multiple Control Center Training Mikhail Nesterenko IEEE WGOT Workshop Orlando, FLDecember 6-7, 2011.

Slides:



Advertisements
Similar presentations
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Goshen Area Bus Reconfiguration
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
August 14, 2003 Blackout Final Report
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
Ee392n - Spring 2011 Stanford University Intelligent Energy Systems 1 Lecture 3 Intelligent Energy Systems: Control and Monitoring Basics Dimitry Gorinevsky.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Three-Phase ac Voltage Generation
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
SUBSTATION MODELING: PROTECTION AND AUTOMATION
ET2105 Electrical Power System Essentials
Supervisory Systems.
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Electrical Distribution Training
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Farid Katiraei Ph.D. Candidate
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Model-Centric Smart Grid for Big Data
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ABB Power Technologies Network Management ABB Industrial IT for Network Management.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
Smart Grid Schneider Electric Javier Orellana
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
FRCC System Restoration 2016 FRCC System Operator Seminar.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
V7 Foundation Series Vignette Education Services.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Black Start Study Report
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
IG BASED WINDFARMS USING STATCOM
Selected ICT-based Wide-Area Monitoring Protection and Control Systems (WAMPAC) applications
Grid Integration of Intermittent Resources
EE6501 POWER SYSTEM ANALYSIS
the CERN Electrical network protection system
Peter Erning, PSP-T11, Power Gen 2010
DEC System Voltage Planning - June 2018
Interconnection of AES With The Grid
Solar Energy Commercialization
Presentation transcript:

Power System Simulator Demands for Multiple Control Center Training Mikhail Nesterenko IEEE WGOT Workshop Orlando, FLDecember 6-7, 2011

Motivation and Requirements complex interconnected power systems require management of multiple teams of operators in day-to-day and emergency conditions – adequate training is essential – potential training session types cooperation joint system management under non-emergency conditions emergency response competition simulation requirements – high fidelity is essential: instructor may be remote  cannot help trainee deal with simulation deficiencies and limitations – need to provide networked training – support variety of industry SCADAs

Outline Monitor Electric, Finist introduction demo power system: Finist Energy transitional process modeling multi-control center training setup and operation lessons and challenges

Monitor Electric Introduction founded in 2003, core team together since early 90-ies HQ in Pyatigorsk, Russian Federation (RF) 130+ employees target market: information systems for control centers in electric power industry lines of business: software development, sales and 24/7 support products: – SCADA/EMS product line CK-2003, CK-2007, CK-11 installed in all RF System Operator control centers (CDO, IDO, RDO), all RF nuclear plants, Federal Grid Company offices and some individual utilities in RF and abroad – operator training simulator Finist – electronic logbook, the standard for operational record keeping in RF power companies – online event and bids recording and clearance software for an electric power management system

FINIST advanced operator training simulator power system model – models transitional and long-term system dynamics (200 ms down to 14 ms integration steps) – continuously computes dynamics and loadflow on basis of it – no theoretical limitations on size, computed 40,000 bus system in real-time – sophisticated tools for adapting the model for specific power system – CIM/GID from the ground up training – role-based, with dedicated role workplaces – multi-control center support – sophisticated scenario development and execution functionality – ease of integration with industry SCADA/EMS – its own GUI – model navigation processor installations: 60 control centers in RF System Operator, United Dispatch Agency of Belarus, pilot in the US

users in interact with Finist in roles; for each role Finist offers a workplace – a set of conveniently arranged tools; during training session Finist can play back pre-configured scenarios of faults or other external events Finist Roles & Workspaces trainee – operator workplace presents standard tools for operator to control the system, used for backup of SCADA interface instructor – conducts training, provides responses of peer operators; workplace allows to start/stop/speedup simulation, launch scenarios, introduce disturbances, etc. examiner – evaluates training; workplace automates evaluation, maintains log, shows and plots “ground truth” system parameters, accumulates aggregate statistics about trainee’s performance technologist - configures and debugs technological parameters of a training session; catalogues scenarios and scenario components for quick access and reuse; contains two main components: scenario editor - configures and debugs a training scenario initial case editor – designs and troubleshoots starting case, presents the power system as hyper-linked set of objects training time roles and workplaces configuration workplaces 6

power system model CIM server side FINIST clients Finist server computation engine Technologist’s Workplace Instructor’s Workplace Examiner’s Workplace Trainee’s Workplace SCADA/EMS simulation time module scenario playback module HSDA module external control center representation and communication module GES module GDA server protection relay and other equipment simulation modules GID-compliant application training session configuration package scenario XML external clients processing modulesinterface modules client side GDA IEC IPC, OPC rtdbcon HDSA GES GDA system state instantiation XML training session clients configuration clients Finist Agent FINIST Architecture 7 scenario editor initial case editor

Finist Multi-Site Training Setup examiner instructor Finist server SCADA/EMS trainees SCADA/EMS site A site C site B phone communication HSDA/GES OPC IPC IEC

Outline Monitor Electric, Finist introduction demo power system: Finist Energy transitional process modeling multi-control center training setup and operation lessons and challenges

Demo Power System: Finist Energy Finist Energy (FE) 3525 MW generation, ~4500 MW load 7 power plants (nuclear, hydro, coal, gas) 54 substations (138, 230, 500 kV) 5 regions: Center, East, North, South, West 5 flowgates synchronous condensers, shunt reactors and capacitors, SVC, phase-shifters neighbors Interconnection: 90 GW gen. 79+ GW load Balancing Areas GW generation, 3.2 GW load GW generation, 3.2 GW load 3.4 GW generation, 3.1 GW load 500 kV 230 kV 500 kV Balancing Area kV Finist Energy Balancing Area-1 Interconnection 500 kV Balancing Area-3

Finist Energy Overview Diagram energized line de-energized line substation 500 kV nuclear powerplant energized line de-energized line substation 230 kV thermal, hydro powerplant energized line de-energized line substation 138 kV thermal powerplant voltage frequency  82 active power flow  48 reactive power flow neighbor area  137 flowgate

Finist Energy Overview Diagram energized line de-energized line substation 500 kV nuclear powerplant energized line de-energized line substation 230 kV thermal, hydro powerplant energized line de-energized line substation 138 kV thermal powerplant voltage frequency  82 active power flow  48 reactive power flow neighbor area  137 flowgate North West East South Center FE Regions

Finist Energy Overview Diagram energized line de-energized line substation 500 kV nuclear powerplant energized line de-energized line substation 230 kV thermal, hydro powerplant energized line de-energized line substation 138 kV thermal powerplant voltage frequency  82 active power flow  48 reactive power flow neighbor area  137 flowgate Neighboring Areas

Finist Energy Overview Diagram energized line de-energized line substation 500 kV nuclear powerplant energized line de-energized line substation 230 kV thermal, hydro powerplant energized line de-energized line substation 138 kV thermal powerplant voltage frequency  82 active power flow  48 reactive power flow neighbor area  137 flowgate Powerplants

Outline Monitor Electric, Finist introduction demo power system: Finist Energy transitional process modeling multi-control center training setup and operation lessons and challenges

simulation time increment incoming event processing system model parameter adjustment topology change? conversion to bus-branch form yes no to next time period external events from other modules model state publication model state info to other modules island processing thread transitional dynamics powerflow calculation differential equation integration long-term dynamics powerflow calculation differential equation integration Transitional Process Modeling transitional dynamics – models rotation of each generator rotor with separate system of differential and linear equations – allows greater fidelity in simulating critical events: islanding, topology changes, emergency system states – requires significant computational resources and time, traditionally not modeled long-term dynamics – assumes all rotors in same island rotate with the same speed, rotor acceleration is averaged across island – may lead to lack of powerflow convergence, incorrect system behavior – faster, simpler to simulate

energized line de-energized line substation 500 kV nuclear powerplant energized line de-energized line substation 230 kV thermal, hydro powerplant energized line de-energized line substation 138 kV thermal powerplant voltage frequency  82 active power flow  48 reactive power flow neighbor area  137 flowgate contains two lines – Interconnection-Tidd 500 kV line – Delaware-Crook 230 kV line connects East, South, BA-2 and BA-3 to rest of the system reliability constraint: 750 MW in either direction Flowgate 2

Example Contingency loss of 500 MW generation unit at BA-3 overloads Flowgate 2: ~750 MW flows East breaker CB-10 at substation Tidd is under scheduled maintenance potential transformer at 500 kV Bus 1 at Tidd explodes bus protection system de-energizes Bus 1, opens connected breakers: – tripping Interconnection-Tidd 500 kV line – leaving Flowgate 2 with only Delaware-Crook 230 kV line critical contingency: lack of state stability, rest depends on simulation method: 1.long-term dynamics only: forces powerflow computation convergence, leads to unrealistic single-island state with large voltage drop across Delaware-Crook 230 kV line 2.transitional processes, no out-of-step protection: all generators in East area trip out due to loss of synchronism 3.transitional processes, protection engaged (realistic): out-of-step relay executes at Delaware-Crook, line trips out, splitting system into two islands: main and East (with over 1000 MW deficit)

1. Long Term Dynamics Only 3180 A after Interconnection-Tidd 500 kV line trips power flow across remaining Delaware-Crook 230 kV line goes from ~12 MW to over 843 MW (unrealistic) system remains connected, no generator trips, no swings, no outages generator trips at BA-3 Interconnection -Tidd trips active powerflow across Delaware-Crook, MW

2. Transitional Processes, No Relays 500 kV line trip causes out-of-step operation, critical current swings across Delaware-Crook 230 kV line, all East region generators eventually trip, system remains connected generator trips at BA-3 Interconnection -Tidd trips active powerflow across Delaware-Crook, MW

3. Transitional Processes, Relay Engaged 500 KV line trip leads to out-of-step relay at Delaware-Crook 230 kV line detects out-of-step operation and trips the line system splits into two islands generator trips at BA-3 Interconnection -Tidd trips active powerflow across Delaware-Crook, MW relay islands East

Outline Monitor Electric, Finist introduction demo power system: Finist Energy transitional process modeling multi-control center training setup and operation lessons and challenges

Wi-Fi Demo Multi-Control Center Configuration Finist server instructor FE Simulation Support Computing Center FE South Regional Control Center trainee third party SCADA FINIST Operator’s Workplace (emulating remote SCADA) Laptop 3 Laptop 1 Laptop 2 FE Central Dispatch HSDA/GES/GDA file exchange responsibilities maintains area interchange, frequency regulation coordinates powerflow across 500 kV lines, implements switching on 500 kV substations and powerplants contingency analysis, reliability maintenance responsibilities maintains voltage and reactive powerflows in the region does operational switching on 138, 230 kV lines, substations, powerplants

Example Training Session: East Split after outage Finist Energy split into two islands: main and East (with ~1200 MW deficit) Regional Control Center operator’s actions: orders New Tech Plant and Philo Plant to emergency generation pickup at 110% capacity sheds 50 MW load at Torrey substation resynchronizes with main island by closing Delaware-Crook line breaker at Crook eliminates low voltages by switching on banks capacitors FE Central Dispatch operator’s actions: requests 200 MW generation pickup at BA-3 requests 200 MW load shedding at BA-2 assigns load frequency regulation at East island to BA-2

Outline Monitor Electric, Finist introduction demo power system: Finist Energy transitional process modeling multi-control center training setup and operation lessons and challenges

Multi-Center Training: Lessons and Challenges advantages compared to single site – significantly greater realism of operator’s work environment: no visual feedback – only SCADA/EMS and phone communication – distributed training sessions are not as disruptive to operator work schedule distributed training session preparation – instructors from multiple sites need to participate in initial case and scenario preparation and troubleshooting instructor cannot keep up with controlling and evaluating multiple trainees operating at once – split roles: instructor/examiner – automate examiner’s functions: separate workplace – examiner at every site to engage lower level operators (substations, powerplants) – need to incorporate switching simulator data model too complex for instructor – hard to understand: two many levels for dispatcher at any level to be familiar with – need to hide complexity – hard to control: upper levels rely on lower-level human operators for details – need to replace with sophisticated scenarios need to balance system realism with usability – realistic power plant pickup takes hours; – acceleration throws protection systems and generator controls off track major goal: maximum effectiveness of operator training Thank you Any questions?