Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales.

Similar presentations


Presentation on theme: "Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales."— Presentation transcript:

1 Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales

2 Omniflex ► Omniflex South African Manufacturer of Industrial Electronic Products ► Founded 1965 as Conlog became Omniflex 1996 ► 50% of Turnover exported ► Sales Office JHB, UK, Australia Head Office Durban ► Wonderware and Sequence of Events recording since 1988 ESKOM, Sasol, Natref

3 Introduction This Project improves an ageing Coal Fired Power Station Root Cause Analysis by 90% Kardia Power Station Greece

4 Agenda IntroductionIntroduction Project Solution BenefitsBenefits ConsiderationsConsiderations SummarySummary

5 Kardia Power Station Greece Up to 50% of Greece’s Electricity from Coal (Lignite) 6 Lignite Fired Stations Agios Dimitrios Amyntaio Florina Kardia Megalopolis Ptolemais How much coal is required to run a 100-watt light bulb 24 hours a day for a year?

6 Background to the Project Location : Greece Operator : Public Power Corp Configuration : 4 X 300 MW Operation : Since 1975 …… Fuel : Lignite Boiler : Stein, Ganz-Rock T/G supplier : Alstom, LMZ, Teploenergo EPC: Zarubezhenergoproekt T/G Turbine Generator EPC Engineering Procurement Construction

7 Business Objective ► Plant Optimization ► Reduce Downtime ► Effective Alarm Localization ► Nuisance Alarm Identification ► High Availability ► Cost effective Solution

8 Operational Objectives ► Root Cause Analysis ► Alarm History ► Local Alarm Indication ► Fast and Reliable Event Capture ► Redundancy of I/O Processors

9 Agenda IntroductionIntroduction Project Solution BenefitsBenefits ConsiderationsConsiderations SummarySummary

10 Selection of Solution ► Local SI for Local Support ► Wonderware SCADA selected for ► Ease of configuration ► Minimal effort to integrate Date and Time Stamp at source event streams through OPC server

11 Sequence of Events Recording System

12 System Implementation ► 960 Relay Contact Inputs COS monitoring ► 960 Alarm Statuses Annunciated ► Input discrimination to 200μseconds ► Minimum Pulse Width 500μseconds ► Time Stamping Accuracy 200μseconds

13 System Diagnostics

14 Historical Alarms

15 Alarm Summary

16 Time Synchronization ► GPS Station Time ► OPC server Service

17 Controller Redundancy ► Dual Controller ► Includes Queue Services

18 Topology Field Inputs Marshalling Panel Ethernet Conet CAN SCADA OP C Modbus Primary Secondary

19 Disadvantages of Poll Response Disadvantages of a poll/response network · Poll/Response uses %100 of available bandwidth. · The data "Transport" is the "Application". You can't break them apart. · One protocol for all field equipment limits deployment of new technology & impedes migration to new topologies. · It is not a "managed" network. · One-to-One data relationship between the Host and field equipment Master Slave

20 Producer Consumer Subscription Producer eg SOE System Middleware Message Broker Eg Queue Service Consumer Application 1 Consumer Application 2 Consumer Application 3 Subscribe Publish Advantages: Network Traffic Minimized Efficient use of Network Bandwidth Multiple consumers

21 System Implementation ► In House Engineering and Testing and Configuration, SCADA, OPC, Maxiflex 1 week ► Local Panel Alarm Annunciators via Modbus RS485 ► Wonderware SCADA Final Configuration On Site ► Copy Paste for Second System 2 Days In House Engineering and Testing

22 Agenda IntroductionIntroduction Project Solution BenefitsBenefits ConsiderationsConsiderations SummarySummary

23 Benefits / Goals Achieved ► Plant Optimization  ► Reduce Downtime  ► Effective Alarm Localization  ► Nuisance Alarm Identification  ► High Availability 

24 Benefits / Goals Achieved ► Root Cause Analysis  ► Alarm History  ► Local Alarm Indication  ► Fast and Reliable Event Capture  ► Redundancy of I/O Processors 

25 Realised Benefits ► 90% improvement in Root cause analysis ► 25% improvement in Generating Availability ► 40 to 50% time saving in Maintenance ► Huge Saving on Hard Wired Annunciation ► Project Implementation Short ► End User Empowerment on system usage, migration and on going improvement ► Rapid Deployment of next Generator system

26 Agenda IntroductionIntroduction Project Solution BenefitsBenefits ConsiderationsConsiderations SummarySummary

27 Lessons Learned ► Learn to Speak Greek ! Real Greek ► Partnering with local Wonderware SI’s essential ► Preconfigured Wonderware for Front end Hardware from Factory simplifies field work

28 Agenda IntroductionIntroduction Project Solution BenefitsBenefits ConsiderationsConsiderations SummarySummary

29 Conclusions ► Wonderware was a good choice for seamless integration of Date and Time stamped events into an HMI for management of Alarm and Events. ► Wonderware Presence worldwide presented this opportunity for us from a South African and UK Base.

30 Project summary ► “The system works well and enables incidents to be tracked very efficiently”. Ilias Kalaitzis,Project Engineer, Control Systems

31 Project Summary ► Project Delivered in 2008 on time during Shut Down of Generator Unit Period 16 Weeks Entirety ► Second Unit simple Copy and Paste for SOE Configuration. Completed Dec 2008 ► We are expecting orders for the balance of 2 Generator Sets

32 Questions ? Solutions by Design