Production visibility: KPI’s in Real-time BASF – The Chemical Company

Slides:



Advertisements
Similar presentations
Factory Objectives Value of Asset Management Strategies.
Advertisements

OCEAN DATA SYSTEMS Presents Wonderware HMI Reports
System Platform The Base For Enabling Intelligent Operations At A Gold Mine André Vuilleumier Managing Director.
SEE System Design Product Presentation The Computer-Aided Design Specialist dedicated to Electrical Engineering, Systems and Industrial Fluids.
12-Apr-15 What is legacy DCS. How it looks?. 12-Apr-15 What is DCS? Integrates the PLCs and process controllers of a process line. Enables you to manage.
Machine Monitoring Software
HP Quality Center Overview.
© 2009 OSIsoft, Inc. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Jonathan Procopio, Project Engineer,
1 Parker Factory Display – The Next Generation Next Generation:
Cogent DataHub Overview Presenter: Win Worrall.
Batch Implementation at Plascon Mobeni Gus Krüger Convenient Software Solutions (Pty) Ltd.
An off the shelf system for Downtime and OEE Reporting.
Wonderware Performance Software
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Wonderware Performance Software 3.5 “Real-time Visibility into Equipment Performance” Alex Chia Solution Sales Manager.
1 Corporate Overview. 2 Addressing the Knowledge Gap GroupCytek  Formed 2005  200 plus staff and associates including consultants, project managers,
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Operations Management
The Magical World of Chocolate Manufacture
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
Andrea Sartori Solution Architect EMEA
Information delivery and reporting with Wonderware tools Ernst van Wyk Wonderware Southern Africa.
Presentation to Baltimore-Washington DC Metro MPUG Chapter September 22, 2009.
1. 2 How do I verify that my plant network is OK? Manually: Watch link lights and traffic indicators… Electronically: Purchase a SNMP management software.
Glenn Cerny Chief Information Officer Lansing Community College Jennifer Pierce Portal/Web/HTML DB Developer Lansing Community College Scott Spendolini.
Solutions with Wonderware Historian and Active Factory Client Richard Anderson Regional Sales Manager.
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
COGNOS INC. Eddie Haizlip Danny Roach Greg Sparks.
Vítkovice STEEL, Czech Customer Success Story
System Platform – An introduction
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
By Jacques Terblanche Johnson Matthey
Wonderware System Platform “Software Solutions for Real-Time Success”
Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales.
What you’ll take away: 1.Define team and schedule 2.Software and hardware specifications 3.Analysing 4.Configuration and migration 5.Validation and Test.
SCADA. 3-Oct-15 Contents.. Introduction Hardware Architecture Software Architecture Functionality Conclusion References.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
LAB CVP 2009 ‘Leveraging the LIMS Investment’. Invested in a Laboratory Information Management System (LIMS) Solution is limited to Storing and Reporting.
1 GE Fanuc ©2008 GE Fanuc Intelligent Platforms All Rights Reserved Proficy* DataMart v1.0 Barry Lynch Product Manager GE Fanuc Software Puts the “E” in.
1 Advanced topics in OpenCIM 1.CIM: The need and the solution.CIM: The need and the solution. 2.Architecture overview.Architecture overview. 3.How Open.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
James Madison University April 19, 2002 InSource Software Solutions Diane Eakin, Sales Consultant John Burgmaster, Sr. Applications Engineer Rodney Mullins,
Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.
Best Practice: Alarming for Wonderware System Platform
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Topics of presentation
Quality Management to Increase Yield and Profits Alex Chia Solution Sales Manager.
Bringing plant information to the office in real-time Johan Louw Automation Specialist Lonmin.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
SuiteVoyager & Terminal Services Information Anytime, Anywhere, Anyway.
Integrated Monitoring Dashboard SEAP/BTIS/DB&I/Mar Integrated Monitoring Dashboard An Innovative Monitoring Approach Proposal by BTIS/DB&I.
Kiran Barn, PI Users Conference 2000Slide 1 Kiran Barn, Principal Engineer. Slide 1Kiran Barn, PI Users Conference 2000.
© 2009 IBM Corporation Maximize Cost Savings While Improving Visibility Into Lines of Business Wendy Tam, CDC Product Marketing Manager
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Route Optimisation Using Wonderware Transnet Saldanha Bulk Terminal Emma Livesey Engineer – Hatch Africa.
© 2015 X-tensive CNC monitoring system Discrete Process Automation.
Debswana Orapa and Letlhakane Mines – Using Wonderware Data Historian to build reporting tools Kabo Phetlhu IT Analyst - Systems.
System Platform - building re-usable Standards Presenter: Dries van Schalkwyk Control Systems Integration.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
REPORTING SOFTWARE for BUILDING & INDUSTRIAL AUTOMATION.
© Siemens AG 2013 Are you getting the most from your CEMS? Bob Lane Siemens Process Analytics Air Quality Exhibition March 13 th, 2013.
Bread Production Line Screen Images
How SCADA Systems Work?.
IndusAuto Technologies
Your Next LIMS: SaaS or On-Premise? Presented by:
Top Strategies for Asset Performance Management (APM)
Cloud Makes End-to-End Management Affordable for Apparel Industry Businesses “Windows Azure IaaS has allowed us to quickly deploy and deliver our solutions.
Presentation transcript:

Production visibility: KPI’s in Real-time BASF – The Chemical Company Thank you for joining me today. I am Sharon Brown from Wonderware and am presenting a client in the Eastern Cape that was unfortunately called away to important meetings and could not join us. The study is about PROODUCTION VISIBILITY BY PROVIDING Real-time Key Performance Indicators to the users. Sharon Brown Wonderware S.A.

Introduction BASF - The Chemical Company “We were able to reduce scrap, downtime and smoothed change-overs by the increase in total visibility of our production process” Quote “We were able to reduce scrap, downtime and smoothed change-overs by the increase in total visibility of our production process” from BASF:

Introduction Agenda Project Solution Benefits Considerations Summary Agenda - Introduction

BASF – Chemical Company International Company Diversified foot print around the world Chemicals are it main business In South Africa, it includes plastics, polyurethanes, agricultural, leather, chemical and automotive sectors. BASF Port Elizabeth Catalytic converter industry One of the highest users of precious metals for the automotive sector Roughly 39% market share, which represents roughly 5.5 million parts in 2008. Foot print Chemicals are it main business BASF Port Elizabeth Catalytic converter industry A petrol converter consistent of a single converter, as the main aim is to “catch” the carbon emissions. A diesel converter Mixing slurry and coating process Process involved is a top down process, beginning with slurry manufacturing on-site. Involves mixing various acids, precious metals, di waters and various stabilisers, in order to make the mix required by each customer. Each customer has different specifications for their parts. Roughly 300 slurry types. Mixing of slurry and subsequent QC and QA testing and approval occurs before production coating can commence. Reason is primarily weighted in the favour of managing waste, and ensuring the slurries are correctly made, as waste of precious metal is expensive! Production is done on the bottom level, where various types of machines are used depending on the technology which is being coated. BASF is one of the highest users of precious metals for the automotive sector BASF has roughly 39% amount of market share, which represents roughly 5.5 million parts in 2008 4. roughly 39% amount of market

Process Background Slurry Manufacturing Q/A Production Mixing Customer / Part Specific Slurry are mixed Q/A Quality checks Manage waste Production Coating lines Various machines – client chosen technology SLURRY AREA MIXING AREA LABORATORY / QA Slurry manufacturing on-site. This involves mixing various acids, precious metals, di waters and various stabilisers, in order to make the mix required by each customer. Each customer has different specifications for their parts, and varies in pm content, volume etc. Roughly 300 slurry types exist. Mixing of slurry and subsequent QC and QA testing and approval occurs before production coating can commence. Reason is primarily weighted in the favour of managing waste, and ensuring the slurries are correctly made, as waste of precious metal is expensive! Production is done on the bottom level, where various types of machines are used depending on the technology which is being coated. For instance, the catalyst for a Renault, compared to diesel 4x4 varies in both coating technique, to physical size, and emission type, and thus the type of machine used can be very different. A petrol converter consistent of a single converter, as the main aim is to “catch” the carbon emissions. A diesel converter has two components, the first being similar to a petrol catalyst, to catch the emissions, the second converter being much larger, to catch the soot emissions. The soot converter flushes itself with the back burn process. COATING LINES PRODUCTION AREA

Introduction Agenda Project Solution Benefits Considerations Summary

Topology - Before new installation Network TCP/IP (LAN) MIXING AREA PRODUCTION AREA SLURRY AREA LAB / QA InTouch SCADA LIMS – ORACLE DB MS SQL Server InTouch 22 Stations Appr. 50 000 I/O 25 K Historian 10 A/F Clients Siemens (S7) on Ethernet Topology

No real-time visibility of the process. Key Requirements No real-time visibility of the process. Equipment Status Process Status Maintenance Status Lack of communication between production and maintenance staff due to lack of information. No access to key performance indicators Production variables Production Rate / Figures key requirements No real-time visibility of the process. Equipment Status – Downtime of equipment Process Status – where are they in the production process Maintenance Status Lack of communication between production and maintenance staff due to lack of information. No access to key performance indicators Production variables Production Rate / Figures

Key Requirements More central monitoring of production flow The information was only available at SCADA level at the machine Required access to production reports by management More central monitoring of production flow The information was only available at SCADA level at the machine It was only the operator that had access to production and machine statusses, alarms etc. Data availability to both maintenance and production Any problems occurring on the lines, had to be carried over by the operators on the line Always after-the-fact and unclear who’s responsibility it is. Required access to production reports by management There were no reporting automatic reporting structure in place. No summarized data on a production run that included both production, Q&A and maintenance related figures.

Project Goals - Technical Install a central repository of real-time data that links the current SCADA’s, production databases and LIMS data. Capitalize on already available infrastructure of Wonderware SCADA and Historian Make the operation more visually representative to all involved using a Web interface Install a central repository of real-time data that links the current SCADA’s, production databases and LIMS data. Capitalize on already available infrastructure of Wonderware SCADA and Historian Make the operation more visually representative to all involved using a Web interface

Project Goals - Business Due to the nature of the business, the raw material are of extreme high value i.e. precious metals – platinum Main goal is to keep scrap levels as low as possible and minimize rework and production cost. How? Due to the nature of the business, the raw material are of extreme high value i.e. precious metals – platinum Main goal is to keep minimize rework, scrap levels as low as possible and minimize production cost. How?

How to realize these Goals Need to reduce downtime Anticipate production problems Departments to take joint responsibility for critical dependencies Reduce change-over times Improve overall coating rate Need to reduce downtime Re-act quicker to problems Anticipate production problems Departments to take joint responsibility for critical dependencies i.e. make it more visible in terms of responsibility Reduce change over time

Existing Wonderware install base. Why Wonderware Existing Wonderware install base. InTouch SCADA network of appr. 50 000 I/O Wonderware Historian 2K5 and Active Factory clients BASF wanted to utilise their present investment Scalability of the Wonderware solution

Why Wonderware Information Server from Wonderware (WIS) provided a solution Good working relationship has been built up with the supplier Top quality training is provided

Project Solution Solution aimed at making the information more centrally accessible Control Room environment Web Clients for managers Displaying the coating, slurry and operation information Production Data Downtime Machine and process Status Bringing maintenance, production and process engineering closer in terms of their separate operations

Implementation - Prerequisites First step Involve production and maintenance resources to determine the information needed Made each person Responsible for the availability of the data by Training Do own modifications on the SCADA Involvement Determine the information needed, how to display it, where to get it from Responsible availability of the data by providing them with training let them make the changes on the SCADA themselves. Taking ownership of the system

How it was implemented Installed the Wonderware Information Server (WIS) Gather data from various systems in the plant Both Wonderware and other sources. Control room set up with multiple large LCD displays Both production and maintenance used. Build web based reports for management Project took 3 months Wonderware Portal was not yet installed Data was sources from InTouch, LIMS (Oracle DB), a number of MS SQL databases where was logged from InTouch as well as data from the Historian The control room provides a holistic picture of the complete plant Accept for the real-time information, reports were built using Reporting Services and published using WIS From start to finish. The most consuming part was deciding what data we want to see and modifications had to be made to PLC’s, SCADA and the Historian to make it possible. Each plant section was responsible for their own data.

Data acquired – Multiple Sources ACTIVE FACTORY / WE CLIENTS LIMS Oracle DB SCADA Systems InTouch Historian / Information Server Schematic on Data flow SLURRY MANUFACTURING MS SQL Server 2005 COATING LINES MS SQL Server 2005 CONTROL ROOM

Topology Network TCP/IP (LAN) Active Factory Clients SLURRY AREA CONTROL ROOM Wonderware Historian MS SQL Server Web Portal – Information Server WIS Clients Active Factory Clients SLURRY AREA InTouch SCADA Plant PLC’s MS SQL Server MIXING AREA LAB / QA InTouch SCADA LIMS – ORACLE DB Plant PLC’s Topology PRODUCTION AREA InTouch SCADA Plant PLC’s

Control Room Wonderware Information Server (WIS) Clients Multi Views Trends and Charts Historian Average rates of the coating. Real-time Graphics InTouch KPI’s Downtime Status Alarm Conditions Data charting Table Weaver - Interactive, drill through data tables Drill-down Reports Table Weaver Collaborating Data from different sources

Introduction Agenda Project Solution Benefits Considerations Summary Agenda - Benefits

Benefits / Goals Achieved Initial Goal Comment Central Repository of real-time data Control Room with real-time data display from various system Capitalize on existing Wonderware installation No additional cost for software was incurred Provide value to all plant sections to improve production/maintenance Factory sections took ownership – previously under utilized SCADA network has become a crucial resource and tool. Reduce downtime, scrap levels and as a result production cost Reduction of 2,5 hours downtime per week as a result less scrap and an increase in production Improve Average Coating Rate Coating rates have improved – no percentage improvement available yet due to changes in processes. Busy analyzing new average rates. Initial Goal End Result Central repository of real-time data Control Room with real-time data display from various system Capitalize on already available Wonderware installation No additional cost for software was incurred Let all plant sections utilize the system to improve production/maintenance Production and maintenance took ownership – previously under utilized SCADA network has become a crucial resource and tool. Reduce downtime, scrap levels and as a result production cost Reduction of 2,5 hours downtime per week as a result less scrap and an increase in production

Introduction Agenda Project Solution Benefits Considerations Summary Agenda - Considerations

We started by doing training first Considerations Infrastructure (PLC network and LAN) was in place which made it easier to gather the data We started by doing training first Involving maintenance, production and process engineering made the project run smoother Infrastructure (PLC network and LAN) was in place which made it easier to gather the data We started by doing training first Good decision Can maintain and make changes ourselves Involving maintenance, production and process engineering made the project run smoother Correct information was made available from the beginning

Introduction Agenda Project Solution Benefits Considerations Summary Agenda - Summary

In Conclusion Richard Mangold Service Platform Manager “ The Wonderware package is very broad, the more training and awareness, the more it can be utilized becomes a true asset to the company.” “Attend more sessions, breakfasts and road shows – the benefits are there!” Richard Mangold Service Platform Manager “ The Wonderware package is very broad, the more training and awareness you can get from the distributors, the more it can be utilized to become a true asset to the company.” Attend more sessions, breakfasts and roadshows – the benefits are there!”

Thank you for attending Questions Thank you for attending Thank you for attending

Graphics Library